Things to look for and remember while preparing FD05 Estimates.

Slides:



Advertisements
Similar presentations
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Advertisements

Presented by: Mike Sisson February 23, It is the Law The Americans with Disabilities Act of It is the Right Thing to do Provide Equal Access.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Back to the Future? Electrical/Lighting Contracts Ted Swansegar.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Installation of Loops on resurfacing projects through maintenance Ted Swansegar
Section Cross Slope District 1 Your logo here.
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 15 Publication No. FHWA-HRT Bicycle Lanes.
The Health Insurance Portability and Accountability Act of 1996– charged the Department of Health and Human Services (DHHS) with creating health information.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
May 2014 Operations Planning Construction Design VISION Process 1.Receive design files from Projectwise -Create Maps to determine ownership and maintenance.
Getting Caltrans to Approve Your Plans Basic Drainage Policies and Requirements Roy H. King, MS,PE California Department of Transportation Division of.
March 2014 Water Resource Permitting Purpose & Need.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Mississippi DOT Roadsides, Drainage & Vegetation Management Standards.
1 Starting a Project – Looking for footpaths or pushed down ROW fences Plan for your pedestrians or they will be walking through your project on the edge.
Work Zone Safety It Starts With YOU!!. 2 BOOK 7 What is NEW??? IMSA TECHNICAL EXPO October, 2014 Dave Edwards.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Office of Highway Safety Bridge Load Rating Dan Walsh.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Home screen of your online tracker system Updates or notes for your attention are placed at the top in red. This will also inform you of the document turnaround.
Who Wants To Be A Millionaire Driver Ed Version Test #2 Review Questions
Law Office Equipment and Technology Some basic rules.
Old Policy – which no one ever seem to have heard of.
County of Orange County of Orange Enterprise Data Center Board of Supervisors Video Dashboard Upgrade With Windows Media 9.
Presents. Confidentiality Warning Confidentiality Warning: This document (including any attachments) is intended only for the use of the individual or.
Roadway Preservation Intranet Page. Location: Intranet/Roadway-Preservation.aspx.
Things to look for and remember while preparing FD05 Estimates.
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course.
Fixing Common Costing Errors This document s intended only for AX conference attendees and their parent companies, holding a valid AXIS ERP license.
FD05 STATEWIDE RESURFACING PROGRAM OVERVIEW DIANA RADCLIFFE, TEBM, ROADWAY PRESERVATION, DIV OF MAINTENANCE.
1 Leon County Board of County Commissioners MICCOSUKEE ROAD RESURFACIING INTERMITTENT ROAD CLOSURE From North MERIDIAN STREET To DOCTORS DRIVE.
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
Restoring Privacy, Cleaning Your Computer's Cookies and Beacons.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
By Terry Treutel Ride Quality Consultant Former WisDOT Ride Spec Coordinator.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Faxing Labs and Ultrasounds. There may be situations in which a client needs a lab faxed outside of standard office hours or at a MACL near their home,
90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Indiana MUTCD: for Operations & Maintenance Issues/Solutions – Part II.
I-75 Ramp Widening Project Scope of Project – Safety Project to Widen I-75 NB Exit Ramp (Ramp A) and I-75 SB Exit Ramp (Ramp C) at the I-75/US 25W Interchange.
FLORIDA DEPARTMENT OF TRANSPORTATION MAINTENANCE RATING PROGRAM.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
STRONG NEIGHBORHOOD INITIATIVE Public Works Department January 30, 2007 Agenda item 8.01.
Agenda Updates to Driveway and Sidewalk specifications and permits
Interdisciplinary teams Existing or new roadway
ALDOT Pavement Preservation Policy
Traffic Control Plan Development Course
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Longitudinal Joint Construction – Why Straightness Matters
SW Gage Blvd - Street Repair Project
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Walker Street Reconstruction Project 25% Design Public Hearing
WisTMP 2.0 Update Andy Heidtke, PE Statewide Work Zone Design Engineer
KENT COUNTY Safety Edge Projects
ACEC Designer Training
Presentation transcript:

Things to look for and remember while preparing FD05 Estimates

The views expressed during this presentation do not necessarily reflect the views of KYTC. This message is intended only for the use of the individual or entity to which it is addressed and may contain confidential information that is legally privileged and exempt from disclosure under applicable law. If the reader of this message is not the intended recipient, you are notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please notify this office by telephone and return this message to the original sender. Under Kentucky Rule of Evidence 503 this communication is confidential and not intended to be disclosed to third persons other than those to whom disclosure is made in furtherance of the rendition of professional legal services to the client, Kentucky Transportation Cabinet.

Go to the Maintenance Intranet page way-Preservation.aspx Drive the Project

Print out a copy of the estimate sheet and summary sheets (most current version). Make sure you have a measuring wheel. Take your updated Route Log. Has your DMI been calibrated recently?

Measure the width in several locations per mile. Don’t measure in curves, at mailboxes, or at entrances. Note changes in Typical Section.

Is there striping? Centerline, Edgelines, etc. Are there manholes, and who are the owners? Are there pavement markers to be removed? Only replace on Interstates, Parkways, and TWLTL’s Are there bridges or culverts? Check with bridge section.

What types of shoulders are there? Are there drop-off that need correcting Can it be paved monolithic or separate pavement wedge? Is there curb and gutter? Are there any RR Crossings? Are there ADA compliant sidewalk ramps?

Does the project have thermo to be replaced? Include quantities on summary sheets. Are there traffic or planning loops affected? Include quantities on summary sheets. Are there base failures that need repaired? Include quantities on summary sheets.

How do you know if it’s a base failure? Deep cracking Rutting / pumping Water / mud coming out of cracks Usually located near edge of pavement

Used to correct out of section pavement. Correcting cross slopes, dips, etc. Not a Scratch Course. How much do you need?

Ride the project Visual survey Usually calculated as a percentage of surface quantity.

If the route needs more than 50% leveling and wedging, consider milling the entire route. Helps to reduce pavement edge drop-offs. Corrects existing rutting. Re-defines pavement section.

At Bridge ends and RR crossings. Usually 100 feet per 1 inch. Curb and Gutter sections Alternative to leveling and wedging. Make sure milling depth is appropriate.

Check intersections to see if needed. Not for commercial entrances. Include all bid items. Is it technically feasible? If not, include documentation and pictures.

Input project data into estimate program. Check all quantities for errors. Verify pavement type against Warrants. Pavement depth 1.0”, 1.25” or 1.5” (District 1, 2, 3 only or SMA)

Complete typical sections One typical for each pavement section. Use common sense. Show details Pavement type Depth Type of shoulders Milling if required

What type is needed for this project? Will night work or restricted hours be needed? Are there dates where no lane closures will be allowed? Holidays, festivals, etc. Will it be a significant project? Include Public Information Plan. Complete documents for TMP.

Check Wheeler’s “commonly made mistakes” . Did you need flashing arrows or message boards? Did you include Fuel and Asphalt adjustments? Use comments section.

Use Traffic Engineer to help with Thermo and Loop quantities and locations. Check with Permits, Project Development, and HSIP Coordinator for conflicting projects. Check with Bridge section if bridges are on the project. Did you include all applicable notes?

Did you miss anything? See it from a contractor’s view? What will the inspector see? Is there anything unexpected that you may have missed?

Questions???