CVFD Training – Ventilation Practices

Slides:



Advertisements
Similar presentations
Fire Behaviour Ventilation. Aim To provide students with information to give them an understanding of the behaviour of fire.
Advertisements

BUILDING CONSTRUCTION
Ventilation.
UNIVERSITY of NORTHERN COLORADO HOT WORK PROGRAM.
Breaking and Breaching. Tools Used Sledge hammers –Long and short handled Chisels Pinch point pry bar –“Crow bar” Hacksaw Handsaw Bolt cutter Flat head.
1926 Subpart J Establishes the requirements for welding and cutting in the construction industry Establishes requirements for equipment, fire protection,
Intermediate SFFMA Objectives: – Hrs received.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Intermediate SFFMA Objectives: – Hrs received.
North Idaho Emergency Services Academy. Objectives Types of fire service laddersTypes of fire service ladders Ladder termsLadder terms Ladder raising.
Welding, Cutting, and Brazing
Section 2 Safety, Tools and Equipment, Shop Practices Unit 4 General Safety Practices.
14 Ventilation Skill Drills. 2 Objectives (1 of 2) Break glass with a hand tool. Break a window with a ladder. Break windows on upper floors using the.
Basic Fire Attack Dallas Fire Rescue Explorers. Basic Fire Attack Overview of Fire Attack Overview of Fire Attack Rescue Activities Rescue Activities.
FVCC Fire Rescue Ventilation Part A Truck Company Operations Review of Ventilation Principles & Practices.
Chapter 11 Lesson Goal After completing this lesson, the student shall be able to identify reasons and needs for various types of ventilation within a.
Ventilation Objectives The student will: Understand the importance of ventilation. Be able to identify when and where to ventilate. Understand the dangers.
Standard 29 CFR Part Welding, Cutting and Brazing Training.
Buildings and Structures 2 Natural and Mechanical Ventilation.
Categories of Aerial Ladders Aerial Ladders Aerial Platforms Telescoping Aerial Platform Tele-Squirt Articulating Aerial Platform Quint.
Fire Suppression Techniques IFSTA Chapter 14
HOT WORK PROCEDURES Welding and Hot Work, such as brazing or grinding present a significant opportunity for fire and injury. CCR Title 8 Sub Chapter 7,
7/2/2015Dixon High School Fire Department1 The Recruit will also practice and master certain skills and will be tested on these skills. At the end of each.
FVCC Fire Rescue LADDERS.
Fall Protection in the Roofing Industry
Ventilation for Confined Spaces requires ventilation as follows: An employee may not enter the space until the forced air ventilation has eliminated.
CVFD Training – Fire Protection Systems
VENTILATION.
CVFD Training – Ventilation Practices
Instructor: Dan Braitsch
TS 10–1 VENTILATION The systematic removal of heated air, smoke, and gases from a structure and replacement with cooler, cleaner air.
FVCC Fire Rescue Ventilation Part B. Types of Ventilation Horizontal Ventilation: Use of doors and windows to ventilate across the floor of a building.
14 Ventilation.
MODULE:3 FIRE CONFINMENT AND EXTINGUISHMENT. OBJECTIVES Module 3 Select and deploy the appropriate hose lines to accomplish fire confinement and extinguishment.
14 Ventilation. 2 Objectives Define ventilation as it relates to fire suppression activities. List the effects of properly performed ventilation on fire.
Ventilation Tools Firefighter I. Copyright and Terms of Service Copyright © Texas Education Agency, These materials are copyrighted © and trademarked.
HVACR416 - Design IAQ / Ventilation / Pathways. Ventilation Most air handling units distribute a mix of outdoor air and re-circulated indoor air. Some.
MODULE:3 FIRE CONFINMENT AND EXTINGUISHMENT. OBJECTIVES Module 3 Overview Select and deploy the appropriate hose lines to accomplish fire confinement.
Tempest Blower SECTION: Tools and Equipment ISSUED: REVISED: ##-####
MODULE 6: PRIVATE DWELLING SIMULATIONS. OBJECTIVES Module 6 Overview Identify the unique construction factors of single-family dwellings. Recognize the.
MODULE 6: PRIVATE DWELLING SIMULATIONS. OBJECTIVES Module 6 Identify the unique construction factors of single-family dwellings. Recognize the basic problems.
1 © 2009 Delmar, Cengage Learning Special Concerns in Fire Fighting Chapter 6 Page 133.
21 Fire Suppression Skill Drills. 2 Objectives Apply water using the direct, indirect or combination attack. Use a large handline using the one- or two-
Structure Fire Ventilation Making firefighting easier.
State of Georgia BASIC FIRE FIGHTER TRAINING COURSE
Unit 4: General Safety Practices
Aerial Apparatus Operator
Ventilation Skill Drills.
14 Ventilation. 2 Objectives (1 of 3) Define ventilation as it relates to fire suppression activities. List the effects of properly performed ventilation.
Part C: Class D Fires and Tactical Considerations.
Structure Fire Ventilation
Mine Emergency Preparedness Training Mine Recovery.
1. 2  Dispatch information  Day of week  Time of day  Pre-incident survey  Observations  Building construction, layout  Bystanders.
Confined Spaces. Definition: Are large enough that an employee can bodily enter them Are not designed for continuous occupancy. Have limited or restricted.
PPT Basic Ventilation Bureau of Workers’ Compensation PA Training for Health & Safety (PATHS)
Welding, Cutting, and Brazing
Building Construction
Hot Work Permit Osan AB Fire Emergency Services.
Quarterly Training May  Terminology  Building Construction  Keys to Incident Resolution  First Alarm STRIP MALL S.O.G.
Excavation & Trenching Awareness Plus
Essentials of Fire Fighting 6 th Edition Firefighter I Chapter 13 — Tactical Ventilation.
Learning Objective 7 Describe the types of vertical ventilation.
Fire Suppression (Fire Fighter II)
General Safety Practices
Metal Window & Door Enclosures
NOVA MANUAL TRAINING TOWNHOUSE June 2009
Essentials of Fire Fighting, 5th Edition
Presentation transcript:

CVFD Training – Ventilation Practices SFFMA Training Objectives: 8-01.05 – 8-01.08

Vertical Ventilation Opening roof/existing roof openings for allowing heated gases, smoke to escape Firefighters must understand basic types, designs of roofs (Continued) Firefighter I

Vertical Ventilation Firefighters must know how roofs in the response areas are constructed (Continued) Firefighter I

Vertical Ventilation — Preincident Inspections Identify New construction projects Existing construction Use of lightweight building materials Information that can alert firefighters Firefighter I

Likelihood of Roof Collapse During Vertical Ventilation Based on Volume of fire How long fire has been burning Type of construction Level of protection Load on roof Firefighter I

Responsibilities During Vertical Ventilation — Officer in Charge Determine it can be done safely, effectively Consider age, type of construction Consider location, duration, extent of fire Observe safety precautions (Continued) Firefighter I

Responsibilities During Vertical Ventilation — Officer in Charge Identify escape routes Select place to ventilate Move personnel, tools to roof Firefighter I

Responsibilities During Vertical Ventilation — Leader on Roof Ensure roof safe to operate on Ensure only required openings made Direct efforts to minimize secondary damage Coordinate crew’s efforts with firefighters inside building (Continued) Firefighter I

Responsibilities During Vertical Ventilation — Leader on Roof Ensure safety of all personnel Ensure team leaves roof as soon as assignment completed Firefighter I

Safety Precautions During Vertical Ventilation Check wind direction with relation to exposures Work with wind at back/side to provide protection while cutting Note existence of roof obstructions/ excessive weight on roof (Continued) Firefighter I

Safety Precautions During Vertical Ventilation Provide secondary means of escape for crews (Continued) Firefighter I

Safety Precautions During Vertical Ventilation Ensure main structural components not cut while creating opening Guard opening to prevent personnel falling into it Evacuate roof promptly when ventilation complete (Continued) Firefighter I

Safety Precautions During Vertical Ventilation Use lifelines, roof ladders, other means to prevent sliding/falling Make sure roof ladder (if used) firmly secured over roof’s peak Exercise caution when working around electric, guy wires (Continued) Firefighter I

Safety Precautions During Vertical Ventilation Ensure all personnel on roof wear full PPE including SCBA Keep other firefighters out of range of those swinging axes, operating saws Caution axe users to be aware of overhead obstructions (Continued) Firefighter I

Safety Precautions During Vertical Ventilation Start power tools on ground to ensure operation; shut off before hoisting/ carrying to roof Extend ladders 3-5 rungs above roof line, secure ladder When operating from aerial ladder platforms, floor of platform even with/ slightly above roof level (Continued) Firefighter I

Safety Precautions During Vertical Ventilation Check roof for structural integrity before stepping on, continue sounding throughout operation (Continued) Firefighter I

Safety Precautions During Vertical Ventilation Always walk on bearing walls, strongest points of roof structure Ensure ceilings punched through to enhance ventilation Firefighter I

Unsafe Roof — Warning Signs Melting asphalt Spongy Roof Smoke coming from roof Fire coming from roof Firefighter I

DISCUSSION QUESTION What should you do if you are assigned to ventilate a roof and find warning signs present? Firefighter I

Roof Coverings Part of roof exposed to weather Types Some susceptible to ignition from sparks, burning embers; others not Some have coating of insulating material Firefighter I

Existing Roof Openings Sometimes used for vertical ventilation Rarely in best location/large enough Usually supplement cut holes (Continued) Firefighter I

Existing Roof Openings Scuttle hatches Skylights Monitors Ventilating shafts Penthouse/bulkhead doors Firefighter I

General Ventilation Considerations for Roofs Square/rectangular opening easier to cut, easier to repair One large opening better than several small Firefighter I

Flat Roofs Commonly found on commercial, industrial, apartment buildings Common on many single-family residences (Continued) Firefighter I

Flat Roofs May/may not have slight slope for drainage Frequently penetrated by chimneys, vent pipes, etc. May be surrounded and/or divided by parapets (Continued) Firefighter I

Flat Roofs May support water tanks, HVAC equipment, etc. Structural part Decking Construction materials determine equipment necessary to ventilate Firefighter I

Pitched Roofs Among most common are those elevated in center along ridge with roof deck sloping down to eaves along roof edges (Continued) Firefighter I

Pitched Roofs Shed roofs — Pitched along one edge with deck sloping down to eaves at opposite edge Most involve rafters/trusses Have more pronounced downward slope than flat; may be steep (Continued) Firefighter I

Pitched Roofs Procedures for opening similar to flat roofs; precautions must be taken to prevent slipping Some types may require different opening techniques Firefighter I

Arched Roofs Can span large open areas unsupported by pillars/posts One type uses bowstring trusses (Continued) Firefighter I

Arched Roofs Lamella or trussless arched roofs (Continued) Firefighter I

Arched Roofs Procedures for cutting ventilation openings same as flat/pitched except no ridge to hook roof ladders; curvature of roof prevents roof ladders from lying flat Firefighter I

Precast Concrete Roofs Can be fabricated off-site Available in many shapes, sizes, designs Some use lightweight material (Continued) Firefighter I

Precast Concrete Roofs Lightweight usually finished with roofing felt and mopping of hot tar Extremely difficult to break through Existing openings should be used for ventilation on heavy roofs Firefighter I

Poured-In Place Concrete Roofs Some lightweight concrete roof decks poured in place over permanent form boards, steel roof decking, paper-backed mesh, or metal rib lath (Continued) Firefighter I

Poured-In Place Concrete Roofs Relatively easy to penetrate Some can be penetrated with hammer-head pick or power saw with concrete blade Heavier roofs require jackhammer/ diamond-tipped chain saw Firefighter I

Metal Roofs Made from several different kinds of metal; constructed in many styles (Continued) Firefighter I

Metal Roofs Light-gauge steel roof decks can be supported on steel frameworks/laid over existing roof Light-gauge cold-formed steel sheets used primarily for industrial buildings (Continued) Firefighter I

Metal Roofs Except when covered with lightweight concrete, seldom covered with roofing material Metal cutting tools/power saws with metal cutting blades must be used to open (Continued) Firefighter I

Metal Roofs Often penetrated by roof openings Older buildings may have roofs made of large pieces of sheet metal laid over skip sheathing Firefighter I

DISCUSSION QUESTION What are some examples of occupancies in your area? How would these occupancies need to be addressed when ventilating the building? Firefighter I

Trench Ventilation (Strip Ventilation) Used to stop spread of fire in long, narrow structure (Continued) Firefighter I

Trench Ventilation (Strip Ventilation) Performed by cutting large opening at least 4 feet (1.2 m) wide extending from one exterior wall to opposite exterior wall Often, large ventilation opening is cut between trench cut and fire Firefighter I

Conventional Basement Ventilation In absence of built-in vents from basement, heat and smoke from basement fires quickly spread upward (Continued) Firefighter I

Conventional Basement Ventilation Can be accomplished several ways Ground-level windows — horizontal ventilation Windows unavailable — interior vertical ventilation Firefighter I

Factors Reducing Effectiveness of Vertical Ventilation Improper use of forced ventilation Indiscriminant window breaking Fire streams directed into ventilation openings Breaking skylights (Continued) Firefighter I

Factors Reducing Effectiveness of Vertical Ventilation Explosions Burn-through of roof, floor, wall Additional openings between attack team, upper ceiling Firefighter I

Negative-Pressure Ventilation (NPV) Oldest type of mechanical forced ventilation techniques — Using fans to develop artificial circulation/enhance natural ventilation (Continued) Firefighter I

Negative-Pressure Ventilation (NPV) Fans placed in windows, doors, roof vent openings to exhaust smoke, heat, gases (Continued) Firefighter I

Negative-Pressure Ventilation (NPV) NPV operations Fan should be positioned to exhaust in same direction as prevailing wind Technique uses wind to supply fresh air If prevailing wind too light, fans can be positioned on windward side of structure to blow air into building (Continued) Firefighter I

Negative-Pressure Ventilation (NPV) If open areas around smoke ejector not properly sealed Air can recirculate into building Atmospheric pressure pushes air back through spaces; smoke reenters room To prevent recirculation, cover area around fan (Continued) Firefighter I

Negative-Pressure Ventilation (NPV) Flow of smoke, other gases to exit opening should be kept straight as possible (Continued) Firefighter I

Negative-Pressure Ventilation (NPV) Avoid opening windows near exhaust fan because this can reduce efficiency Remove all obstacles to airflow (Continued) Firefighter I

Negative-Pressure Ventilation (NPV) Do not allow intake side of fan to become obstructed When ventilating potentially flammable atmospheres, only exhaust fans with intrinsically safe motors, power cable connections should be used (Continued) Firefighter I

Negative-Pressure Ventilation (NPV) Exhaust fans should be turned off when moved; carry by handles Before starting exhaust fans, be sure no one near blades; other materials not in position to be drawn into fan Discharge stream of air should be avoided (Continued) Firefighter I

Positive-Pressure Ventilation (PPV) Forced ventilation technique that uses high-volume fan to create slightly higher pressure inside than that outside (Continued) Firefighter I

Positive-Pressure Ventilation (PPV) As long as pressure higher inside building, smoke within building forced through ventilation exit opening (Continued) Firefighter I

Positive-Pressure Ventilation (PPV) Location where PPV set up is entry point Once location selected, create exit opening opposite Size of exit opening varies with size of entry opening, capacity of blower Exit opening may be window/doorway (Continued) Firefighter I

Positive-Pressure Ventilation (PPV) Once exit opening created Blower placed 4-10 feet (1.2-3 m) outside open entry point Smoke then expelled from exit opening To maintain positive pressure inside, important that no other exterior doors/ windows are opened during operation (Continued) Firefighter I

Positive-Pressure Ventilation (PPV) By selectively opening, closing interior doors and exterior windows, it is possible to pressurize one room/area at a time (Continued) Firefighter I

Positive-Pressure Ventilation (PPV) Several considerations for using PPV to ventilate multistory building Requires good fireground discipline, coordination, tactics (Continued) Firefighter I

Positive-Pressure Ventilation (PPV) Main problem in aboveground operations — Coordinating opening, closing of doors in stairwell To control openings/pressure leaks, put one person in charge of pressurizing process (Continued) Firefighter I

Positive-Pressure Ventilation (PPV) To ensure effective PPV operation Take advantage of existing wind Make certain cone of air from blower covers entire entry opening Reduce size of area being pressurized to speed up process by selectively opening, closing interior doors (Continued) Firefighter I

Positive-Pressure Ventilation (PPV) To ensure effective PPV operation Keep size of exit opening in proportion to entry opening Avoid creating horizontal openings by breaking glass/removing doors Firefighter I

Advantages of PPV Compared to NPV Firefighters can set up PPV without entering smoke-filled environment PPV usually effective with horizontal or vertical ventilation Removal of smoke, heat more efficient with PPV (Continued) Firefighter I

Advantages of PPV Compared to NPV Velocity of air currents within building minimal and minimally disturb building contents/debris Fans powered by internal combustion engines operate more efficiently in clean, oxygen-rich atmospheres (Continued) Firefighter I

Advantages of PPV Compared to NPV Placement of fans does not interfere with ingress/egress Cleaning, maintenance of fans for PPV less than those for NPV PPV effective in all types of structures (Continued) Firefighter I

Advantages of PPV Compared to NPV Heat, smoke may be directed away from unburned areas/paths of exit with PPV Exposed buildings can be pressurized by PPV to reduce fire spread Firefighter I

Disadvantages of PPV Intact structure required Interior carbon monoxide levels may be increased if exhaust from fans allowed to enter Hidden fires may be accelerated, spread throughout building Firefighter I

DISCUSSION QUESTION In what types of fires do you think PPV would be more effective? In what types of fires will NPV work better? Firefighter I

Hydraulic Ventilation May be used in situations where other types of forced ventilation unavailable Used to clear room or building of smoke, heat, steam, gases after fire controlled (Continued) Firefighter I

Hydraulic Ventilation Uses air movement created by fog stream to help draw products of combustion out of structure Firefighter I

Performing Hydraulic Ventilation Fog stream set on wide fog pattern that covers 85-90 percent of window/door opening from which smoke will be pushed out Nozzle tip should be at least 2 feet (0.6 m) back from opening Larger the opening, faster the process (Continued) Firefighter I

Performing Hydraulic Ventilation Firefighter I

Disadvantages to Hydraulic Ventilation May increase amount of water damage Drain on available water supply If freezing, increase in ice on ground Firefighters operating nozzle must remain in heated, contaminated area Operation may be interrupted when nozzle team leaves to replenish air Firefighter I

Building Systems Many modern buildings have built-in HVAC systems Systems can significantly contribute to spread of smoke, fire throughout structure Firefighter I

Building System Operations Usually controlled from panel in maintenance and operations center in the building Wherever located, often diagram of duct system and information on smoke detection, fire suppression systems built into HVAC ductwork (Continued) Firefighter I

DISCUSSION QUESTION Who should operate building systems to assist in ventilation? Firefighter I

Building System Operations Systems designed to shut HVAC system down automatically when smoke/fire detected in ducts Firefighter I

Fire Personnel Should be familiar with location, operation of controls allowing them to shut down HVAC system May need to shut HVAC system down during fire; clearing system of smoke, restoring to operation responsibility of building engineer or maintenance superintendent (Continued) Firefighter I

Fire Personnel Should check combustibles adjacent to ductwork for fire extension due to conduction Firefighter I

Smoke Control Systems Many other buildings equipped with built-in smoke control systems Designed to confine fire to as small an area as possible Achieve confinement by automatic closure of doors, partitions, windows, fire dampers (Continued) Firefighter I

Smoke Control Systems Usually have system diagram in same location as control panel; panel should indicate where alarm originated, which automatic closers activated Firefighter I