Vermont Yankee VSNAP Presentation February 22, 2011 Mike Romeo Director NSA.

Slides:



Advertisements
Similar presentations
Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
Advertisements

Overview of the EPRI Groundwater Assessment Program
Application Update of ANI Guideline “ Potential for Unmonitored & Unplanned Off- Site Releases of Radioactive Material” William Wendland, P.E. American.
Application of ANI Guideline William Wendland, P.E. American Nuclear Insurers Glastonbury, Connecticut USA Philadelphia, PA June 2007 “ RETS – REMP.
By Chris Ford and James Hughes ( ) ( )
Office of Science Experience with Surveillance and Maintenance (S&M) of Environmental Remediation David Michlewicz – DOE Office of Science, Office of Safety,
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
Identify source area and COCs Determine nature and extent of discharge Evaluate potential risks to public health and the environment Develop Investigation.
Part III Solid Waste Engineering
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
RETS – REMP Workshop NRC Activities June 25, 2007 Presented by Steve Garry.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Tritium Management at Fermilab Stuart Henderson Associate Laboratory Director for Accelerators Community Advisory Board Meeting August 23, 2012.
Tritium. Bldg Site of SNAP8ER Reactor Accident.
Connecticut Department of Energy and Environmental Protection.
U.S. EPA Regulations Review Update: Subpart W NESHAPS (40 CFR 61) Uranium and Thorium Mill Tailings (40 CFR Part 192) Andrea Cherepy, Phil Egidi, Reid.
Presented by: Jonathan Silvester Oliver Kiernan. Maxey Flat Site Located in Fleming County, Kentucky Low level Nuclear Disposal Facility o Isolate waste.
Groundwater Protection Initiative Status George Oliver RETS/REMP Conference June 25-27, 2007.
NuMI Radiation and Environmental Protection NBI th International workshop on Neutrino Beams and Instrumentation September 5-9, 2006 Mike Martens.
Brunswick Nuclear Plant Storm Drain Stabilization Pond Tritium Issues.
Town Hall Meeting 12 March 2008 Carmichael Area Aerojet Groundwater Remediation Progress Update 12 March 2008.
Presented at the 2007 RETS/REMP Workshop J. Stewart Bland, CHP Chesapeake Nuclear Services, Inc. Annapolis, MD June 27,
Environmental Investigation by Con Edison Former E115th Street Gas Works November 13, 2007.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
Vermont Yankee Public Oversight Panel Supplemental Report February 22, 2011 Presentation to the: VSNAP Fairewinds Associates, Inc Arnie Gundersen.
Dounreay Nuclear and Chemical Land Contamination.
Assessing Your School An Environmental Investigation You have been hired by Eagle Environmental, Inc. to perform an Environmental Assessment of South Hunterdon.
Connecticut Department of Energy and Environmental Protection.
Northwest Area Committee Meeting June 29, 2011 C. Terada, EPA Japan 2011 US National Radiation Monitoring.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
The Status of Water Services in County Galway A presentation to the Joint Committee on Environment, Transport, Culture and Gaeltacht 27 th September 2011.
TRP Chapter Chapter 4.2 Waste minimisation.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
EMERGENCY PLAN AND PROCEDURE IN INDUSTRY INVOLVING NORM/TENORM
Protection Against Occupational Exposure
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
Update on progress with development of DS459
Material Disposition Planning Olga Ligeti Radiation Protection Department MARCH 24, 2009.
Environmental Statistics of Jordan Department of Statistics Jordan Munther Badriyah Head of Environment Statistics Division 20-22/10/-2010 Santiago - Chili.
Emergency Exposure Situations Overview of Assessment and Response in a Radiological Emergency Generic response organization Emergency management Lecture.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
What effects do they have in drinking water
Annual Site Environmental Report (ASER) Calendar Year 2011 West Valley Demonstration Project Presented by: John Rendall, Regulatory Strategy.
Nuclear Power Regulatory Overview The Keys To Our Success By Bob Wills RRPT GEL Laboratories, LLC.
RESPONSIBLE CARE ® POLLUTION PREVENTION CODE David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Underground Storage Tank Compliance Act of 2005 Bill Torrey UST/LUST Regional Program Manager US EPA – New England EBCNE April 19, 2006.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
February 26, Joseph Lynch Government Affairs Manager, Entergy Vermont Yankee, LLC (ENVY)
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
1 NSW Environment Protection Authority (EPA) Carmen Dwyer Director Gas Implementation.
Regulatory Framework for Uranium Production Facilities in the U.S.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
Bechtel National Inc. 1 Using Human Performance Analysis to Eliminate Errors Presented September 13, 2006 DOE Integrated Safety Management Best Practices.
Placer County Water Agency Middle Fork American River Project Plenary Meeting January 4, 2010 Handout #3.
November 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
Groundwater Protection Project Greg Robison Project Manager Ed Sullivan Consulting Engineer June 23, 2008.
ESAC Meeting December 1, pm LOS REALES LANDFILL UPDATE Entrance Facility Rodeo Wash Erosion Control Structure Scale House Drainage and other Stormwater.
David K. Paylor Virginia State Board of Health March 17, 2016.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Long-Term Management of Contaminated Soil and Groundwater – Iwilei District, Honolulu April 16, 2015.
Water Quality Facts John Shirey City Manager William Busath, P.E. Director of Utilities Pravani Vandeyar Water Quality Superintendent.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
Presentation transcript:

Vermont Yankee VSNAP Presentation February 22, 2011 Mike Romeo Director NSA

Agenda ●VY was requested to present ●Groundwater monitoring ●Tritium testing and extraction ● Drinking well water testing status ●VY was requested to present ●Groundwater monitoring ●Tritium testing and extraction ● Drinking well water testing status

Entergy Focus on Safe Plant Operations ●Health and Safety our highest priority ●NO detectable Tritium levels found in drinking water ●NO detectable Tritium levels found in Connecticut River ●NO public health or safety issues; confirmed by Vermont Department of Health ●NO nuclear safety issues ●Entergy will NOT jeopardize nuclear, radiological, environmental, or public safety ●Health and Safety our highest priority ●NO detectable Tritium levels found in drinking water ●NO detectable Tritium levels found in Connecticut River ●NO public health or safety issues; confirmed by Vermont Department of Health ●NO nuclear safety issues ●Entergy will NOT jeopardize nuclear, radiological, environmental, or public safety

Tritium Background What is Tritium? An isotope of hydrogen  Occurs naturally and as a by-product of nuclear power operations When combined with oxygen, it becomes “tritiated water” US Environmental Protection Agency identifies tritium as among the weakest of radionuclides  Emits very low energy beta particle  Particle does not penetrate skin  Particle does not travel far in air (inches)

Voluntary Groundwater Monitoring Initiative Prior to 2007 there were 31 groundwater monitoring wells on site at VY for various reasons In 2007 installed 3 new wells (Phase 1) for the groundwater monitoring initiative In 2010 we accelerated the placement of phase 2 wells onsite. A total of 62 wells are currently on site. 31 original and 31 monitoring wells for the groundwater monitoring initiative.

Site Well Positions Groundwater flow direction

Site Well Locations Close-up Groundwater flow direction

Groundwater Remediation Extraction wells were located in order to remove the largest possible amount of tritium Transport of the extracted groundwater to a licensed disposal facility was performed Total Volume extracted to date is 320,500 gals  As part of the current extraction process, 13,200 gal is currently on site in the collection tank  307,300 gal have been shipped offsite

Groundwater Remediation Besides tritium, no other plant generated radionuclides identified in groundwater Removing water is expected to reduce the overall tritium content in the groundwater

Groundwater Extraction Entergy is committed to continued extraction in an effort to remove more tritiated water Entergy is also committed to sampling from the COB Well  A modification is in the approval process for implementation on or about Friday Feb 25 th.

GZ-24 Investigation On January 17, 2011 VY Chemistry became aware of a positive tritium identification in well GZ-24 Notifications were promptly made to stakeholders An investigation team was formed and we are actively seeking to identify the source of the tritium in GZ-24

GZ-24 Investigation GZ-24 is a Sentinel well located near the RadWaste Building. GZ-24 tested positive on sample obtained December 28 Team is investigating potential sources  Migration of tritium plume from AOG Pipe Tunnel Leak  Buried lines of interest  Sumps and tanks

Site Well Locations Close-up

GZ-24 Investigation Pipelines of Interest  RW-204 Stack Sump Discharge Line  WRW-243-G1 Drain Line from 2 nd AOG Delay Pipe  RW-186 Drain Line from Steam Packing Exhaust  RW-176 Drain Line from 1 st AOG Delay Pipe  RW-187 Drain Line from Standby Gas Treatment System

GZ-24 Investigation To date, the Stack Sump Discharge Line (RW-204) and 2 nd Stage AOG Delay Pipe (WRW-243) Drain Line have been tested and ruled out as sources. RW-186 line has been tested 2/21 and data is being evaluated Preparations underway for test of 1 st Stage AOG Delay Pipe Drain (RW-176). Loop Seal Modifications underway RW-187 Drain Line from Standby Gas Treatment System testing is being planned

Summary ●Health & Safety always our First Priority ●Strong Communications with new Administration ●Continued Commitment to Operational Excellence ●Health & Safety always our First Priority ●Strong Communications with new Administration ●Continued Commitment to Operational Excellence

Final review ● VY was requested to present ● Groundwater monitoring ● Tritium testing and extraction ● Drinking well water testing status Panel questions?