Tests of the LH2 target at GSI 2 nd -4 th april 2014 T. Hennino, C. Commeaux (IPN Orsay) T. Heinz, E. Schwab (GSI) The LH2 target.

Slides:



Advertisements
Similar presentations
Antiproton Lens Replacement Keith Gollwitzer Antiproton Source Department for the Experts and Mechanical Support Department Target Station Group.
Advertisements

Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Status of 1.3-GHz Cavity Vacuum Furnace at IB-4 SRF Dev. Group Meeting 27 Sept 2010.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
Operation TCR 2 nd of July to 10 th of September 2001 More than 20 major events Events grouped by equipment group and zone affected.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference April 22, 2010.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
JHCBC AUTO A/C PERFORMANCE TESTING CHAPTER 3 Page
Antiproton Lens Replacement (Unfortunately Part 2) Keith Gollwitzer Antiproton Source Department for the Experts and Mechanical Support Department Target.
Left side compressor behind Left control box Right side compressor behind Right control box.
The human circulatory system This system is one of the most important in the body. It is made up of 3 main parts: The heart The Lungs The blood vessels.
MICE Preparations for CM18 Michael S. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Video Conference April 12,
NCSX Project Meeting Vacuum System Update March 21, 2003 Bill Blanchard & Tom Provost.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
UPDATE at SBU (Feb 24, 2009) 1 st Water Target SuperP0Dule (DaveF, Kevin, Scott) last week spent setting up hoses, pipes, water tank. Problem with unfiltered.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
Some notes about liquid Hydrogen target 1.How it operates 2.Modification Target length, empty mode 4.Status.
HERA Operation 2004 M. Bieler, -MPY- PRC, Mai Performance Improvements in Remaining Problems - Improvement Program - Schedule 2004.
Reser- Voir Turbo Pump 1 Five- Fold Turbo Pump 2 Scroll Pump1 Scroll Pump2 Tgt. Cham- ber N2N2 H2H2 P2 P1 P3 P4 P5 P6 Panel Tgt. Cell V2V1 V3 V0 E0 E1.
AGS/Booster Status March 11, 2014 Time Meeting Haixin Huang.
Weekly Checks Monday – VSP Room Tuesday – Pilothouse System Controls Wednesday – Starboard / Engine Room Thursday – Foam Room Friday – Port / Engine Room.
Monday – VSP Room weekly checks Visually Check: Hvac system for leaks & valve settings Fresh water system for leaks & valve settings VSP linkage Autopilot.
NA YETS: schedule week by week S. Evrard.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Booster Pump/ Compressor Procedures Rescue 31 Operator Instructions.
Booster Bias Supply and Cavity Upgrade November 16 th, 2011.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
11/26/2008 Utility Water Hydro-Pneumatic Tank System & Recovery.
NCSX Water Systems Larry Dudek March 21, Plan for FY03 Review questionable legacy equipment and verify viability for NCSX New Scope: NB support.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
Beamline Update Adam Dobbs, MICE CM38 Feb Contents Recent and Upcoming Activities Target Conventional magnets Decay Solenoid Proton Absorber Summary.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire DCP Meeting 20/06/12 Schedule for the technical of June.
1 MICE Hydrogen system Working group mtg – 01/09/14.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
New single-chip “box” to test laser soldering in vacuum WP6 meeting, 16/01/14.
BGV 23-feb-2016CERNMassimiliano Ferro-Luzzi 1 BGV cooling : status and plans reporting on behalf of EN-CV (Sylvain Nichilo & Olivier Crespo-Lopez)
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
Teleconf ACS – FREIA 28th March 2017
Friday – port side engine room weekly checks
14 Refrigerant Recovery, Recycling, and Recharging.
Rotation Target R and D of ILC E-driven source
Teleconference ACS – FREIA 18th April 2017
Update on HW commissioning
Preparation of the activities for the LHC Long Shutdown 2
Teleconference ACS – FREIA 31st October 2017
Run period of summer 2012 Zoltán Fodor
IBBelle: Status Commissioning at MPP Transport to KEK
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Mathew C. Wright January 26, 2009
Lithium lens and window tests
Cryogenic System Commissioning Summary Report
ISRC and LEBT Vacuum System Design
Characterization Update
Presentation transcript:

Tests of the LH2 target at GSI 2 nd -4 th april 2014 T. Hennino, C. Commeaux (IPN Orsay) T. Heinz, E. Schwab (GSI) The LH2 target

Aim of the test Restart the target in the GSI environment Preparation actions – Target transported from Orsay by T. Heinz in march – Reinstalled on the HADES beam line with all connections (T.Heinz + E. Schwab)

Problems encountered Low 4 He pressure in the compressor (200 psi instead of )  compressor refill (bring specific pipe/connector to GSI) Water leak on the compressor cooling circuit  repair (GSI) Missing control box of pressure sensor PG02  exchange with PG01 (directly powered) Box found in cabinet (to be repaired (T. Heinz) or replaced) The compressor at GSI

Logbook of actions and results 2/4/ :45 start vacuum pumps 2/4/ :15 conditionning (purge) 2/4/ :30 start of cooling down 2/4/ :00 20°K reached in condensor 2/4/ :55 29°K reached at the target 3/4/2014 0:30 compressor stopped for the night 3/4/2014 6:15 restart of compressor 3/4/ :00 cooling finished: target full 3/4/2014 several cycles empty/full target over more than a day  OK 4/4/ :45 Target stopped

Further actions Restart the target week 7-11 april (Torsten alone) Target removal from beam line and preparation of test run with proton Saving the computer disk (M. Traxler on Monday 7 th ) Update the note « working procedure of the HADES LH2/LD2 target » New visit at GSI in may (week 20 or 21)