Request & in-kind supportEarmarkedFurther requests UK 13 M Protons, Hall, Tracker 10 M£ Yes 3M£ US 23 M$ RF Amplifiers ($500k) + R&D 0.3+(1.2 negot.)M$

Slides:



Advertisements
Similar presentations
MICE CMPB Alain Blondel 12 January MICE status & news 1. Collaboration life Common fund Highlights since CM16: target test, ICST visit 2. funding.
Advertisements

Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
MUTAC Fermilab Alain Blondel 16 March Status of MICE MUTAC March 2006 at FERMILAB.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
1 paul drumm; ; FAC-PR MICE Project Status Funding Agency Committee 19 th September 2005.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE Project Status Report to the Funding Agency Committee 19 th September 2005 Paul Drumm MICE Project Manager.
MICE collaboration meeting Alain Blondel June MICE challenges organization global funding situation.
MICE collaboration meeting Alain Blondel June MICE collaboration meeting 12 at Frascati -- Introduction -- MICE: progress and challenges.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
K. Long, 26 June, 2015 Phase II: introduction to discussion Background (reminder) Responses Assumptions Presently planned bids Input to summary table Summary.
MICE CM15 Alain Blondel 8 June MICE CM 15 Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. today: -- reviews and.
MICE CMPB 3-Feb-2006 Alain Blondel 1 Status of MICE.
UK Funding PPRP Meeting on Monday 30 th June Accepted need for urgent work this year –no discussion on this –but also no indication of the level of funds.
UK Costs Beam & Infrastructure Coils Tracking Detector.
1 paul drumm; ; FAC-PR MICE Project Status Report to the Funding Agency Committee 19 th September 2005 Paul Drumm MICE Project Manager.
MICE Funding agency committee meeting Alain Blondel 1 MICE: challenges, organization, global funding situation.
MICE CMPB Alain Blondel 2 March spokesperson remarks CMPB 1. funding issues 2.planning the near future what slips and what does not risk areas 3.
DPNC Sept 2007Jean-Sébastien Graulich MICE The international Muon Ionization Cooling Experiment o o Introduction o o Beam Line o o Cooling Channel o o.
MANX meeting 15 July 2008 Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment MICE in 2011.
CMPB Alain Blondel 14 April STATUS OF MICE.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
MICE CMPB Alain Blondel 13 November MICE status & news 1. Collaboration life Common fund Highlights of CM16 2. funding requests: status 3. outstanding.
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
MICE CM15 wrap-up Alain Blondel 11 June MICE News Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. for those who.
MICE CM at CERN Alain Blondel, March 29 -> April MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from.
1 pd, PAC 2005 MICE Muon Ionisation Cooling Experiment Paul Drumm Rutherford Appleton Laboratory 19 th May 2005.
MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.
MICE CM in New York Alain Blondel, June MICE COLLABORATION Columbia University June 2003 Action List (online) 1.Funding and some organization.
MICE CM at OSAKA Alain Blondel, August MICE collaboration meeting at OSAKA (thanks to Mike Zisman, Makoto Yoshida, and Koji Yoshimura)Mike ZismanMakoto.
MICE : the Muon Ionization Cooling Experiment M. Yoshida (Osaka Univ.) for the MICE Collaboration Osaka - Overview and Status -
Alain Blondel – introduction MICE CM Collaboration meeting June 2007 at RAL Complete review of the project Organization of efforts towards.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
G. Martellotti1CSN1 14 / 10 / 2002 LHCb Category A M&O status for 2002 and estimate for 2003 Report on Common Fund and CORE expenses for RRB Ott.
MICE collaboration meeting Alain Blondel october MICE collaboration meeting 13 at RAL News The international context Goals of the meeting.
NFMCC 5-year Plan Update Michael S. Zisman NFMCC Project Manager Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review–LBNL April.
Takashi Matsushita Imperial College T. Matsushita 1 MICE Status Excerpt from talks at MuTAC review:
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MICE Phase 1 Koji Yoshimura KEK June
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
COMET μ-e conversion search at J-PARC. μ-e conversion physics SUSY-GUT, SUSY-seesaw (Gauge Mediated process) – BR = = BR(μ→eγ) × O(α) – τ→lγ SUSY-seesaw.
MICE news video conference 15 march MICE NEWS 1.TOF0/1/2 funding 2.MICE Installation/Commissioning/Operations group (MICO) 3.Important issues from.
WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
CHIPP Oct 2007Jean-Sébastien Graulich Status of MICE Jean-Sebastien Graulich, Univ. Genève o o Introduction o o Beam Line o o Technical Design o o PID.
CARE08 Dec 2008Jean-Sebastien GraulichSlide 1 MICE, a facility for precision beams and muon cooling o MICE in EuCARD o MICE Facility: Beam, Infrastructure.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
Budget Status and FY04 Requests Elton Smith Hall D Collaboration Meeting Dec 11-13, 2003.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Alain Blondel 4 April  Aspirational MICE Schedule as of April 2008 Febuary-July 2008 STEP I September 2008 November 2008 to summer 2009 STEP II.
Tuesday 9 th January Project Status Report Project Achievements Project Schedule Issues Finance Summary Risk Register Photos.
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
Collaboration Board RAL, 30 October 2015 Paul Soler, Stefania Ricciardi MICE Common Fund Status.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Ionisation Cooling Test.
MICE news Alain Blondel 20 – NEWS 1.CERN’s SPSC at Villars: recommandations 2.MICE step Upcoming gateway steps 4.RF from LBNL (Mike)
Collaboration Board 27/09/ Next RRB in October - Core and Common Funds in Projected M&O Cat. A budgets for the coming years - Received funds.
Status of the experiment in Italy
Presentation transcript:

Request & in-kind supportEarmarkedFurther requests UK 13 M Protons, Hall, Tracker 10 M£ Yes 3M£ US 23 M$ RF Amplifiers ($500k) + R&D 0.3+(1.2 negot.)M$ OK, shipped MRI proposal 2M$ … Japan 100 MJPY ~ 1 M$50 MJPY CH 3 MCHF PSI solenoid (3M€) ~0.25 MCHF/yr  2 FTE +DAQ OK coupling coil 1MCHF? Italy ≤1M€ in hardware: (MuCal, TOF0, I, II) 2 (or 1) tracker solenoids? --proposal submitted proposal postponed Belgium 100 k€ (~1/2 CKOV2)--100 k€ NL 100 k€ (Magnetic sensors)OKPostdoc+Student CERN RF Amplifiers (value 1.2 MCHF) NB MICE is CERN rec expt RE11 OKRF refurbish (170KCHF) EU MICE as TPW of Design Study? MICE funding status as of August 2005

at this point MICE (PhaseI) is an approved and funded project in 5 countries -- UK: 9.7M£ -- USA: 1.2 M$ approved for next three years (NSF+DOE) ( +RF source + MRI proposal -- success: 750k$) + propose to build solenoid magnet within MC budget (+ longer term plan for Coupling coil) (Zisman at CB) ==>total expected 5.5 M$ in hardware -- Japan: US-Japan ~$100k/yr, UK-Japan (travel funds) (+ 500k$ requested) -- Switzerland: PSI solenoid + Uni-Geneva-NSwissF (80KCHF/yr)+ 1 PDA+1PhDS bids to be placed for coupling coil (~1MCHF) and refurbishing of CERN RF power source O(170kCHF) -- Netherlands: Mag probes (in production!) + 1 PhDS + Proposal submitted in Italy (TOF, Calorimeter) and Belgium (Cherenkov) MICE is CERN recognized experiment RE11.

zBeamUK3.6 M£ zInfrastructureUK2.1 M£ zBeam solenoidCH 2 MCHF zTOF0INFN150 K zCkovIUS(Mississipi)100 K zTOF IINFN150 K z zTracker Solenoid I US (LBL)1.25 M$ zTracker I&II z frames and detectors UK1.4 M£ z fibers, DAQ Japan 0.4 M$ z VLPC and electronics US 0.75 M$ z zFocus CoilsUK 2.2M£ zAbsorbersUS-Japan zHydrogen systemUK zCoupling CoilsUS, CH 1.6M$ zRF cavities modules US1M£ zRF power sources CERN1.2 MCHF MCHF z US 0.5 z UK1 M£ zTracker Solenoid IIUS (LBL)0.8 M$ zToF II INFN150 K zCkovIIBelgium100 K zMuCalINFN350 K zDAQ CH 300 KCHF