Cross-Border Infrastructure: A Toolkit Mass Transit: Comparison of Bangkok & Kuala Lumpur Session on Private Sector Participation Yong Hee Kong PPP Resource.

Slides:



Advertisements
Similar presentations
The Future of the CECA Rail Forum Infrastructure – the state of the market Alasdair Reisner Director of external affairs CECA.
Advertisements

Cross-Border Infrastructure: A Toolkit Does Ownership Really Matter? Focus Group Discussion Session on Private Sector Participation Yong Hee Kong PPP Resource.
CONTRACT DESIGN FOR REGULATION A. Estache World Bank Institute.
North East Transport Consultative Forum 31 st October 2011 Nestrans’ Regional Transport Strategy Review.
Asian Transportation Research Society (ATRANS) 902/1 Glas Haus Building, Soi Sukhumvit 25 Sukhumvit Road, Bangkok 10110, Thailand Tel. +66 (0) ,
Cross-Border Infrastructure: A Toolkit Session 0: Program Overview Regional Integration In Asia: An Overview Session on Planning & Policy Rita Nangia Asian.
Feedback on road budgets RPF November Contents  Background  Process  Information requested  Information obtained  Issues  Current data  Road.
Cross-Border Infrastructure: A Toolkit Competition Basics Session on Regulation & Accountability Max Bradford Castalia The views expressed here are those.
Cross-Border Infrastructure: A Toolkit Historical Perspective on Private Sector in Infrastructure Session on Private Sector Participation Yong Hee Kong.
2012 Citilabs Asia User Conference
Brief Overview of the Passenger Transport Sector in the Philippines Gilberto M. Llanto C.P. ROMULO HALL, NEDA SA MAKATI BUILDING May 7, 2013.
Express Rail Link The First Operational TETRA System for Rail in the World Dr. Aminuddin Adnan CEO Express Rail Link Sdn Bhd 18 May st Malaysian.
Current Economic Situation and Outlook in Thailand Kobsak Pootrakool 2 February 2015.
SUBWAY SYSTEM IN NEW YORK CITY The Magical Subway.
Highways: free or toll?. In the past, roads were considered a public good Now it is possible to make people pay: should roads be produced by the private.
Is a mixed funding model for the highway network sustainable over time? The Spanish case Germà Bel (Cornell University and Universitat de Barcelona) &
Viability Gap Funding By Ashok Chawla Additional Secretary Department of Economic Affairs, Government of India 20 th December, th December, 2006.
Railways in Sub-Saharan Africa An effective regional integration tool? Presented by : Pierre Pozzo di Borgo, Principal Investment Officer June 2013.
Rail Private Participation
Managing Director/CEO
Minnesota Department of Transportation ARRA, Greater Minnesota Transit, Airport Program Status, & Local Bridge Bonding Update House Transportation Finance.
Calgary Regional Partnership Workshop BC Transit Governance and Funding Experience Bill Lambert, Manager, Transportation Solutions, April 16, 2013.
Financing Urban Public Infrastructure
Low carbon transport policies for the UK Phase Two: Policies Keith Buchan, Director, MTRU.
Rail and the West Midlands Economy EMTA Conference Birmingham, 11/11/11 Peter Sargant Head of Rail Development, Centro.
Northern Lights Express High Speed Rail: MN APA Conference September 2011.
INDIA’S INFRASTRUCTURE – Issues and Prospects PRESENTATION BY SS Kohli Chairman & Managing Director INDIA INFRASTRUCTURE FINANCE COMPANY LTD NEW DELHI.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Freight and Logistics Council Presentation 26 March 15 Peter Parolo, Executive Director Ports and Maritime.
Sustainable travel for Limerick and Area By Professor Lewis Lesley.
THE CANADA LINE Project Backgrounder
Intercity Rail Background/ Statewide Freight and Passenger Rail Plan Update Met Council TAC Meeting November 5, 2008.
1 Veolia Transport Growing with Public Private Partnerships (PPP) An alternative financing solution.
Green Transport Dr Lina Shbeeb Minister of Transport. Jordan.
1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.
NEW STRATEGY FOR TRANSPORT GOVERNANCE IN MONTREAL March EMTA Meeting, Madrid.
Project Information Brief project description Cairo, Egypt Bus Rapid Transit System with potential capacity of 45,000 people per person per direction Phase.
REFORMS IN THE ROAD SECTOR IN KENYA Restructuring of Road Sub-Sector: Responding to Future Challenges Eng. Joseph N Nkadayo, MBS Director General, Kenya.
Problems, Opportunities, Implications and Priorities for RAI April 28, ? Moradkhani General Director, Bureau of Planning & Budget Kamyar Golestanian.
LEGAL# v1 Public Private Partnership in the Baltics and Europe Alternative means of financing public energy and infrastructure.
Hong Kong Railway plus Property Funding Model Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect.
Metropolitan Transportation Authority July Financial Plan 2016 – 2019 Presentation to the Board July 22, 2015.
Public Transportation at the State Level Regulation and Coordination By Moaz Yusuf Ahmad.
HŽ Passenger Transport – overviewBUCHAREST HŽ PASSENGER TRANSPORT.
Gauteng Strategic Plan Update Public Transport GDS 2055 Summit Hishaam Emeran, General Manager: Strategic Network Planning 7 September 2012.
1/14 Next Steps for Participating Economies to Develop EE Urban Passenger Transportation 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team.
Kiichiro Fukasaku Development Centre
Business Logistics 420 Public Transportation Lecture 17 Transportation Planning Overview.
The Regional Transport Strategy Transport for Regional Growth Conference Edinburgh 5 November 2015 John Saunders SEStran.
SINGAPORE +21 %.
Public Transportation Planning: Rapid transit solutions for adequate mass movement Mobility.
Enhancing Public Transport… …in the Klang Valley National Summit on Urban Public Transport 18 September, 2008.
Transport Integration of cross-border transport infrastructure TEN-T strategy on large cross- border cooperation projects Gudrun Schulze, Team leader,
PENGURUSAN ASET AIR BERHAD (PAAB) Briefing to Analysts 19 MARCH 2009.
Rail Schemes and the PPP Model November Rail Schemes and the PPP Model  Rail Schemes  PPP model  Successful Projects  Lessons Learned  Conclusions.
European Structural and Investment Funds for railways in Poland November 2015 Wolfgang Munch, Deputy Head of Unit DG Regional and Urban Policy.
Energy and Power Supply Papua New Guinea 1. PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held.
Metrô Rio & SuperVia March Location BRASIL Rio de Janeiro Rio Rio de Janeiro Metropolitan Region - Population: 11,6 million - Counties: %
Menauitpuitptransport#MENAUITP Land Transportation Projects in the Kingdom of Bahrain Nada Deen Director, Land Transportation Projects Ministry of Transportation.
The Gauteng Economic Indaba Transport and Logistics Mr Piet Sebola Group Executive Strategic Asset Development Date: 09 th June 2016.
Stage 2 Light Rail Transit Program “In the ground ready”
Challenges and solutions for transport in Norway
West of England Joint Transport Study
Developing Transport Service Contracts
Regional Roads Committee
Future Construction FasTracks Corridors Federal Funding Analysis
User Perspective on the State of Public Transportation
Responses to the Crisis An Urban Perspective
Evaluation Network Meeting Brussels, February 2010
METRO RAIL IN CHENNAI Prepared by S.PRABHAVARAJAN LECTURER.
Presentation transcript:

Cross-Border Infrastructure: A Toolkit Mass Transit: Comparison of Bangkok & Kuala Lumpur Session on Private Sector Participation Yong Hee Kong PPP Resource & Research Centre, Kuala Lumpur The views expressed here are those of the presenter and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Directors, or the governments they represent.

Cross-Border Infrastructure: A Toolkit KL: Historical Background Study by JICA 1987 Appeared in Mid-Term Review of 6th Malaysia Plan (1994) Appeared in subsequent Malaysia Plan. Lack of budget. Started in early 1990s, completed in August Government’s intention to create integrated rail transit network, part of multi-model urban transport system.

Cross-Border Infrastructure: A Toolkit KL: Overview of Urban Rail Network Four components:  KTM Komuter (157 km electrified double track system)  LRT 1 and 2 (STAR and PUTRA)  ERL (to KLIA airport)  KL Monorail

Cross-Border Infrastructure: A Toolkit KL: Privatized Urban Rail Transit System

Cross-Border Infrastructure: A Toolkit KL: Urban Rail Transit Network

Cross-Border Infrastructure: A Toolkit KL: Benefits of Privatization Reduced traffic congestion and time-saving. Positive impact on urban environment. Improved safety. Relieved government’s admin and financial burden. Promotion of economic growth. Helped to meet social target.

Cross-Border Infrastructure: A Toolkit KL: Issues Reasons behind the need to privatize urban transit system (10 years in the making) Reasons for negotiated bidding Over-estimation of passenger figures

Cross-Border Infrastructure: A Toolkit KL: Negotiated Bidding

Cross-Border Infrastructure: A Toolkit KL: Over-Estimation of Passenger Figures

Cross-Border Infrastructure: A Toolkit KL: Need for Restructuring and Improvement Both LRT (STAR and PUTRA) “nationalized” in September 2002  SPNB - takeover assets & liabilities  RAPID - takeover operations Steering Committee (INSPAK) formed to push for integration of all transport systems in Klang Valley. ERL and KL Monorail still struggling financially.

Cross-Border Infrastructure: A Toolkit KL: Lessons Learnt Over- estimation of ridership Overall authority body - to ensure vertical integration of systems Requires public sector subsidization to make fares affordable

Cross-Border Infrastructure: A Toolkit Bangkok Mass Transit Schemes Three separate schemes were initiated in the 1990’s  Bangkok Transit System (BTS or Skytrain)  Hopewell elevated rail project  The subway (20 km underground rail)

Cross-Border Infrastructure: A Toolkit

Bangkok Hopewell Concession given to Hopewell Company 60km multimodal transport system - elevated toll road, MRT, local road improvement and a port rail Financial attractiveness from property development rights on SRT-owned land Property boom collapse during 1997 financial crisis 14% completed Government terminated concession in 1998

Cross-Border Infrastructure: A Toolkit Bangkok - Skytrain Opened in late 1999 running on elevated heavy rail system above Bangkok commercial areas 23 km and 23 stations, cost US 1.5 billion Riderships below forecast  1st year, quarter of forecast  current, third of forecast Fare box sufficient to cover operating and maintenance costs but not capex. Financial problems, debt of more than BT40 billion Restructuring plan not yet approved by creditors Talks of government buying over the debts (and company)

Cross-Border Infrastructure: A Toolkit Bangkok - Subway Private operates (BMCL) on 25-year concession from Mass Transit Authority of Thailand. Public sector paid for construction, concessionaire paid for trains (80:20 funding). Construction started November 1996, opened on August km long with 18 stations and 3 interchange stations (to Skytrain). Average ridership below expectation at p/d.

Cross-Border Infrastructure: A Toolkit Lessons Learnt Low ridership - below forecast  Holistic approach required with vertical integration.  High initial capex - cost recovery result in relatively high fares compared to alternative transportation Linking transport infrastructure development to profits of property development is an insecure basis for ordered progress (Hopewell). MRT helps stimulate economic growth - e.g. rental rates of buildings gone up.