W504 Risk assessment of asbestos containing materials.

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHMs commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

Potential sources of asbestos in buildings
Managing the Health and Safety of Contractors
Ed Antz, Risk Manager Maine School Management Association
Duty to Manage Asbestos (an Inspectors View) David Price HM Inspector of H&S HSE Birmingham Office.
Background Presenters Work done in preparation for WHS changes
1. DHEC Disturbance of ACBM during renovations and demolitions Focus on environmental impact OSHA Disturbance of ACM during renovations, demolition, maintenance.
Ann Arbor Housing Commission Tenant Asbestos Awareness Presentation Kary S. Amin Nova Environmental, Inc.
ASBESTOS AWARENESS Introduction - ASBESTOS WHAT IS IT? ASBESTOS IS A FIBROUS MATERIAL IT OCCURS NATURALLY IN MANY PARTS OF THE WORLD. 3 MAIN TYPES CHRYSOTILE.
Asbestos Awareness Training
BASIC PRINCIPLES IN OCCUPATIONAL HYGIENE Day ASBESTOS.
ASBESTOS Awareness for Operations and Maintenance
“Duty to Manage” Steve Shutler BSc(Hons), MCIEH, CMIOSH, CCP(Asbestos) Director SB Asbestos Management Ltd.
ASBESTOS AWARENESS Presented by the Office of Environmental Health and Safety Presented by the Office of Environmental Health and Safety.
Hansen – Managing Safely Presentation by C. Wales Health and Safety Advisor Fenlock-Hansen Ltd ASBESTOS.
H&S Asbestos Regulations the Basics Phil Bloomer MSc BSc PGCE Phil Bloomer MSc BSc PGCE Internal Training Manager Internal Training Manager.
ASBESTOS AWARENESS. THREE OSHA REGULATIONS PERTAIN TO PONTENTIAL WORKPLACE EXPOSURES TO ASBESTOS 29 CFR –Applies to construction, demolition,
Asbestos Awareness Developed by:
Designing Scoring Rubrics. What is a Rubric? Guidelines by which a product is judged Guidelines by which a product is judged Explain the standards for.
Identifying Asbestos. Aim The aim of this Training Tool is to provide you with the following information to ensure the safety of your workforce:  What.
W504 Asbestos product types, uses in buildings and surveys
Asbestos. Asbestos is the single greatest cause of work-related deaths in the UK. When these fibres are inhaled they can cause serious diseases which.
Asbestos Legislation Steve Shutler BSc(Hons), MCIEH, CMIOSH, CCP(Asbestos) Director SB Asbestos Management Ltd.
1 ASBESTOS AWARENESS East Carolina University ASBESTOS AWARENESS Presented by the Office of Environmental Health and Safety.
Now is this a high risk job?. HIGH RISK JOBS – RED CODE WORKING WITH ASBESTOS, OR UNDERTAKING A JOB WHERE THERE IS A LIKELIHOOD THAT ASBESTOS IS PRESENT.
Asbestos awareness for Craftsman Presented by Bob Miller & Andrew Knight.
Asbestos Awareness Training Miller Pipeline Corporation.
Asbestos: a few things that you might not have heard and some that you may already know a few things that you might not have heard and some that you may.
Asbestos Exposure Presentation Presented by: Todd & Cue Ltd © 2006, 2012 Zywave, Inc. All rights reserved.
W504 - Asbestos – personal protective equipment. Respiratory protection Exposure to asbestos should be prevented or reduced as far as reasonably practicable.
John Raper Consultant Forensic Scientist Understanding Your Client’s Evidence asbestos products v asbestos-free substitute products SARAG – South Yorkshire.
Asbestos Management Retail Sector Forum 11 th March 2004.
W504 - Management of asbestos containing materials.
1 Dr. Sean Mahar. 2 Aims and objectives of the event Aim: to provide detailed information and guidance about the introduction of a new duty to manage.
BAXI HEATING UK. Aims and objectives of the event Aim: to provide detailed information and guidance about the duty to manage asbestos in non-domestic.
ASBESTOS RISK MANAGEMENT. u Asbestos. u The health risk. u In buildings. u Background to regulation. u Outline of duty to manage. u Review of consultation.
Asbestos Awareness Training Miller Pipeline Corporation.
A Two Hour Introductory Course Rowan University Environmental Health and Safety X 5105
ASBESTOS OVERVIEW.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
0 October 2010 Occupational Health Department Asbestos Awareness (OEMP005) Occupational Health Department NOTE: Detailed speakers notes included to support.
Asbestos at Finnish workplace Senior engineer Erkki Sundquist Ministry of Social Affairs and Health.
Asbestos. © Business & Legal Reports, Inc What Is Asbestos? Group of natural minerals Still mined in some countries Long, thin, and strong fibrous.
The Hidden Killer The Hidden Killer Developed and presented by the CWU Safety team Asbestos.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Risk Assessment and Management. Objective To enable an organisation mission accomplishment, by better securing the IT systems that store, process, or.
14,210 school built between Many others refurbished > 86% of 28,950 schools contain asbestos.
Distribution Integrity Management – What To Expect John Erickson, PE American Public Gas Association Western Regional Gas Conference.
A European campaign on Risk Assessment Common errors in Risk Assessment.
NEW YORK MEDICAL COLLEGE Environmental Health and Safety Department
1 Performance Auditing ICAS & IRAS Officers NAAA 21 Jan 2016.
Asbestos Awareness & Safety Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) 1PPT
Asbestos Asbestos Awareness. Asbestos is a naturally occurring mineral that once was lauded for its versatility, recognized for its heat resistance, tensile.
ASBESTOS AWARENESS Quentin Baker Director of Safety
INFORMATION ABOUT ASBESTOS EDMS No General, 2.Materials, 3.Risks, 4.Effects on health, 5.Prevention at CERN, 6.Work management, 7.Your role as.
January 2015 NAT WOODSIDE.
1 Chapter 2 Asbestos-Containing Materials 2014 Asbestos NESHAP Inspection and Safety Procedures Course.
14,210 school built between Many others refurbished > 86% of 28,950 schools contain asbestos.
BASIC PRINCIPLES IN OCCUPATIONAL HYGIENE
Ranjan kumar Assistant Manager CCL,Ranchi
Asbestos: Future Initiatives
School District No. 20 Asbestos Awareness Seminar
Risk management - HIRAC awareness presentation
Asbestos.
Potential sources of asbestos in buildings
Asbestos Awareness Bradford Area Occupational Health and Safety Forum
INFORMATION ABOUT ASBESTOS
Basic Strategy to a Successful AHERA Inspection
ASBESTOS AWARENESS.
What are the basics of Pest Inspections? PEST INSPECTIONS ADELAIDE.
Presentation transcript:

W504 Risk assessment of asbestos containing materials

Risk assessment of ACMs When asbestos containing materials are identified (or presumed to be present) an assessment of the risk they pose should be undertaken to Help decide what action is appropriate to deal with the asbestos containing materials Help decide which materials should be dealt with first Risk is dependent on how easily the asbestos containing material can release fibres whether the material is likely to be disturbed and whether people are likely to be exposed to the fibres A number of different risk assessment systems have been developed to take these factors into account

Flow charts (e.g. HSG 227) Based on series of flow charts or decision trees leading to a conclusion or action that should be undertaken to deal with an ACM These systems lead to consistent outcomes Flow charts generally more useful in developing control strategies than as a risk assessment system Generally not very good at prioritising which materials should be dealt with first

Risk assessment systems – Australia (NOHSC 2018) Provides a list of factors to take into account when undertaking the risk assessment of an asbestos containing material including Condition of material (friable, bonded) Whether they are liable to damage or deterioration Whether nature or location of any work to be carried out is likely to disturb the material Results from air monitoring

Risk assessment systems – Australia (NOHSC 2018) Does not provide guidance on the relative weighting that the various factors should be given Relies on the competence of the person undertaking the risk assessment to take various factors into account Tends to be incorporated into general risk assessment systems

Risk assessment system (UK) – Algorithms (HSG 264 and HSG 227) Algorithms are numerical ways of taking into account several factors by giving each factor a score Scores added to give an overall score Individual judgement is still required so the process is not exact Assessment process is transparent so that it can be checked for any discrepancies at a later date

Risk assessment system (UK) – Algorithms (HSG 264 and HSG 227) HSE Guidance identifies two areas as Material assessment - Ability to release airborne fibres Documented in HSG 264 Commonly used by many organisations in UK Completed as part of the survey Priority assessment - Human risk factors - needs detailed employer/premises manager input Documented in HSG 227 Less widely used - many organisations have developed own systems More difficult to complete as part of the on-site survey

Risk assessment system (UK) – Algorithms (HSG 264 and HSG 227) Material risk assessment (potential of the asbestos containing material to release fibres) takes into account Product type Surface treatment Extent of damage/deterioration Asbestos type

Material Assessment Algorithm Product type (full list in HSG 264 Appendix 4) Score 3 Thermal insulation, sprayed asbestos, loose insulation etc Score 2Insulation boards, millboards, textiles, gaskets, ropes etc Score 1Asbestos cement, decorative coatings, composite materials (plastics, resins, roofing felt, vinyl floor tiles) etc

Material Assessment Algorithm Surface treatment (full list in MDHS 264 Appendix 4) Score 3 Unsealed thermal insulation, sprayed asbestos, loose insulation etc Score 2Unsealed Insulation boards etc Sealed thermal insulation, sprayed coatings Score 1Unsealed Asbestos cement Sealed Insulation boards etc Score 0Composite materials (plastics, resins, vinyl floor tiles etc)

Material Assessment Algorithm Damage and deterioration (full list in MDHS 264 Appendix 4) Score 3 High damage or delamination, visible asbestos debris Score 2Medium damage, significant breakage or several small areas of damage revealing asbestos fibres Score 1Low damage, a few scratches or surface marks, a few broken edges on boards, tiles etc Score 0No visible damage

Material Assessment Algorithm Asbestos type Score 3 Crocidolite Score 2Amphibole asbestos excluding crocidolite Score 1Chrysotile

Material Assessment Algorithm Additive score between 2 & high risk 7-9 medium risk 5-6low risk < 4very low risk

Priority risk assessment - HSG 227 Potential for people to be exposed to asbestos Note - criteria can be adapted to site circumstances Four areas identified for assessment Occupant activity Likelihood of disturbance Human exposure potential Maintenance activity Each of the four areas are sub-divided Each sub-division is given a score and the average for each area is calculated

Priority risk assessment - HSG 227 Occupant activity Primary activity Score 3 - High disturbance - e.g. door with AIB panel in constant use Score 2 - Medium disturbance - e.g. industrial activity that may contact ACM’s Score 1 - Low disturbance - e.g. office type activities Score 0 - Rare disturbance - e.g. little used store room Secondary activity - consider above criteria

Priority risk assessment - HSG 227 Likelihood of disturbance 3 sub-divided categories Location Accessibility Extent / amount Location Score 3 - Confined spaces Score 2 - Room up to 100 m 2 Score 1 - Large rooms or well ventilated areas Score 0 - External

Priority risk assessment - HSG 227 Likelihood of disturbance (continued) Accessibility Score 3 - Routinely disturbed Score 2 - Easily disturbed Score 1 - Occasionally likely to be disturbed Score 0 - Usually inaccessible or unlikely to be disturbed Extent / Amount Score 3 - > 50 m 2 or > 50 m pipe run Score m 2 or m pipe run Score 1 - < 10 m 2 or < 10 m pipe run Score 0 - Small amounts or items e.g. gaskets

Priority risk assessment - HSG 227 Human exposure potential 3 sub-divided categories Number of occupants Frequency of use of area Average time area is in use Number of occupants Score 3 - > 10 Score to 10 Score to 3 Score 0 - None

Priority risk assessment - HSG 227 Human exposure potential (continued) Frequency of use of area Score 3 - Daily Score 2 - Weekly Score 1 - Monthly Score 0 - Infrequent Average time area is in use Score 3 - > 6 hours Score hours Score hours Score 0 - < 1 hour

Priority risk assessment - HSG 227 Maintenance activity 2 sub-divided categories Frequency of maintenance activity Type of maintenance activity Frequency of maintenance activity Score 3 - More than once per month Score 2 - More than once per year Score 1 - Once per year or less frequently Score 0 - ACM unlikely to be disturbed

Priority risk assessment - HSG 227 Maintenance activity Type of maintenance activity Score 3 - High levels of disturbance e.g. moving a number of ceiling tiles for re-cabling Score 2 - Medium disturbance e.g. lifting a few ceiling tiles to access a valve Score 1 - Low disturbance e.g. changing light bulbs adjacent to asbestos insulation board ceiling Score 0 - Minor disturbance e.g. possibility of contact when gaining access

Overall Risk Assessment (MDHS 100 and HSG 227) Overall risk rating derived by adding the material risk assessment and the priority risk assessment Notes No official guidance to the significance of the total risk rating number - many organisations have developed in- house categories for subsequent action plans Some of the criteria used are subjective - so it is not an exact science Gives useful information on relative risk - but should not drive management actions purely based on numbers Can be used to demonstrate reduction in risk

Risk assessment system (USA) – Environmental Protection Agency (EPA) EPA document gives guidance on assessing need for abatement, determining its timing and choosing an abatement method It considers three types of material Surfacing materials Pipe and boiler insulation Other materials It assumes asbestos containing materials are included in a management programme Likelihood of fibre release determines the need and timing of additional action Nature and location of the asbestos containing material determines the abatement method

Risk assessment system (USA) – Environmental Protection Agency (EPA) Factors taken into account when assessing potential fibre release Current condition of asbestos containing material Evidence of deterioration or delamination Evidence of physical damage Evidence of water damage Potential for future disturbance, damage or erosion Proximity to air plenum or direct airstream Visibility, accessibility and degree of activity Change in building use Guidance given on each of the categories and simple ratings such as ‘present’, ‘absent’, ‘high’ or ‘low’ given. Numerical values are not given to each factor.

Risk assessment systems Whatever risk assessment system is used a number of general principles apply They should be appropriate for, and adapted if necessary for the specific situation of the organisation They should be undertaken by persons who are competent and have sufficient training They should be reviewed regularly in accordance with any National legislative requirements and whenever there have been significant changes