Infrastructure Development TM/WS Infrastructure Development 9-12 February 2010 Breakout session – Group 2.

Slides:



Advertisements
Similar presentations
Project Appraisal Module 5 Session 6.
Advertisements

Options appraisal, the business case & procurement
Singapore February 2001 Promoting Fair and Transparent Regulation in Securities Markets A Presentation to the APEC-OECD Co-operative Initiative on Regulatory.
TM/WSP 5-9 Nov Group A1- National position - Stakeholders involvement - Legislative framework - Safeguards QUESTIONS / DIFFICULTIES Can nuclear.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Nuclear Infrastructure Development Evaluation: Perspectives from the United States Dr. Marc A. Humphrey Office of Nuclear Energy, Safety and Security U.S.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
1 Regulatory Impact Assessment: Methodology and Best Practices David Shortall INMETRO International Workshop on Conformity Assessment Rio de Janeiro, Brazil.
Session 3 - Plenary on implementing Principle 1 on an Explicit Policy on Regulatory Quality, Principle 3 on Regulatory Oversight, and Principle 6 on Reviewing.
Non-governmental Actors in the Compliance with and Monitoring of Multilateral Environmental Decisions.
1 Brendan Devlin Adviser, Markets and Infrastructure Directorate B, DG ENER European Commission.
IAEA International Atomic Energy Agency Human Resources Development for Nuclear Safety J. Bastos NSNI/RAS.
Nuclear Energy in the 21 st Century BEIJING 2009 International Ministerial Conference April 2009.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool and Suggested Structure for Assessment United Nations Statistics.
Planning for a Vibrant Community. Introduction Planning is a process that involves: –Assessing current conditions; envisioning a desired future; charting.
IAEA, Vienna November 2007 SOME PROSPECTS FOR IMPROVING FINANCING OF DEVELOPMENT OF NUCLEAR POWER INFRASTRUCTURE TECHNICAL WORKSHOP ON THE ISSUES FOR THE.
TTBIZLINK PROJECT MINISTRY OF TRADE, INDUSTRY, INVESTMENT & COMMUNICATIONS.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
Regulatory Transparency and Interaction with the Government Dr. Konstantin Petrov Head of Section, Policy and Regulation.
Eshboev B.A. Head of the Department for Monitoring of implementation of national development programmes of the Ministry of Economic Development and Trade.
Climate Change Related Activities in Romania Dumitra MEREUTA Ministry of Environment and Sustainable Development - June 2007, Bucharest -
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
WHO–ITU National eHealth Strategy Toolkit An effective approach to national Strategy Development and Implementation Clayton Hamilton WHO Regional Office.
Tom MAZOUR IAEA, Division of Nuclear Power
The Draft SADC Annex on Trade in Services UNCTAD Secretariat Sub-regional Conference on Improving Industrial Performance and Promoting Employment in SADC.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
STRUCTURE OF PRESENTATION 1. Energy Policy goals and Review remit 2. Key challenges 3. Conclusions and Impact 4. Next Steps/Issues 1.
IAEA International Atomic Energy Agency Nuclear Energy Programme Implementing Organization (NEPIO) Anne Starz Nuclear Power Engineering.
GROUP 3:Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru, IAEA consultant Reporter:
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Analysis of the planning process Why and how? Session.
Human Resources Development TM/WS Infrastructure Development 9-12 February 2010 Breakout session – Group 1 Moderator: Mr. Biro Lucian (Romania) Reproter:
TM/WS 9-12 February GROUP 3: Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru,
Human Resources Development TM/WS Infrastructure Development 9-12 February 2010 Breakout session – Group 2.
Some inter-institutional coordination experiences for the generation of information on energy sector in Mexico OSLO GROUP ON ENERGY STATISTICS Second Meeting.
56th Regular Session of the IAEA General Conference
Robert Fookes Although separate applications must be made for the generating station and the grid upgrade. Government believes that both applications.
Lessons from Programme Evaluation in Romania First Annual Conference on Evaluation Bucharest 18 February 2008.
[Country] Poverty-Environment Initiative Economics Assessment/Valuation of Environment and Natural Resources Country Experience Presented to the PEI Africa.
Technical Meeting on Milestones for nuclear power infrastructure development Radiation Protection Khammar Mrabit Head, Regulatory Infrastructure and Transport.
Background very brief summing up of the NSS conclusions Background very brief summing up of the NSS conclusions Dr. Elewa.
TM/WS 9-12 February Group 3 Human Resources Development Break-out Session 1. EXPERIENCES  Core group (NEPIO=Coordination Group) involved in the.
TM/WS 9-12 February Group:Nuclear Infrastructure Development Break-out Session 1. EXPERIENCES 1. Have tried to avoid contact with vendors since this.
Presented by Michael W. Sydow, PE Chief, Environmental and IIS Management Branch USAED Savannah Performance Based Contracting A USACE Perspective.
ENERGY SECURITY AND ENERGY UNION PERSPECTIVES FOR MOLDOVA Main achievement – signing and ratification of the EU-Moldova Association agreement Development.
NPP Vendors Perspectives TM/WS Infrastructure Development 9-12 February 2010 Breakout session – Group 4.
INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.
Regulatory Administrative Institutions MPA 517 Lecture-7 1.
UNEP EIA Training Resource ManualTopic 14Slide 1 What is SEA? F systematic, transparent process F instrument for decision-making F addresses environmental.
An overview of OECD Strategies for Improving Regulatory Performance Regulatory Reform and Building Governance Capacities – New Delhi 3 December 2009 Mr.
IAEA International Atomic Energy Agency Working Group 4B Developing a Capable NEPIO Difficulties and Solutions.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
IAEA International Atomic Energy Agency Milestones in Development of a National Infrastructure for Nuclear Power Infrastructure Issue: Management C.R.
Overview of Good Regulatory Practice Kent Shigetomi Office of the U.S. Trade Representative.
Infrastructure Development TM/WS Infrastructure Development 9-12 February 2010 Breakout session – Group 4.
Development Account: 6th Tranche Strengthening the capacity of National Statistical Offices (NSOs) in the Caribbean Small Island Developing States to fulfill.
Regulatory Strategies and Solutions Group, LLC
Communication and Consultation with Interested Parties by the RB
Human Resources Development
Working Group 1B Developing a Capable NEPIO
Strategic Environmental Assessment (SEA)
Accelerating the Deployment of Offshore Renewable Energy Technologies - Project Proposal - Michael Paunescu Renewable and Electrical Energy Division.
Infrastructure Development
Nuclear Energy Programme Implementing Organisation
SUSTAINABLE ENERGY SUPPLY
Overview of Good Regulatory Practice
National Position.
Synergies between NDCs & SDGs; Integration into National Planning
Infrastructure investments – source of future well-being
Strategic development goals and priorities of the Republic of Tajikistan . National monitoring and evaluation system for their achievements. Eshboev.
Presentation transcript:

Infrastructure Development TM/WS Infrastructure Development 9-12 February 2010 Breakout session – Group 2

TM/WS – Breakout session9-12 February Group2Infrastructure Development 1. EXPERIENCES 1. How is nuclear energy considered in the energy matrix:  Technical-economic approach (projected marginal cost, fossil fuel prices, nuclear investment cost, etc.)  As a way to diversify the energy mix and strengthen energy security.  Discussed as a strategic political decision, not so much based on economics (specially in countries that rely heavily on fossil fuels or are net importers of electricity). 2. Kind of indications expected at the level of national government:  National policy or clear statement (to avoid the uncertainties associated to the political cycle).  To clearly define a generic framework and hopefully to formally state the convenience to develop a NPP. 3. Type of structure established (NEPIO):  Most countries haven’t adopted formally a NEPIO, but have established a similar organization that performs basically the same tasks.  This organization usually adopts the form of an inter-ministerial steering committee.

TM/WS – Breakout session9-12 February Group2Infrastructure Development 1. EXPERIENCES 4. When to perform the feasibility study:  Early on in the process => It requires to have already selected a site and performed an initial environmental assessment. 5. Main directions for the promotion of national participation:  Different countries are pursuing different objectives. i.Generating competitive energy => Turnkey approach with limited national involvement. ii.Developing a local nuclear industry => An important national involvement and technology transfer is established as a strategic goal. 6. Good practices already in place:  Multiple-Bilateral agreements. 7. Self-assessment exercise:  Useful guide, but needs to be reviewed and improved (it is redundant and it has a lot of overlapping).  Good starting point.

TM/WS – Breakout session9-12 February Group2Infrastructure Development 1. EXPERIENCES 8.Other particular challenges:  Public acceptance.  Cost: i.Financial cost. ii.Costs associated to the development of all infrastructure.  Availability of vendors and/or suppliers.

TM/WS – Breakout session9-12 February Group2Infrastructure Development 2. LESSONS LEARNED 1. How is nuclear energy considered in the energy matrix:  Importance to clearly establish economic viability of nuclear power compared to other energy options (good signal for potential investors).  Importance of using technical models (IAEA models and/or others). 2. Kind of indications expected at the level of national government:  Once a statement is issued as a law, it is more difficult for the decision to be reversed. It also gives a good signal for potential investors.  The kind of statement needed depends on the phase of the process where the country is => to adopt a gradual approach.  The energy strategy needs to be supported by solid facts to survive political cycles. 3. Type of structure established (NEPIO):  The creation of a formal NEPIO might not be beneficial for the process since it gives the impression that the decision has already been taken.  It might be beneficial to include politicians from all parties in the process.

TM/WS – Breakout session9-12 February Group2Infrastructure Development 2. LESSONS LEARNED 4.When to perform the feasibility study:  The kind of feasibility study needed depends on the phase of the process where the country is => to adopt a gradual approach. In phase 1 pre- feasibility study should be enough. 5. Main directions for the promotion of national participation:  Different approaches have different implications (it depend on which are the goals set by the country).  They might be trade offs in terms of time and money depending on which approach the country adopts in terms of local participation.  A minimum level of local participation is required. 6. Good practices already in place:  Having a strategic consultant involved early in the process (some decisions that need to be made very early on have a huge impact later on). 7. Self-assessment exercise:  Rigid approach. It is difficult to use for countries that already have nuclear experience.

TM/WS – Breakout session9-12 February Group2Infrastructure Development 3. DIFFICULTIES/CHALLENGES 1. Private investors face several uncertainties that make assessing the nuclear option difficult and therefore, getting involved in the nuclear business unattractive. 2. To ensure the long term sustainability and timely development of the project.

TM/WS – Breakout session9-12 February Group2Infrastructure Development 4. RECOMMENDATIONS 1. All countries should perform technical and economic studies to determine what would be the cost of nuclear power (regardless of whether the nuclear option is being considered an economic or strategic decision). 2. Kind of indications expected at the level of national government  A clear policy statement is required, hopefully included on a nuclear law (to ensure the long term commitment to develop a NPP).  At the end of a government to hand a comprehensive well-document report explaining the process and main conclusions to the next administration. 3. Type of structure established (NEPIO):  To include all relevant ministries involved in the process early on.  To include the regulatory body involved in the process early on.

TM/WS – Breakout session9-12 February Group2Infrastructure Development 4. RECOMMENDATIONS 4.When to perform the feasibility study:  The pre feasibility study should be performed before the decision is taken. Onwards, feasibility studies should become more comprehensive. It would be helpful if the IAEA could clearly define what elements should be included in the feasibility studies on the different phases. 5. Main directions for the promotion of national participation:  Countries must be realistic on the level of local participation that can be achieved. 7. Self-assessment exercise:  The guide should allow for some flexibility in its usage.  It needs to better define what is understand as “evidence”.