FERC Order 1000 Drafting team activated April Filing Interregional Coordination Transmission Planning Regions CAISO, Columbia Grid, NTTG, WestConnect Interregional.

Similar presentations


Presentation on theme: "FERC Order 1000 Drafting team activated April Filing Interregional Coordination Transmission Planning Regions CAISO, Columbia Grid, NTTG, WestConnect Interregional."— Presentation transcript:

1 FERC Order 1000 Drafting team activated April Filing Interregional Coordination Transmission Planning Regions CAISO, Columbia Grid, NTTG, WestConnect Interregional transmission facilities are those that are located in two or more neighboring transmission planning regions No requirement to produce interregional transmission plan Planning and Cost Allocation Stakeholder Meeting Jan 30 Fulsom

2 2013 NTTG Planning Activities Q5Jan-Mar1. Facilitate stakeholder review and comment on draft Biennial Transmission Plan 2. Receive updated information on Q1 data 3. Receive and prioritize 2013 Economic Study Requests Q6Apr-Jun1. Develop Economic Study Request Study Plan 2. Update Biennial Transmission Study Plan with updated (material) information if received 3. Perform additional analysis for Biennial Transmission Study Plan if required Q7Jul-Sep1. Conduct Economic Study Request study 2. Facilitate stakeholder review and comment of draft final Biennial Transmission Plan Q7Oct-Dec1. Develop Economic Study Request report 2. Submit Biennial Transmission Plan to Steering Committee for approval

3 2013 NTTG Planning Activities Feb 7 Biennial Plan Stakeholder Meeting 10 a.m. to 3 p.m. (Mountain) Salt Lake City UAMPS Conference Room 155 North 400 West, Suite 480 (Same building as WECC offices) More detail on NTTG Website www.nttg.biz


Download ppt "FERC Order 1000 Drafting team activated April Filing Interregional Coordination Transmission Planning Regions CAISO, Columbia Grid, NTTG, WestConnect Interregional."