Not a Bore? Issues of Tidal Power in the Severn Estuary Agenda University of the West of England 30 th June 2008.

Slides:



Advertisements
Similar presentations
River Regulation / Dam Construction – Effects on Rivers and Streams.
Advertisements

Massachusetts Ocean Management Plan SeaWeb/National Press Club MA Executive Office of Energy and Environmental Affairs Ian A. Bowles, Secretary Deerin.
Severn Estuary Tidal Energy 1.Call for Proposals 2.Initial Assessment of Options 3.Next Steps 19 September 2008 – Severn Estuary Partnership, Penarth Peter.
Alternative energy Tidal power-stations. What is a Tide ? Tides are the rising and falling of Earth's ocean surface caused by the tidal forces of the.
“International context and response to draft D5b – a conservation agencies view” PROTECT Workshop, Aix en Provence. 14 May 2008.
Title Monitoring the Biological Effects of Contamination in the Severn Estuary David J Bird University of the West of England, Bristol.
North Hoyle Offshore Wind Farm 17th April 2002 BONUS Energy A/S.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
The Challenge of Managing Marine Resources Industry's role in managing marine resources Peter Barham. Environmental Consultant.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
SYSTEMS AND ENGINEERING TECHNOLOGY Tidal Energy. © Frazer-Nash Consultancy Ltd All rights reserved. Confidential and proprietary document. SYSTEMS.
1 Tidal Power Low duty cycle but feasible in certain topologically favorable locations.
Lancaster University Renewable Energy Group Students: Oliver Booth Paul Edwards Gareth McMann Leila Tavendale Supervisor: Dr George A Aggidis. February.
Energy From the Severn Estuary Trinity College, Bristol, March 10 th 2007.
Barrage or What? Engineering Options Prof Colin Taylor CEng FICE Professor of Earthquake Engineering Head, Department of Civil Engineering
Tidal Energy Presented by: Courtney Winter and Quinn Foley.
Severn Tidal Energy The Cardiff/Weston Barrage – Context and Implications Peter K Jones – Environmental Policy Officer.
Patrick Kearon The Bristol Port Company
The EU Water Framework Directive and Sediments The Water Framework Directive was transposed into law in EU Member States at the end of Nearly two.
Hydropower – a regulatory perspective Jacques Sisson EA North Wales Area Account Manager HEP Area Environmental Planning Team.
Severn Tidal Power – a proposal A Barrage of Issues.
Climate change - environmental planning challenges Mark Southgate Head of Planning and Local Government.
Charting the Upsurge in Hydropower Development 2015
Severn Tidal Power Feasibility Study Background to the study Terms of reference announced in January 08 Aim of the study: To enable Government to decide.
3.3 Energy Resources Human Population, Carrying Capacity, and Resource Use.
COastal REsearch & POlicy INTegration Working Together for Coastal Planning around the Severn Estuary Dr Tim Stojanovic, Cardiff University/COREPOINT project.
LARGE DAMS AS A SOURCE OF RENEWABLE ENERGY Glen Singleton, Ph.D., P.Geo., B.C. Hydro Canada.
Power Generation 1. Tidal 2. Hydro 3. Wind 4. Solar 5. Nuclear 6. Fuel fossils 7. Geothermal.
Severn Estuary Tidal Energy Sustainable Development and Severn Tidal Power 7 March 2009 Peter Kydd Director of Strategic Consulting Parsons Brinckerhoff.
Lancaster University Renewable Energy Group Students: Christopher Betteridge, Lawrence Chamboko, Wang Xiaofei Supervisor: Dr George A Aggidis 3/2/2011.
Severn Tidal Power Feasibility Study Severn Estuary Forum 2009 Juliet Austin – Environmental workstream lead, STP study, Department of Energy & Climate.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Prof. R. Shanthini Jan 26, Hydroelectric - Hydroelectric - Solar - Wind - Geothermal - Marine (Wave and Tidal) - Biofuels (Biomass, Bioethanol and.
Bianca Rockenback Hour 8. How Tidal Energy Works Tidal energy is energy obtained from changing sea levels. This renewable energy source has great potential.
Biological Impacts of a Severn Barrage Les Batty.
Norwich Business School Tidal Energy 1 NBSLM03E (2010) Low Carbon Technologies and Solutions: Section 17 N.K. Tovey ( 杜伟贤 ) M.A, PhD, CEng, MICE, CEnv.
Hannah Burke & Steven Payne. The Severn Estuary The Severn estuary has a lot of potential for harnessing a large quantity of energy, it is one of the.
Ryan, Saad, Sufie Energy Resources Assignment SPH 3U
Tidal Power Projections Tom Beagan 24 th February 2005.
Severn Estuary Forum Flood Risk and the Severn Barrage 19 th September 2009 Nick Lyness Wessex Flood &Coast Erosion Risk Manager.
© Michel Roggo / WWF-Canon Danube Region Strategy Conference, 04 March 2011, Budapest Danube Region Strategy – nature conservation aspects Gábor Figeczky,
The Severn Barrage Presentation to Severn Estuary Forum 8th June 2006
European Commission, DG Environment, Nature Unit
Rookery South Resource Recovery Facility (RRF) Evolving List of Documents being prepared for submission to the Infrastructure Planning Commission Administration.
Ethical and democratic issues that impact on rural communities Or
FRANCES CARR 24th February 2005
1 Port Development and the Reuse of Dredged Material in the Stour and Orwell Estuaries Dr Andrew Birchenough Dr Chris Vivian The Centre for Environment,
Establishing the Scientific Basis for Ecosystem Management On the Upper Mississippi River Dr. Ken Lubinski, USGS Upper Midwest Environmental Sciences Center.
STRATEGIES FOR FRESHWATER. CONTEXT FOR STRATEGIES.
Hydrokinetic Power in Navigable Waterways William H. McAnally Northern Gulf Institute Sandra L. Ortega-Achury and James L. Martin Civil and Environmental.
Investing in our common future Co-financed with the support of the European Union ERDF – Atlantic Area Programme Comparison of Hydro-environmental Impacts.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
Marine Planning since 2011 Linda Rosborough – Director of Marine Scotland.
New developments and their interaction in the marine and coastal zones – the developers perspective. Key problems and solutions. Tidal Lagoon Power.
Tidal Power (energy from the sea) By: Morgan Ross.
RUPES Workshop, Cagayan de Oro , September 2012
Savannah River Projects
Severn Estuary / Barrage
Energy and the Environment
Severn Tidal Power Feasibility Study
Not a Bore? Issues of Tidal Power in the Severn Estuary
SEVERN TIDAL ENERGY SCHEMES IMPLICATIONS FOR WILDLIFE
Sioned Evans Jim Poole Keith Williams
Draft revised terms of reference Working Group on estuaries and coastal zones conservation issues.
Tidal Energy Potential & Future Contribution to UK Energy Mix
Severn Tidal Power Sustainable Development and Severn Tidal Power
Hydropower and the WFD: constraint or opportunity?
Working Group on estuaries and coastal zones
When and how to best consider the provision of the Habitats directive
MINI -HYDROPOWER Climate friendly but not devoid of environmental and social risk.
Presentation transcript:

Not a Bore? Issues of Tidal Power in the Severn Estuary Agenda University of the West of England 30 th June 2008

AGENDA pm Introduction and Welcome Jim Longhurst and Eric Albone pm Presentations Mervyn Bramley, Tom Appleby, Chris Spencer and David Bird pm Discussion at Tables. One key issue for the Feasibility Study pm Report Back on one key issue for the Feasibility Study 7.30pmClose

Severn Tidal Power ‘Not a Bore?’ Engineering factors and technologies Dr Mervyn Bramley Visiting research fellow

Technologies – Tidal range and tidal stream Low head housed turbines as used in tidal range barrages and lagoons – e.g. La Rance – are production technology Tidal stream technology is now at prototype development stage

Potential tidal energy capture From tidal range: Power ≈ k 1 A H 2 H = level difference across barrage / lagoon A = wetted surface area upstream of empoundment From tidal stream: Power ≈ k 2 V 3 V = mean free-stream tidal current

Tidal stream array Prototype stage moving to full-scale demonstration Small commercial array up to 5 MW Large array up to 30MW Potential interference with shipping lanes

Tidal lagoon – Swansea Impoundment by 9 km length embankment Plan area of 5km 2 Mean spring tidal range ≈ 8.5 m Installed capacity 50MW Annual energy output 124 GWh Cardiff Weston barrage ≈ 135 tidal lagoons Estimated cost ≈ £250m

Tidal barrage options – different sites Cardiff – Weston Barrage Location: Lavernock Point to Brean Down Length: 16 km (10 miles) Generating capacity: 8.6 GW or 8,600 MW Annual average output: 17 TWh or 17,000 GWh Percentage of UK electricity supply: 4.4% Estimated cost ≈ £15bn

Cardiff – Weston barrage A mega engineering project Concrete caissons towed to prepared foundations for sluiceways and turbines Some embankment Shipping lock Connection to national grid Rail or road possibly, but adds considerably to width 200,000 person years of employment – Site works

Issues for consideration Are the technologies sufficiently proven and appropriate to be applied at a significant scale in the Severn Estuary? Can the environmental impact of a Severn tidal scheme both during and after construction be adequately mitigated? Can the other uses of the Severn Estuary, in particular ports, commerce and shipping, be accommodated? Could the UK finance and handle a project of the size of the larger Severn barrage proposals? Can the carbon embedded in a Severn tidal scheme be adequately offset by the low-carbon power it generates ? Can we envision a multi-functional scheme and a managed changing environment, or is this our philosopher’s stone?

‘Not a Bore?’ A Barrage of Legislation Law Lecturer

How does the law view the estuary? Law views it as land covered by water Needs consent of the owners of the seabed Otherwise compulsory purchase requirements

Rights in the estuary Public right to navigate Public right to fish Private fishing rights Private drainage rights

The effect of human rights Compensation for interference with those rights Difficult to assess at this stage

Environmental legislation Habitats Directive Severn candidate ‘Special Area of Conservation’ Requirement to form compensatory habitat for protected features lost to power scheme

Not that difficult? Capital engineering costs plus –Compensation costs for people’s rights –Compensation for the environment

Severn Barrage ‘Not a Bore?’ Sediment Distribution and Flood Risk Sue Marriott and Chris Spencer

Current issues Sediment  What types of sediments exist in the estuary and how are they distributed?  Where does the sediment come from?  Is the sediment contaminated? Flood risk

Sediment McLaren et al. 1993

Sediments How will the barrage impact on sediments?  Circulation by tidal currents restricted to Bristol Channel below barrage  Fine sediment can settle in lagoon behind barrage making water clearer, allowing ultraviolet penetration therefore cleaner water plus photosynthesis and phytoplankton blooms  Contaminated sediment from floodplains may build up  Build up of sediment may reduce volume of upper estuary

Flooding  Flooding What contributes to flood risk in the area?  What will the effects of the barrage be?  Lagoon will raise water tables so river water may not drain away so quickly  May cause extra deposition of mud in lower reaches of rivers due to lower gradients reducing capacity  Increased flood risk in lower reaches and backing upstream

Increased flood risk upstream?

Future Sea-Level Rise Sea-level rise will have impacts on coastal areas due to increased erosion and increased flood risk Would also cause backing up of river water in lower reaches Barrage may be opened during high river flows to move water out quicker Erosion energy will be reduced behind barrage Could a barrage help mitigate against future sea-level rise?

Issues for consideration Would a barrage result in changes to sediment distribution? Will changes have impacts in the Bristol Channel? What are the implications of raised water tables in the surrounding areas? What is the likelihood of an increase in contamination of estuarine sediment? What are the likely impacts on sediment and flood risk of other tidal power generation options? Costs of extra coastal and flood defences needed due to future sea-level rise vs cost of barrage?

Severn Barrage ‘Not a Bore?’ The Estuarine Ecosystem Environmental Biologist

Estuaries are one of the world’s most productive natural ecosystems

Estuaries support huge numbers of invertebrates – but few species Lugworm (Arenicola marina) Ragworm (Hediste diversicolor) Baltic tellin (Macoma balthica) Edible cockle (Cerastoderma edule)

Estuaries support huge numbers of invertebrates – but few species Mud snails (Hydrobia ulvae) – density may exceed 35,000 m -2 Brown shrimp (Crangon crangon) estimated population ~10000 million shrimps

 100+ fish species have been recorded from the Severn Estuary & Bristol Channel  just 10 species contribute to 90% of all fish 1. Sand goby 2. Bass 3. Whiting

 Important nursery for many marine species  Used as a migratory corridor by some species Sprat Herring European eel River lamprey

Invertebrates & fish support an average wading bird population of 88,500 individuals Golden plover (Pluvialis apricaria) 4,000 Ringed plover (Charadrius hiaticula) 3,800 Dunlin (Calidris alpina) 44,445 Knot (Calidris canutus) 6,600

Issues for consideration:  How do we balance the need for energy against the potential for environmental damage?  The ecosystem will not be destroyed – but it will be changed – for better or worse?  How do we put a value on species & biodiversity – are salmon more important than lampreys?

Questions for the BERR Feasibility Study to Address The following slides provide a list of questions for the BERR Feasibility Study to address as formulated by the participants at the Not a Bore Science Café Event. Some 85 people drawn from the Bristol hinterland attended the Science Café event held at the University of the West of England on 30 th June Following a series of short scene setting presentations participants discussed the implications of tidal power from the Severn estuary. Arising from these discussions are a list of questions that the BERR Feasibility Study should address.

Questions for the BERR Feasibility Study to Address Will the evaluation make comparison with the potential impact and input of other low carbon energies such as wind and solar? Will the SEA evaluate the human costs in the areas following changes arising from an energy capture system in the Severn? Given that environmental impact is a necessary consequence of whatever system is put in place, rather than compromise why not go for the project that produces the most power and maximises the low carbon energy potential? Will the SEA evaluate such a scenario? Why is tidal power from the Severn back on the political agenda? Will the SEA and Feasibility Study consider implications for Human Rights? How will the proposed schemes affect local communities? How will a tidal power scheme benefit the South West? Will the preferred scheme be evaluated against other forms of renewable energy? Is consideration being given to smaller community based energy schemes? How will the Feasibility Study ensure that the selected tidal power scheme will not be a white elephant?

Questions for the BERR Feasibility Study to Address How confident can we be that the Feasibility Study methodology is not biased in favour of any particular type of technology or size of scheme and that it takes account of the cost effectiveness of non-tidal power alternatives to put the study’s conclusions in context? What are the likely health impacts of a barrage particularly in construction and also through increased risk of flooding. How are the cultural aspects/damage/change to be costed? The Severn bore is a unique natural phenomenon – how can a monetary values be put on it? If a barrage is the preferred option how will sufficient aggregate be sourced to build the structure? Will the Feasibility Study identify the responsible parties to undertake environmental compensation? What will be the impact of any scheme on flood risks? Will the flood scenarios considered actually be worst case? How will the commercial effect on the Bristol's Docks be taken into account?

Questions for the BERR Feasibility Study to Address How is the lack of scientific and engineering knowledge being addressed? Will ownership of a scheme be considered in the feasibility study? How certain are the cost estimates? Are allowances made for the legal compensation that will be required? How seriously are the alternatives to a barrage being considered? How much energy conservation could the likely cost of a Weston – Lavernock Barrage buy? What is the payback period for the carbon footprint? What will be the impacts on the ecology and how certain can we be that the ecological compensation schemes will be able to replace the lost biodiversity? How confident are we that a tidal power scheme will be future proof? Will a scheme be as efficient in 10 years time as the day it is commissioned? What effect will the discontinuous operation of a tidal power scheme have on the supply of electricity and on the maintenance of the site?