Ensemble activities in COSMO C. Marsigli, A. Montani, T. Paccagnella ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.

Slides:



Advertisements
Similar presentations
1 The COSMO-LEPS ECMWF since June 2004 d-1 d d+5 d+1d+2 d+4d+3 middle EPS youngest EPS clustering period Cluster Analysis and RM identification.
Advertisements

The COSMO-LEPS system at ECMWF
COSMO-SREPS COSMO Priority Project C. Marsigli, A. Montani and T. Paccagnella ARPA-SIM, Bologna, Italy.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Improving COSMO-LEPS forecasts of extreme events with.
WG7 summary and Science Plan Chiara Marsigli ARPA Emilia-Romagna, SIMC.
A.Montani; The COSMO-LEPS system. COSMO-LEPS: present status and developments Andrea Montani, D. Cesari, C. Marsigli, T. Paccagnella ARPA-SIMC HydroMeteoClimate.
A.Montani; The COSMO-LEPS system. Present status and future plans of the COSMO-LEPS system Andrea Montani, D. Cesari, T. Diomede, C. Marsigli, T. Paccagnella.
The impact of moist singular vectors and ensemble size on predicted storm tracks for the winter storms Lothar and Martin A. Walser 1) M. Arpagaus 1) M.
Short-Range Ensemble Prediction System at INM José A. García-Moya & Carlos Santos SMNT – INM COSMO Meeting Zurich, September 2005.
WWOSC 2014, Aug 16 – 21, Montreal 1 Impact of initial ensemble perturbations provided by convective-scale ensemble data assimilation in the COSMO-DE model.
ISDA 2014, Feb 24 – 28, Munich 1 Impact of ensemble perturbations provided by convective-scale ensemble data assimilation in the COSMO-DE model Florian.
How can LAMEPS * help you to make a better forecast for extreme weather Henrik Feddersen, DMI * LAMEPS =Limited-Area Model Ensemble Prediction.
A. Montani. - COSMO-LEPS for Sochi 2014 Development of a LAM-EPS system for Sochi Winter Olympics Andrea Montani C. Marsigli, T. Paccagnella ARPA-SIMC.
A.Montani; The COSMO-LEPS system: recent developments and plans 2nd Workshop on Short-Range EPS, Bologna, 7-8 April 2005 The COSMO-LEPS system: recent.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Data mining in the joint D- PHASE and COPS archive Mathias.
WORKSHOP ON SHORT-RANGE ENSEMBLE PREDICTION USING LIMITED-AREA MODELS Instituto National de Meteorologia, Madrid, 3-4 October 2002 Limited-Area Ensemble.
Verification of the distributions Chiara Marsigli ARPA-SIM - HydroMeteorological Service of Emilia-Romagna Bologna, Italy.
A.Montani; The COSMO-LEPS system: present status and outlook COSMO meeting, Offenbach, 7-11 September 2009 The COSMO-LEPS system: present status and outlook.
COSMO-SREPS Priority Project C. Marsigli ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
A.Montani; The COSMO-LEPS system. COSMO-LEPS: present status and plans Andrea Montani, C. Marsigli, T. Paccagnella ARPA-SIMC HydroMeteoClimate Regional.
A. Montani. - COSMO-LEPS for Sochi 2014 Development of a LAM-EPS system for Sochi Winter Olympics Andrea Montani C. Marsigli, T. Paccagnella ARPA-SIMC.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG4 Activities Priority project « Advanced interpretation.
COSMO WG4 Actvities Concentrated mainly on COSMO LEPS  presentation by Andrea Montani The rest of the activities have been absorbed into the advanced.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Cost Efficient Use of COSMO-LEPS Reforecasts Felix Fundel,
Short-Range Ensemble Prediction System at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings Ljubljana, October 2005.
13th EMS Annual Meeting & 11th European Conference on Applications of Meteorology (ECAM) | 09 – 13 Sep.2013 | Reading, United Kingdom ASI – AS19 Interfacing.
Interoperability at INM Experience with the SREPS system J. A. García-Moya NWP – Spanish Met Service INM SRNWP Interoperability Workshop ECMWF –
Plans for Short-Range Ensemble Forecast at INM José A. García-Moya SMNT – INM Workshop on Short Range Ensemble Forecast Madrid, October,
A.Montani; The COSMO-LEPS system. COSMO-LEPS and COSMO-S14-EPS: what is old, what is new. Andrea Montani, C. Marsigli, T. Paccagnella ARPA-SIMC HydroMeteoClimate.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 4 activities.
Development of a LAM ensemble for the 2014 Winter Olympic Games Andrea Montani, C. Marsigli, T. Paccagnella ARPA Emilia-Romagna Servizio IdroMeteoClima,
SREPS Priority Project COSMO General Meeting Cracov 2008 SREPS Priority Project: final report C. Marsigli, A. Montani, T. Paccagnella ARPA-SIM - HydroMeteorological.
NWP Activities at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings Ljubljana, October 2005.
A.Montani; Performance of the COSMO-LEPS system during DOP COSMO meeting - Cracow September 2008 Performance of the COSMO-LEPS system during D-PHASE.
A.Montani; COSMO-LEPS status, verification, … X COSMO meeting - Cracow September 2008 COSMO LEPS system: status, verification, applications Andrea.
A.Montani; The COSMO-LEPS system. Recent developments and plans for the COSMO-LEPS system Andrea Montani, C. Marsigli, T. Paccagnella ARPA-SIMC HydroMeteoClimate.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG4 activities Пьер Экер MeteoSwiss, Geneva.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss A more reliable COSMO-LEPS F. Fundel, A. Walser, M. A.
SREPS Priority Project: final report C. Marsigli, A. Montani, T. Paccagnella ARPA-SIMC - HydroMeteorological Service of Emilia- Romagna, Bologna, Italy.
Activities of the new WG7 Chiara Marsigli. WP Development of COSMO-LEPS Maintenance and updates of the operational suite at ECMWF (A. Montani) Study,
Langen, September 2003 COSMO-LEPS objective verification Chiara Marsigli, Francesco Boccanera, Andrea Montani, Fabrizio Nerozzi, Tiziana Paccagnella.
Short Range Ensemble Prediction System Verification over Greece Petroula Louka, Flora Gofa Hellenic National Meteorological Service.
CONSENS Priority Project Status report COSMO year 2009/2010 Involved scientists: Chiara Marsigli, Andrea Montani, Tiziana Paccagnella, Tommaso Diomede.
Deutscher Wetterdienst Preliminary evaluation and verification of the pre-operational COSMO-DE Ensemble Prediction System Susanne Theis Christoph Gebhardt,
Performance of COSMO-LEPS over the Alpine region Chiara Marsigli, Andrea Montani, Fabrizio Nerozzi, Tiziana Paccagnella ARPA-SMR, Bologna, Italy ICAM/MAP.
Short-Range Ensemble Prediction System at INM García-Moya, J.A., Santos, C., Escribà, P.A., Santos, D., Callado, A., Simarro, J. (NWPD, INM, SPAIN) 2nd.
PP CONSENS Merging COSMO-LEPS and COSMO- SREPS for the short-range Chiara Marsigli, Tiziana Paccagnella, Andrea Montani ARPA-SIMC, Bologna, Italy.
A study on the spread/error relationship of the COSMO-LEPS ensemble Purpose of the work  The spread-error spatial relationship is good, especially after.
10th COSMO General Meeting, Cracow, Poland Verification of COSMOGR Over Greece 10 th COSMO General Meeting Cracow, Poland.
CONSENS Priority Project Status report COSMO year 2009/2010 Involved scientists: Chiara Marsigli, Andrea Montani, Tiziana Paccagnella, Tommaso Diomede.
Status of the NWP-System & based on COSMO managed by ARPA-SIM COSMO I77 kmBCs from IFSNudgingCINECA COSMO I22.8 kmBCs from COSMO I7 Interpolated from COSMO.
CONSENS Priority Project Status report COSMO year 2008/2009 Involved scientists: Chiara Marsigli, Andrea Montani, Tiziana Paccagnella, Tommaso Diomede.
A.Montani; The COSMO-LEPS system: 5-year milestone COSMO meeting, Athens, September 2007 The COSMO-LEPS system: getting close to the 5-year milestone.
WG4 Oct 2006 – Sep 2007 plans COSMO General Meeting, 21 September 2006 Pierre Eckert.
A.Montani; The COSMO-LEPS suite at ECMWF: present status and developments COSMO meeting, Zurich, September 2005 The COSMO-LEPS suite at ECMWF: present.
Eidgenössisches Departement des Innern EDI Bundesamt für Meteorologie und Klimatologie MeteoSchweiz Ensemble activites and plans at MeteoSwiss André Walser.
LEPS VERIFICATION ON MAP CASES
André Walser MeteoSwiss, Zurich
A.Montani; The COSMO-LEPS system.
COSMO-LEPS verification
COSMO-DE-EPS Susanne Theis, Christoph Gebhardt, Michael Buchhold,
Verification of COSMO-LEPS and coupling with a hydrologic model
The COSMO-LEPS cloud problem over the Alpine region
COSMO-LEPS Verification
Preliminary test for the development of a 2.8km ensemble over Italy
The COSMO-LEPS system: present status and outlook Andrea Montani, Chiara Marsigli and Tiziana Paccagnella ARPA-SIM Hydrometeorological service of Emilia-Romagna,
Christoph Gebhardt, Zied Ben Bouallègue, Michael Buchhold
SRNWP-PEPS COSMO General Meeting September 2005
New PP: Consolidation of COSMO ensemble (CONSENS)
Short Range Ensemble Prediction System Verification over Greece
Presentation transcript:

Ensemble activities in COSMO C. Marsigli, A. Montani, T. Paccagnella ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy

Outline  COSMO-LEPS -> early medium range  5 year verification  re-forecasting (MeteoSwiss)  COSMO-SREPS -> short-range  error vs spread  role of the different perturbations  verification (HNMS, Greece)  future plans

The COSMO-LEPS ECMWF d-1 dd+5 d+1d+2 d+4d+3 older EPS younger EPS clustering period Cluster Analysis and RM identification 4 variables Z U V Q 3 levels hPa 2 time steps Cluster Analysis and RM identification European area Complete Linkage 16 Representative Members driving the 16 COSMO-model integrations (weighted according to the cluster populations) employing either Tiedtke or Kain- Fristch convection scheme (randomly choosen) COSMO- LEPS clustering area suite running as a ”time-critical application” managed by ARPA- SIM; Δx ~ 10 km; 40 ML; COSM0-LM 3.20 since Nov06; fc length: 132h; Computer time (4.3 million BU for 2007) provided by the COSMO partners which are ECMWF member states. COSMO- LEPS Integration Domain

5 year verification synop data - low density variable:12h cumulated precip (18-06, UTC); period:from Dec 2002 to Aug 2007; PHASE region:43-50N, 2-18E (MAP D-PHASE area); method:nearest grid point; no-weighted fcst; obs: synop reports (about 470 stations x day); fcst ranges: 6-18h, 18-30h, …, h, h; thresholds: 1, 5, 10, 15, 25, 50 mm/12h; both monthly and seasonal scores are computed. work is in progress for verification over the full domain (1500 stations)

Time series of Brier Skill Score fc. range 30-42h Jun04: 5m  10m Feb06: 10m  16m; 32ML  40 ML

Time series of Brier Skill Score fc. range 78-90h Jun04: 5m  10m Feb06: 10m  16m; 32ML  40 ML

Time series of ROC area Jun04: 5m  10m Feb06: 10m  16m; 32ML  40 ML fc. range 30-42h

Time series of ROC area Jun04: 5m  10m Feb06: 10m  16m; 32ML  40 ML fc. range 78-90h

Outliers: time series Jun04: 5m  10m Feb06: 10m  16m; 32ML  40 ML Theoretical value

COSMO-LEPS summer over the years

Comparison with EPS average maximum 95 th percentile MAM 2006 boxes

Comparison with EPS average maximum 95 th percentile h MAM 2006 boxes h

COSMO-LEPS Climatology Setup Reforecasts over a period of 30 years ( ) Deterministic run of COSMO-LEPS (1 member) (convective scheme = tiedtke) ERA40 Reanalysis as Initial/Boundary 42h lead time, 12:00 Initial time Calculated on hpce at ECMWF Archived on Mars at ECMWF (surf (30 parameters), 4 plev (8 parameters); 3h step) Post processing at CSCS Limitations Reforecasts with lead time of 42h are used to calibrate forecasts of up to 132h Only one convection scheme (COSMO-LEPS uses 2) New climatology needed with each model version change Building a climatology is slow and costly Currently only a monthly subset of the climatology is used for calibration (warning indices need to be interpreted with respect to the actual month) F. Fundel, A. Walser, M. Liniger, C. Appenzeller

Approach: fit a distribution function to the model climate (e.g. Gamma for precipitation) find the return levels according to a given return period find the number of forecasts exceeding the return level of a given return period Return Periods COSMO-PRP 2 PRP 1 = Event that happens once per September PRP 100 = Event that happens in one out of 100 Septembers Probability of Return Period exceedance F. Fundel, A. Walser, M. Liniger, C. Appenzeller

limited-area model error: schemes, parameters, surface forcings COSMO-SREPS  i.c. and b.c. perturbations -> INM multi-model multi- boundary (SREPS)  model perturbations -> parameter perturbation (fixed value throughout the integration to test the impact of the different parameter perturbations) LAM ensemble driving model error analysis error at the global model scale larger scale errors smaller scale errors

System set-up 16 COSMO runs 10 km hor. res. 40 vertical levels COSMO at 25 km on IFS IFS – ECMWF global by INM Spain COSMO at 25 km on GME GME – DWD global COSMO at 25 km on UM UM – UKMO global COSMO at 25 km on NCEP AVN – NCEP global P1: control (ope) P2: conv. scheme (KF) P3: tur_len=1000 P4: pat_len=10000

System applications  COSMO Priority Project -> Short-Range Ensemble  1D-Var DA of satellite data to provide retrievals to be nudged within 7km COSMO-I7: test of the use of COSMO-SREPS to estimate a flow-dependent B matrix  COSMO-SREPS provides boundary conditions for COSMO-DE-EPS, the 2.8 km ensemble system under development at DWD

Relationship between error and spread 12UTC runs Northern Italy observations Nearest grid point

intra-group distance 14 days (00UTC runs) 2mT whole domain

Daily precipitation - ROC area Northern Italy + Switzerland observations Average over 0.5 x 0.5 deg boxes - +42h fc range

Ensemble member verification Precipitation – mm / 6h IFS GME UKMO NCEP F. Gofa, P. Louka

Ensemble member verification Precipitation – mm / 6h Tiedtke, pat_len500 Kain-Fritsch, pat_len500 Tiedtke, tur_len1000, pat_len500 Tiedtke, pat_len10000 F. Gofa, P. Louka

On-going activities  COSMO-SREPS is running for the whole DOP MAP D- PHASE (6 months, June-November 2007)  test of different parameters (16 runs using only the IFS initial and boundary conditions): 3 month run IFS – ECMWF global P1: control (ope) P2: conv. scheme (KF) P3: parameter 1 P4: parameter 2 P5: …

Future plans  test perturbed parameters within COSMO-LEPS  possibility of using soil parameters from DWD  evaluate the benefit of a system calibration  MAP D-PHASE period runs:  statistical evaluation of the COSMO-SREPS system  verification  selection of the new parameters for COSMO-SREPS MAP D-PHASE: ensemble intercomparison!!!