Limited Streamer Tubes for the IFR Barrel Installation Review SLAC, Oct 21, 2003 Stewart Smith INFN: Ferrara, Frascati, Genova, Padova, Roma, Torino US:

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
OSU meeting, 04/24/2003 Richard Kass1 Limited Streamer Tube Project Overview Richard Kass Ohio State University Introduction (why, who, what….) The big.
IFR-LST status report G. Cibinetto INFN Ferrara Babar Collaboration Meeting, Feb. 21, 2004 Milestones LST production status 1 st module assembled Princeton.
RACKS AND CABLES Peter Kim SLAC LST Install Readiness Review May 5, 2004.
October 21, 2003H.J. Krebs1 LST Mechanical Design Review West Coast Team Mechanical Engineering and Design Manpower & Organization H. James Krebs October.
Limited Streamer Tubes for the IFR Barrel Experimental Program Advisory Committee SLAC, June Stewart Smith INFN: Ferrara, Frascati, Genova, Padova,
May 4, 2004Bill Wisniewski1 Installation Review. May 4, 2004Bill Wisniewski2 Charge ( W. Althouse, G. Bowden, W. Innes(chair), J.Weisend, (D. Nelson))
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
UPDATE ON CMS RESISTIVE PLATE CHAMBERS CMS RPC Barrel Collaboration GR1, 5 Aprile 2004.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
LST Storage and Testing at SLAC in the SLD Hall Available space Available Infrastructure Needed Infrastructure Time Line People Money Carsten Hast (SLAC)
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Page 1 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (1) Excellent job on preparing and presenting review Overall, the Committee feels that the.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
IFR barrel upgrade: status of LST option Roberto Calabrese Ferrara University 10/18/2002.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
LST Upgrade LST Upgrade Readiness Review William Sands, Princeton University,
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
November 15, 2003Bill Wisniewski1 Introduction Brief Status of LST project QA Review Mechanical, Schedule and Cost Review.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Laura Ingalls Huntley Office of Science, SULI Program Franklin & Marshall College Stanford Linear Accelerator Center Menlo Park, California 16 August 2006.
Wolfgang Menges, Queen Mary The BaBar Muon System Upgrade Wolfgang Menges Queen Mary, University of London On behalf of the BaBar LST Group.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
CLAS12 Drift Chamber Prototyping
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
1 R&D status report of LST technology (2) Changguo Lu Princeton University BaBar IFR Workshop SLAC, December 8, 2002.
LSTs in the IFR gaps Workshop on IFR replacement SLAC November 14, 2002 L. Piemontese INFN Ferrara.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Presentazione delle richieste immediate per l’upgrade di MEG (gruppo di Roma) Cecilia Voena Mar 15 th, 2013.
Performance and Aging Studies of BaBar RPC’s Henry R. Band University of Wisconsin for the BaBar IFR-RPC group RPC 2005 VIII Workshop.
IFR Status Report W. Baldini, on behalf of the Ferrara SuperB-Group XIV SuperB General Meeting, Frascati Sept.27 – Oct
US Belle II Project – Technical Elements David Asner Pacific Northwest National Laboratory.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.
Roberto Calabrese Ferrara University and INFN
DC56 R&D Goals, Schedule and Status
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
Production ad Quality control of RPCs for the CMS muon barrel system
BaBar LST Upgrade Mark Convery SLAC 13 Jun 07.
IFR Status Summary W. Baldini on behalf of the IFR Group
Summary of Fuse Testing for Barrel Module Fuse Boxes
BaBar Experience with RPCs: A snapshot of our present knowledge
CMS RPC Endcap RE1 Status Report
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Component Tracking Use computer based tracking system
Limited Streamer Tubes
RPC and LST at High Luminosity
STAR TOF MRPC Mass Production & Q.C. (USTC)
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Limited Streamer Tube Project Summary
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Presentation transcript:

Limited Streamer Tubes for the IFR Barrel Installation Review SLAC, Oct 21, 2003 Stewart Smith INFN: Ferrara, Frascati, Genova, Padova, Roma, Torino US: Ohio State, Oregon Princeton, SLAC, UCSD

October 21, 2003Installation Review2 The LST Team M. Andreotti, D. Bettoni, R. Calabrese†, V. Carassiti, G. Cibinetto, A. Cotta Ramusino, E. Luppi, M. Negrini, L. Piemontese Ferrara University and INFN R. Baldini, A. Calcaterra, U. Denni, P. Patteri, A Zallo Laboratori Nazionali di Frascati dell’INFN R. Capra, M. Lo Vetere, S. Minatoli, S. Passaggio, C. Patrignani, E. Robutti Genova University and INFN Livermore National Laboratory C. Simani, D. Lange T. Allmendinger, K.K. Gan, K.Honscheid, H. Kagan, R. Kass, J.Morris, C. Rush, S.Smith, Q. Wong, M.Zoeller Ohio State University R. Frey, M. Lu, N. Sinev, D. Strom, J. Strube University of Oregon C. Fanin, M. Morandin, M. Posocco, M. Rotondo, R. Stroili, C. Voci Padova University and INFN J. Biesiada, G. Cavoto*, N. Danielson, R. Fernholz, Y. Lau, C. Lu, J. Olsen, W. Sands, A.J.S. Smith†, A. Telnov Princeton University S. Morganti, G Piredda, C. Voena Roma “La Sapienza”University and INFN D.B. MacFarlane, H.P. Paar University of California at San Diego R. Boyce, R. Convery, C. Hast, P. Kim, J. Krebs, R. Messner, M. Olson, R. Schindler, Z. Szalata, T. Weber, W. Wisniewski, C. Young Stanford Linear Accelerator Center Engineers † Contact persons * Also INFN Rome

October 21, 2003Installation Review3 Proposed Absorber Improvement Want to add as much absorber as possible, but we are highly constrained by earthquake considerations. Proposed configuration places more emphasis on muon ID, while still preserving most of the K L efficiency.  replace 6 active layers (5, 7, 9, 11, 13, 15) with 2.2 cm brass plates, compensating for the loss of layer 19 and bringing the total absorber thickness to about 5.3 int. This will be adequate for essentially all measurements.

October 21, 2003Installation Review4 IFR Barrel Performance: Pion fake rate vs  (  ) Simple muon selector -- uses only int info. (neural net algorithms improve rejection by factor ~2) Design June 2002 LSTs Only LSTs + Brass Muon Efficiency (Monte Carlo) p  > 2 Gev/C

October 21, 2003Installation Review5 LST design Single-layer large cell (15x17 mm) Readout of x and y coordinates from outside strips Graphite- Coated PVC

October 21, 2003Installation Review6 Module Assembly Plan Ohio State and Princeton preparing facilities for module assembly. Both universities fabricating parts for assembly fixtures. Shipping and testing boxes are being designed. Planning for testing and quality control is in progress. Installation procedures coordinated by SLAC and Princeton engineers.

October 21, 2003Installation Review7 Efficiency with cosmic ray trigger Efficiency limited to < 100% By geometry > 400 volt plateau Ternary [ZEUS] Gas, 8% Isobutane Full-scale prototype (Identical to “Test Tube” in BaBar)

October 21, 2003Installation Review8 Quality Control Absolutely crucial to get this right! Q/C procedures at Pol.Hi.Tech. (PHT)  Test equipment supplied by INFN has been accepted by PHT.  Tube acceptance criteria agreed upon – Stated in PO.  Procedures and equipment in place by end of October.  Q/C and long term test procedures at US sites has been designed. INFN/DoE/NSF student exchange program!  Two Princeton students will be at PHT from Oct 15 to Dec 15.  They will then travel west with the LST’s.

October 21, 2003Installation Review9 Milestones Dec 15 ’03 -- BaBar chooses LST for IFR Upgrade June EPAC Review Approves LST Proposal June Cost/Schedule/WBS prepared June INFN Gruppo Uno Evaluation June BaBar IFC Approves Project June Large/Small Cell Decision July Electronics Design Review Aug 1 -- Place Orders for Tubes Aug Review of Q/C plans August Install Test Module into BaBar Oct 1 -- Place all orders for “small parts” Oct 31 Place orders for components: electronics, crates, HV system, signal cables, HV cables Place orders for crates Nov 3 -- Production begins! Begin fabrication of shipping boxes Dec First shipment (~5%) of tubes to Princeton/OSU -- First Phi strips arrive in Princeton/OSU

October 21, 2003Installation Review10 Milestones (cont’d) Jan 10 ’04 Q/C systems operational at OSU, Princeton Feb 1 HV system shipped to Princeton March 1 Crates complete March 1 Electronics tests begin March 15 5% of modules shipped to SLAC March 15 Q/C system operational at SLAC Feb 15 1/3 of tubes, phi strips shipped to Princeton/OSU April 1 Electronics complete April 1 Production, Q/C complete at PHT April 1 Gas system assembled, under test at SLAC April 15 Electronics, crates, HV shipped to SLAC May 15 Ship Modules for 2 sextants to SLAC June 1 Q/C begins at SL:AC July 20 Modules for last 4 sextants assembled at OSU, Princeton July 31 LST system construction complete Aug 1 Installation of 2 sextants begins ~Oct 1 Installation of 2 sextants complete July 2005 Install remaining 4 sextants (ready earlier)

October 21, 2003Installation Review11 Milestones

October 21, 2003Installation Review12 Milestones (cont’d) Backup Slides

October 21, 2003Installation Review13 General Infrastructure for Q/C QC data and other relevant information collected by hand or, whenever possible, automatically with several DAQ stations. Common systems at PHT, Princeton, OSU, and SLAC. Labview will be used to write the DAQ software and design the interface. The DAQ stations will be operated by physicists on shift and/or PHT personnel. All DAQ stations will be on a wireless LAN. The DAQ station output will be simple text files. Local production database will be available on site. Data files will be transferred every day to an outside server to be imported in the official offsite LST database.

October 21, 2003Installation Review14 Summary R &D and Prototyping Complete – It works!  Aging and Rates  Noise  Mechanical Stability  Tolerances, Surface quality Test Tube operating successfully in BaBar Most orders placed, rest by end of month Production Starts in 2 Weeks Group is devoting huge effort and resources on Q/C  We have implemented tests to identify all known diseases.  These tests spotted many problems with prototypes. On schedule for Aug Installation

October 21, 2003Installation Review15 Backup Slides

October 21, 2003Installation Review16 Scope of Q/C Activities at PHT Barcode labelling Inspection of profiles  Mechanical  Graphite coating  Resistivity Measurement Inspection of jackets, endcaps, circuit cards Gas tightness (leak test) Wire check Wire-cathode distance measurement HV conditioning and plateau measurement Long range tests