Presentation is loading. Please wait.

Presentation is loading. Please wait.

Sioned Evans Jim Poole Keith Williams

Similar presentations


Presentation on theme: "Sioned Evans Jim Poole Keith Williams"— Presentation transcript:

1 Sioned Evans Jim Poole Keith Williams
The North Wales offshore tidal impoundment scheme: a preliminary study of requirements, constraints & opportunities Sioned Evans Jim Poole Keith Williams

2 Aim To help scope a formal assessment

3 Contents Concept Generating capacity Size, shape & siting
Mechanical & electrical Construction, materials & costs Sustainability Comparison with wind farms Conclusions

4 Notional location of the proposed impoundment

5 Concept T

6 Size considered Rectangle: 12 km x 5 km

7 Maximum generation over 2 tidal cycles
PE = 2  g A T2 Maximum power = 343 MW

8 Practical Operation

9 Practical Operation Volume exchanged = 0.5 V Mean head = 0.35 T
Power = 120 MW

10 Overall Efficiency If turbine-generator sets are 90% efficient:
Power = 108 MW Overall efficiency = 31.5%

11

12

13

14 Size, Shape & Siting Economy of scale Distance from shore
Effect on tidal flows Coastal protection

15 Three Options “Minimum environmental impact”
“Maximum power generation” “Climate change”

16 Mechanical & Electrical
24 bulb turbines Installed capacity 340 MW Siting? Cable to shore

17 Construction Traditional embankment dam
Embankment dam, but with geo-membrane bags Concrete caissons

18 Typical cross section of embankment dam
40° 10m 14m Rock Armour Corefill Area = 374m2 Geomembrane layer Typical cross section of embankment dam 5m 1.5m Mean sea level – Permanently Submerged Use of geo-membrane bags in dam construction

19 Sources of Material Sand & gravel: North of Liverpool Bay
Adjacent sea bed Slate waste? Gwynedd

20 Costs (1) Index method Cost 1 = Size 1 Cost 2 Size 2 n
Cost estimate (based on Swansea scheme and n = 0.7) = £224 million

21 Costs: First Principles (£m)
Category Min Max Civil works 211 412 Turbine generators 48 80 Labour 6 11 Others 20 40 Total 285 543

22 Payback Assume: Mean generation = 110 MW Sale price = 3p/kWh
Operating cost = £3m/y Net income = £25.9m/y Payback = 11 – 21 years

23 Sustainability Local & strategic impacts
Simultaneous social, economic & environmental progress

24

25 Environmental: local Food & Environmental Protection Act 1985 Part II
Environmental Impact Assessment Positive & negative impacts

26

27 Environmental: strategic
Save 1 million tonnes CO2 emissions annually (coal-fired) Contribute 1 TWhr/annum towards Welsh Assembly Government’s target of 4 TWhr/annum from renewables by 2010

28

29

30

31

32

33

34

35

36

37 Compare with wind farm Turbines & turbine separation as for North Hoyle Installed capacity 480 MW Load factor 35% Mean power output 168 MW

38 Conclusions Power output Size, shape & siting Construction method
Payback Sustainability Comparison with wind farm Modelling

39


Download ppt "Sioned Evans Jim Poole Keith Williams"