City Square-Retail Assessment of Traffic Impacts Presented to City of Miami Commission September 7, 2006.

Slides:



Advertisements
Similar presentations
Tysons Corner Consolidated Transportation Impact Analyses (CTIAs)
Advertisements

Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
Traffic Impact Study “Study to evaluate the impact on a roadway network due to a proposed development”
Roundabout Level of Service and Delay and Comparison to Other Intersection Types Roundabout Level of Service and Delay and Comparison to Other Intersection.
2007 Intermodal Operations Planning Workshop Bus Stop & Bus Lane Capacity: Planning Bus Routes in Downtown Seattle Owen Kehoe, PE, PTOE Transportation.
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
T3 Webinar September 2012 Performance Measures Edward J. Smaglik September 18 th, 2012.
Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project November 29, 2007 SIERRA POINT BIOTECH PROJECT.
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
The State Route 246 Central Avenue Ext. and Purisima Road Traffic Study May 2008.
Simpson County Travel Demand Model July 22, 2003.
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection Improvement Plans January 17, 2012.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Junction Modelling in a Strategic Transport Model Wee Liang Lim Henry Le Land Transport Authority, Singapore.
Lec 28: Ch3.(T&LD): Traffic Analysis – Traffic assignment Learn how to assign generated and distributed trips to the street system approaching the site.
TransCAD Network Settings 2017/4/17.
Mario Fiorillo – Transportation – Civil Mario Fiorillo Present work experience Florida If you have any questions please me at
Humber Bridge Review Results from the HUMBER ESTUARY TRANSPORT MODEL.
Cherry Creek North and Country Club Historic RNOs and TDA Colorado Cherry Creek North BID Cumulative Traffic Study.
Science Technology & Experimentation CONFERENCE 2011.
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Evaluating Robustness of Signal Timings for Conditions of Varying Traffic Flows 2013 Mid-Continent Transportation Research Symposium – August 16, 2013.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Trip Generation for Street and Highways Lecture 14 CE 4720 Norman Garrick.
Assessment of Urban Transportation Networks by integrating Transportation Planning and Operational Methods /Tools Presentation by: Sabbir Saiyed, P.Eng.
2007 TRB Planning Application Conference D ELDOT S TATEWIDE E VACUATION M ODEL.
Orem City Roundabout Feasibility Study Brigham Young University and the City of Orem Determination of available land Roundabout parameters established.
South Parkway Refinement Plan F Context of the plan F Goals of the plan F Major issues F Parkway/Third Street alternatives F City of Bend, ODOT assess.
Travel Speed Study of Urban Streets Using GPS &GIS Tom E. Sellsted City of Yakima, Washington Information Systems and Traffic.
City Square-Parcel 3 Assessment of Traffic Impacts Presented to City of Miami Commission July 27, 2006.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Development of A Traffic Monitoring Program Using Emme 3 Based on A San Joaquin COG Travel Demand Model Jia Hao Wu, Ph.D., Joy Bhattacharya, P.E. and Chris.
Planning & Community Development Department 1336 and 1347 East Colorado Blvd. Pre Development Plan Review City Council Meeting January 28, 2013.
Company LOGO Traffic Impact Study Case: Al-Irsal Center Project in Al-Bireh City Under the Supervision of: Pro.Sameer A. Abu-Eisheh Prepared by: Mohammad.
Incorporating Traffic Operations into Demand Forecasting Model Daniel Ghile, Stephen Gardner 22 nd international EMME Users’ Conference, Portland September.
Challenges in Using Paramics in a Secondary Plan Study – Case Study of Downsview, Toronto Paramics Users Group Meeting October 5, 2009.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
July 4 th Operation Fast Forward Safarian, Kaz, PM.
Portland State University 11 By Maisha Mahmud Li Huan Evaluation Of SCATS Adaptive Traffic Signal Control System.
Problem 1: Determination of Facility Types for Analysis.
Evaluation and Redesign of Rojeeb Street. Objectives ▪ Evaluation of existing conditions of Rojeeb Street. ▪ Estimation of future conditions of Rojeeb.
Introduction Study area Existing problem Objective Methodology Results and Conclusions Recommendations.
Lec 27: Ch3.(T&LD): Traffic Analysis – Directional distribution of site traffic Notice the difference in the trip distribution process between urban transportation.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Engineering Study Griffin View Drive & Harbor Hills Blvd. Prepared for Lake County Public Works Engineering 437 Ardice Avenue Eustis, Florida Purchase.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project December 13, 2007 SIERRA POINT BIOTECH PROJECT.
Setup Project Folder Start Acquire Data QAQC Data Extract “Pasadena” and “South Pasadena” City Boundaries “Pasadena” Cities Clip all other data set to.
Problem 6: Route 146 Arterial Study We’re going to look at 7 intersections simultaneously: the Shenendehowa Campus entrance, Moe Road, Maxwell Drive, Clifton.
High way and Transportation I(DIS) ECIV 4333  Instructor : Dr. Essam Almasri  Assistants : Eng.Mustafa abou foul.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
1 27 University Traffic Impact Analysis Pre-bidders Conference RFP No January 29, 2013.
Visit Our Website at: Click to edit Master title style.
USDOT TIGER Grant Program Tower Road Complete Street Reconstruction.
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
2017 Little River Clean-up & Serenade
Grey County Transportation Master Plan
Tasnim Rabee’ Nagham Dmaidi
Mrs Lebogang Mogakabe M Tech (Student): Civil Engineering 10 July 2018
FREEWAY MANAGEMENT SYSTEMS:
Broward County Congestion Assessment
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

City Square-Retail Assessment of Traffic Impacts Presented to City of Miami Commission September 7, 2006

Background The purpose of this study is to assess the traffic impacts of the City Square-Retail development on the surrounding street network. The study area defined for this analysis is bound by NE 15 th Street on the north, NE 13 th Street to the south, Herald Plaza to the east, and Biscayne Blvd. to the west.

Study Area Biscayne Boulevard NE 13 th Street NE 14 th Street NE 15 th Street N. Bayshore Drive Herald Plaza

Methodology Data Collection –4-hour turning movement counts obtained from previous studies submitted to the City. Trip Generation –Institute of Transportation Engineer’s, Trip Generation Report, 7 th Edition. Trip Distribution –Cardinal distribution of each traffic analysis zone (TAZ). Level of Service –Highway Capacity Manual, 2000 Edition.

Project Number Project Name 1Marina Blue (824 Biscayne Blvd.) 2900 Biscayne Blvd. 3Marquis (1100 Biscayne Blvd.) 4Marquis West (111 NE 11 Street) 5Herald Plaza (Parcel 3) 6Herald Plaza (Parcel 1) & 1490 Biscayne Blvd. Project Number Project Name 8The Chelsea (1550 Biscayne Blvd) Biscayne Blvd. 10Portico (1837 NE 4th Ave.) 11Opera Tower (1744 N. Bayshore Dr.) 12Quantum (1900 N. Bayshore Dr.) 13Hotel De L' Opera ( NE 4th Ave.) Club (1800 North Bayshore Dr.) Biscayne Blvd. NE 2 nd Ave. 9

Area Projects Project Name PM Peak Hour Trips InOutTOTAL Trips Marina Blue (824 Biscayne Blvd.) Biscayne Blvd Marquis (1100 Biscayne Blvd.) Marquis West (111 NE 11 Street) City Square (East & West Parcels) Herald Plaza (Parcel 1) & 1490 Biscayne Blvd The Chelsea (1550 Biscayne Blvd) Biscayne Blvd Portico (1837 NE 4th Ave.) Opera Tower (1744 N. Bayshore Dr.) Quantum (1900 N. Bayshore Dr.) Hotel De L' Opera ( NE 4th Ave.) Club (1800 N. Bayshore Dr.) Total Trip Generation

Results Signalized Intersection IntApproach LOSApproach Delay (s/veh) LOSEBWBNBSBEBWBNBSB Biscayne BoulevardatNE 13 StC-FBB Biscayne BoulevardatNE 14 StBDEBA Biscayne BoulevardatNE 15 StDDDCD N. Bayshore DriveatNE 13 StB-B-B N. Bayshore DriveatNE 14 StBCCBB N. Bayshore DriveatNE 15 StCCBCC Existing Level of Service

Results Signalized Intersection IntApproach LOSApproach Delay (s/veh) LOSEBWBNBSBEBWBNBSB Biscayne BoulevardatNE 13 StF-FFC Biscayne BoulevardatNE 14 StFFFFC178.7> Biscayne BoulevardatNE 15 StFFFFF N. Bayshore DriveatNE 13 StC-B-D N. Bayshore DriveatNE 14 StFFCBC> N. Bayshore DriveatNE 15 StDFCEC Future (2010) Level of Service

Study Area F F FF

Traffic Simulation (2010)

Conclusions The results indicate level of service F at the following intersections: –Biscayne Boulevard at NE 13 th Street –Biscayne Boulevard at NE 14 th Street –Biscayne Boulevard at NE 15 th Street –N. Bayshore Drive at NE 14 th Street Significant impacts to the surrounding street network.