Short Summary from second Meeting of the Ecodesign CF Subgroup on Large Power Transformers Brussels 28-09-2012 Distribution Transformers (medium PT) Power.

Slides:



Advertisements
Similar presentations
“Power Factor” In Transmission System
Advertisements

The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
Introductory Circuit Analysis Robert L. Boylestad
Sistan & Balouchestan Electric Power Distribution Company
High Frequency Saturable Reactor
11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
WCM Summer School 2014 Group 8 Distribution Transformers: Aligning sustainable goals, financial benefits & quality.
Electrical Engineering Department, Amirkabir University of Technology, Tehran, Iran M. Poursistani N. Hajilu G. B. Gharehpetian M. Shafiei CHP Systems.
REDUNDANT ARRAY OF INEXPENSIVE DISCS RAID. What is RAID ? RAID is an acronym for Redundant Array of Independent Drives (or Disks), also known as Redundant.
Sleek Stabilizer for A/C Units By Executive Engineer (Electrical) BSNL, Electrical Division,Tirunelveli.
Practical use of newly developed BAT conclusions Valts Vilnītis.
Dry type transformers Zaragoza Traction application
Announcements Be reading Chapter 3
POWER SUPPILES LECTURE 20.
PRODUCTS TRANSFORMERS ENERGY SAVING TRANSFORMERS (EST) TRANSFORMER RECTIFIER UNITS 3 rd HARMONIC REJECTION TRANSFORMERS (HRT) ULTRA HIGH ISOLATION TRANSFORMERS.
Energy Saving Opportunities for Transformers Hans De Keulenaer Outokumpu Tara Mines Energy Efficient Motors & Transformers Workshop May 7, 2002.
KING FAHAD UNIVERSITY OF PETROLUEM & MINERALS DEPARTMENT OF ELECICAL ENGINEERING EE-306 PROJECT REACTIVE POWR PREPARE BY Yasre Ahmed Saleh ID#
Chapter 3Transmission Lines Why use high-voltage transmission lines? The best answer to that question is that high-voltage transmission lines transport.
Economic Impact of Poor Power Quality on Industry Nepal Adopted from The Internet for Educational Purpose Sudaryatno Sudirham October 2003.
Drawing up Project Resource Statements and Project Financial Statements.
Copper Development Association K Rating of Transformers supplying Harmonic Rich Loads
Method of Stating Energy Consumption Life-cycle analysis for EV energy consumption results.
Transmission Lines …….. Conductor Material
Ivo Pinkiewicz, IENOT, POLAND DISTRIBUTION TRANSFORMER POPULATION and EFFICIENCY LEVELS IN POLAND.
Chapter 22 Alternating-Current Circuits and Machines.
Chapter 2 Transformers.
A Regulatory Framework for Energy Intensive Industries within the EU Berlin 30 November 2012 Chris Lenon – Green Tax Group BE.
Status report and Discussion paper for Number of tests WLTP IWG at Geneva in June JAPAN WLTP-11-20e.
Partner for progress Safety and quality requirements for mCHP products Falco Thuis Kiwa Gastec Certification May 2008.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Transformer Population & Efficiency Levels in the Italian Market Francesco Colla ANIE Federazione Nazionale Imprese Elettrotecniche ed Elettroniche.
A Quick Guide Total Cost of Ownership calculator tool (ver. 1.1)
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Ivo Pinkiewicz, IENOT, POLAND CENTRAL EUROPE MARKET SURVEY PART 1 - POLAND.
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
Value at Risk Chapter 16. The Question Being Asked in VaR “What loss level is such that we are X % confident it will not be exceeded in N business days?”
Modeling of Power Transformers A Static Device. Transformers The transformer enables us to utilize different voltage levels across the system for the.
DESIGN OF ELECTRONIC SYSTEMS
Comments on Guidelines on Transmission Tariffs General ETSO welcomes the new draft as positive step –There are many important improvements to the previous.
January 20, 2006Rod Janssen EC Green Paper on Energy Efficiency Rod Janssen Energy Consultant.
Instructor :Kashif Mehmood
Integrated Distribution & Production Planning (DP/PP) EIN 5346 Logistics Engineering Fall, 2015 Integrated Distribution & Production Planning (DP/PP) EIN.
Current transformers (CTs)
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
Energy Community Secretariat 1 25 th Customer Working Group Meeting ECS, Vienna 10 October 2013 CIRED C ONFERENCE 2013 R OUND T ABLE R EPORT Jasmina Trhulj.
Transformer A transformer is a static piece of equipment used either for raising or lowering the voltage of an a.c. supply with a corresponding decrease.
LOAD FORECASTING. - ELECTRICAL LOAD FORECASTING IS THE ESTIMATION FOR FUTURE LOAD BY AN INDUSTRY OR UTILITY COMPANY - IT HAS MANY APPLICATIONS INCLUDING.
SARDAR VALLABHBHAI PATEL INSTITUTE OF TECHNOLOGY PREPARED BY: 1)BALDIWALA ALIABBAS ( ) 2)PARTH GUPTA ( ) 3)ANIL KHATIK ( )
Contract management 1. Acquiring software from external supplier This could be: a bespoke system - created specially for the customer off-the-shelf -
Parul Institute Of Technology Name Of Subject:-Electrical Machines Name Of Faculty:-(1) Suresh Sahoo (2) Yogendra Tiwari E&C 3 rd Sem. Prepaid By :- Sr.No.NameEnrolment.
DC Machine & Transformer
Examples of capital expenditure models. Overview 2 Capex models developed and used by a number of regulators internationally Most commonly used as part.
Transformers. Single Phase Transformers Principles of Operation – Single Phase.
HNC/D Engineering Science
World Energy and Environmental Outlook to 2030
Power Factor Correction The Definitive power solution
TRANSFORMERS.
James L. Plummer, President, Climate Economics Foundation
In LOT 1 & LOT 2 of Ecodesign Directive
ECE 476 POWER SYSTEM ANALYSIS
12 good reasons to buy an ABB TrafoStar™ transformer
EU’s CO2 Emissions Trading Scheme – Benchmarks for Free Allocation from 2013 Onwards 9 September 2010 Hans Bergman DG Climate Action European Commission.
DOE Distribution Transformer Efficiency Regulation Evaluation of Impact on the Industry Carlos Gaytan Manager of Engineering Distribution Transformers.
GOVERNMENT ENNGINEERING COLLEGE , BHUJ
POWER AMPLIFIERS.
Electromechanical Systems
Amplifiers Classes Electronics-II
Ecodesign and Energy Labelling In Europe
Amplifiers Classes Electronics-II
INNOVATION, MARKETS AND INDUSTRIAL CHANGE
Presentation transcript:

Short Summary from second Meeting of the Ecodesign CF Subgroup on Large Power Transformers Brussels Distribution Transformers (medium PT) Power Transformers (Large PT) REMARK: European Commission can only regulate the manufacturer and not the customer-side of the transformer sale

Dustribution Transformers (medium PT) The minimum energy performance requirements for MPT consist of maximum allowed load and no-load losses

Dustribution Transformers (medium PT) DRAFT of EN xxxx- to become a HARMONIZED standard for ‘three-phase medium voltage transformers, with highest voltage of equipment not exceeding 36kV’

Possible obstacles Production capacity of raw material (silicon and amorphous steel) Possible monopoly of raw material production Increased cost and prices Increased dimensions of products (it is often limited) Increased level of noise – environmental aspect! (residental and closed areas) Amorphous Metal Recycling System Different view on future energy price level between Norway and EU (SINTEF) Different interest rates within EU countries Political issue?

Power Transformers (Large PT) The minimum energy peak efficiency level Energy Efficiency calculation Conventional formula Proposed formula Efficiency The efficiency is the ratio of usable energy on the output of a transformers over the supplied energy on the input of the transformers The efficiency is maximal when no load losses equals load losses

Losses due to load No load lossesPermanently on cooling losses Supplied power Usable energy For the purpose of EC regulation the formula has to : –Be simple and easy to apply –Be independent of rated power and definition of multi stage cooling –Be fair and non favoring any cooling type –Take into account all losses And therefore the retained equation is : –Based on apparent power in VA (cos φ =1) –The maximum efficiency one –With the losses corrected at 20 °C + Average winding rise i.e. 90 °C for OD cooled transformer 85 °C for ON or OF cooled transformer. –With the permanent cooling losses

Why use energy peak efficiency? No expectation of load factor, so should be appropriate for a wide range of transformers Compatible with procurement using loss capitalisation Very difficult to make a transformer with poor core steel to meet minimum peak efficiency requirement And avoid problems when using maximum loss tables Flexibility is needed to accommodate different modes of operation Transport problems will be even bigger  Full load all the time  Part loading (network etc.)  Different levels of redundancy  Different ways of specifying rating (Continuous rated or Emergency rated)

And therefore the proposed equation is: Which correspond to load factor of:

Efficiency variation across load variation Efficiency dependence on load factor is small for usual LL/NLL ration For a ratio of 5 and 7.5 k ηmax occurs at 0.4 Example given on the base of a 170 MVA

1.To collect data about the existing population manufactured in the last 10 years 2.To calculate EE expressed as shown 3.To define the EE trend (for each class) 4.To define the minimum EE limit (according to the trend for each class) Where to set minimum energy peak efficiency? Process flow with example:

T&D presented materials (Thomas Fogelberg and Giuliano Monizza, both from ABB). represents requirements from customers around Europe which were part of tenders and purchasing documents. All data came from 8 LPTs manufacturers and from recent past huge difference between capitalisation factors values Keep in mind that future Ecodesign Directive will be applied to all countries within EU no matter at which level is their capitalisation (price of energy, interest rate, years in service…) does it look harmonized?

Questions and issues: what to do with long term MPT & LPT purchasing contracts with levels of losses above or peak efficiency bellow than it will be proscribed within Ecodesign Directive? How to quantify savings and what we are gaining if we install new LPT with higher efficiency instead existing one? Money, Energy, CO2? Calculate in every specific case and then translate to CO2 emission 0,4kg/kWh? And again: Are energy prices and interest rates political issues? VITO representative said that he agrees that project report does not cover all possible options and consequences (transport problems, ability to replace DT and LPT and other constrains) but he repeated that project and study are based on 7 base cases and it was necessary to have same assumptions as well as to neglect something. Otherwise it was not possible to do it and it will be extremely complicated Everybody will have only benefit except utilities, regions or countries which did not already implemented high capitalization of losses during purchase process (see T&D table). Conclusion about LPT