JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING.

Slides:



Advertisements
Similar presentations
MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers.
Advertisements

US Army Corps of Engineers Philadelphia District Scheduled FY 07 Dredging Work FY 07 Dredging Workin Philadelphia District Philadelphia District.
St. Joseph Harbor FY 2014 Dredging. St. Joseph Harbor Entrance to the Channel (Prior to Dredging) Areas to be dredged 53,000 Cubic Yards to be removed.
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
US Army Corps of Engineers BUILDING STRONG ® PNWA Conference Update COLONEL Jose Aguilar District Commander Portland District 2 October, 2014.
MOBILE DISTRICT DREDGING PROGRAM MOBILE DISTRICT DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA US Army.
U. S. Army Corps Of Engineers Memphis District November 16, 2007.
TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia River Channel Port Sutton Channel TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia.
US Army Corps of Engineers BUILDING STRONG ® JACKSONVILLE DISTRICT COASTAL DAMAGE REDUCTION FLOOD DAMAGE REDUCTION NAVIGATION ECOSYSTEM RESTORATIONREGULATORYINTERAGENCY.
Shell Island West NRDA Restoration
South Atlantic Regional Biological Assessment Update on Status of Re-initation of Consultation under Section 7 of the Endangered Species Act Terri Jordan.
DOT 1 January , 1990 DOT 2 July 23 - August 3, 1990.
Civil Works Baltimore District River and Harbor Projects.
JACKSONVILLE DISTRICT 5 Year NEW WORK DREDGING PROGRAM JACKSONVILLE DISTRICT 5 Year NEW WORK DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD.
PHILADELPHIA DISTRICT 2008 – 2012 DREDGING PROGRAM.
Chubaka Producciones Presenta :.
US Army Corps of Engineers BUILDING STRONG ® Eastern Shore Navigation Partnership Meeting “ A Unified Voice for Navigation, Project Prioritization, and.
U.S. Army Corps of Engineers Savannah Harbor Expansion Project Savannah Harbor Expansion Project.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Chicas, este calendario si es pa' nosotras !!!!!.
NAD/SAD REGIONAL DREDGING MEETING/WEDA WILMINGTON DISTRICT
6/23/11 FAIS,LLC Five Apple/Inpatient Specialist Case Study Patient Volume/LOS/ Payor Source Data.
October FY08-FY12 Dredging Schedule New York District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd.
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
NAD/SAD REGIONAL DREDGING MEETING/WEDA Jacksonville Harbor and Other Developments U. S. ARMY CORPS OF ENGINEERS COASTAL NAVIGATION BRANCH 10 October 2007.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
FLORIDA Unit 2. Panhandle Region North Florida West/Gulf Coast East/Atlant ic Coast South Florida Florida Keys Regions of Florida.
Imagine School at Town Center Achievements 2013 State School of Character 2013 CEP Promising Practices winner 2013 Imagine School’s National.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
US Army Corps of Engineers BUILDING STRONG ® Toke Point Marina Pipeline Maintenance Dredging with Flowlane Disposal at Willapa Harbor, Washington Hiram.
SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCT FY07FY06FY08 Page 1 of 3 FY07 Dredging Schedule New York District Mechanical Dredge Maintenance Dredging Newark.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
C HARLOTTE C OUNTY B EACHES & S HORES A DVISORY C OMMITTEE J ANUARY 7, 2016 C HARLOTTE C OUNTY E ROSION C ONTROL P ROJECT U PDATE.
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Sand Dollars Federal Shore Protection Appropriations
Quick Facts about the FL Intracoastal Waterway Florida ICW (Three federal authorizations AIWW, IWW & OWW) Florida ICW (Three federal authorizations AIWW,
Florida Inland Navigation District (FIND) Capabilities and Potential Assistance for Muck Removal in the Indian River Lagoon (IRL) System.
NEW ENGLAND DISTRICT Operations and Maintenance Projects Maine Dredge Team Meeting October 2015 Ed O’Donnell Chief, Navigation Section.
Strategic shoreline placement from coast to coast
Baltimore.
FY16 Budget Build (Banner)
SCOPING MEETING FOR GULF INTRACOASTAL WATERWAY (GIWW) DREDGE READINESS AND OPERATION PLAN (DROP) GIWW: Caloosahatchee River to Anclote River Laurel.
The Florida Inland Navigation District:
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
Pine cove pit time lapse drone photos
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
2018/2019 School Calendar July August September October November
Due Dates subject to change. Watch for dashboard updates.
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
McDonald’s Kalender 2009.
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
McDonald’s calendar 2007.
Teacher name August phone: Enter text here.
February 2007 Note: Source:.
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA US Army Corps of Engineers Jacksonville District US Army Corps of Engineers Jacksonville District Dan Beasley

Overview of SAJ FY08 Dredging Projects Florida Atlantic Ocean Gulf of Mexico Palm Beach Harbor Jacksonville Harbor & Mayport Naval Base Fernandina Harbor & Kings Bay Submarine Base Canaveral Harbor Manatee Harbor Tampa Harbor Port Sutton IWW Volusia County Captiva Island Beach US Army Corps of Engineers® Jacksonville District Nassau County Shore Protection IWW Jupiter Inlet Horseshoe Cove GIWW – Manatee Co

Fernandina Harbor, Kings Bay Entrance Ch Near shore Disposal Area Ocean Disposal Area

Project: Fernandina Harbor, Kings Bay Entrance Channel Type Work: Maintenance Dredging Depth: 49 feet + 2 allowable overdepth Width: 500 feet Length: Approximately 9 miles Quantity: 715,000 CY Type of Material: Sand and silt Placement Area: Beach/ODMDS Distance to Placement Area: 13 miles Type of Equipment: Hopper Small business Set Aside: No, unrestricted Last Dredged: 2007 Environmental Window: Yes, Dredging Prohibited 1 April – 14 December Reason for window: Sea Turtles FY 08 Funding: Between $1M and $5M Advertisement Date: 7 August 2007 Bid Opening Date: MATOC - To Be Determined Award Date: 3 December 7 Dredging Begins: 15 December 2007 Dredging Complete: 4 March 2008 Days to Dredge: 80 POC: Veronica Taylor, Contracting Specialist Ph:

IWW Vicinity of Volusia County

Project:IWW Vicinity of Volusia County (Middle and North Reaches) Type Work: Maintenance Dredging Depth: 12 Feet + 2 Feet overdepth Width: 125 Feet Length: 15 Miles Quantity: 1,100,000 CY Type of Material: Sand Placement Area: Nearshore Distance to Placement Area: 2 miles Type of Equipment: Cuttersuction Small business Set Aside: Yes Last Dredged: 2003 Environmental Window: No FY 07 Funding: Between $10-$15M Advertisement Date: 7 August 2007 Bid Opening Date: MATOC – To be determined Award Date: 12 November 2007 Dredging Begins: 15 December 2007 Dredging Complete: 15 September 2008 Days to Dredge: 275 POC: Karla Garcia, Contracting Specialist Ph:

Captiva Island Beach Renourishment Type of Dredge: Hopper/Spider Barge Quantity: 80,000 CY Distance to Borrow Area: 11 Miles Dates to Construct: Dec 07 – Jan 08 POC: Karla Garcia, Contracting Specialist Captiva Island Beach Renourishment Type of Dredge: Hopper/Spider Barge Quantity: 80,000 CY Distance to Borrow Area: 11 Miles Dates to Construct: Dec 07 – Jan 08 POC: Karla Garcia, Contracting Specialist SANIBEL ISLAND PINE ISLAND ESTERO ISLAND CAPTIVA ISLAND FORT MYERS BEACH MATANZAS PASS GASPARILLA ISLAND Gulf of Mexico BOCA GRANDE PASS Lee County

Mayport Naval Station – Jacksonville, Florida

Project: Mayport Naval Base, Jacksonville Florida Type Work: Maintenance Dredging Depth: 49 feet + 2 allowable overdepth Width: Varies Length: Approximately 1 mile Quantity: 600,000 CY Type of Material: Silt and Sand Placement Area: ODMDS/Upland Distance to Placement Area: 5 miles Type of Equipment: Hopper/Bucket & Pipeline Small business Set Aside: No, unrestricted Last Dredged: 2006 Environmental Window: None FY 08 Funding: Between $1M and $5M Advertisement Date: 7 August 2007 Bid Opening Date: MATOC - To Be Determined Award Date: 3 December 7 Dredging Begins: 21 January 2008 Dredging Complete: 21 April 2008 Days to Dredge: 91 POC: Veronica Taylor, Contracting Specialist Ph:

Project: Jacksonville Florida Type Work: Maintenance Dredging Depth: 40 feet + 2 allowable overdepth Width: Varies Length: Approximately 15 mile Quantity: 200,000 CY Type of Material: Silt and Sand Placement Area: Upland Distance to Placement Area: 8 miles Type of Equipment: Hopper, Coast Guard Certified Small business Set Aside: No, unrestricted Last Dredged: 2007 Environmental Window: None FY 08 Funding: Between $1M and $5M Advertisement Date: 18 September 2007 Bid Opening Date: 23 October 2007 Award Date: 1 November 2007 Dredging Begins: 30 November 2007 Dredging Complete: 29 January 2008 Days to Dredge: 60 POC: Veronica Taylor, Contracting Specialist Ph:

Project: Manatee Harbor – 1 st Contract Type Work: Maintenance Dredging Depth: 40 Feet Width: 400 Feet Length: Approximately 3 miles. Quantity: 60,000 CY Type of Material: Sand, Clay and shell Placement Area: ODMDS Distance to Placement Area: 34 miles Type of Equipment: Hopper Small Business Set Aside: No, unrestricted Last Dredged: 2002 Environmental Window: No FY 07 Funding: Between $1M and $5M Advertisement Date: 9 October 2007 Bid Opening Date: 8 November 2007 Award Date: 28 December 2007 Dredging Begins: 26 January 2008 Dredging Complete: 16 May 2008 Days to Dredge: 111 POC: Osvaldo Rodriguez

Nassau County Atlantic Ocean GEORGIA AMELIA ISLAND NASSAU SOUND FERNANDINA BEACH FERNANDINA INLET Nassau County Shore Protection Project (SPP) Type of Dredge: Cutterhead Quantity: 2.4 Million CY Distance to Borrow Area: 4-5 Miles Length of Project: 3.6 Miles Dates to Construct: Apr 08 – Sep 08 POC: Rene Perez Nassau County Shore Protection Project (SPP) Type of Dredge: Cutterhead Quantity: 2.4 Million CY Distance to Borrow Area: 4-5 Miles Length of Project: 3.6 Miles Dates to Construct: Apr 08 – Sep 08 POC: Rene Perez

IWW – Vicinity of Jupiter Inlet

Project:IWW Vicinity of Jupiter Inlet Type Work: Maintenance Dredging Depth: 11 Feet & 15 Feet + 1 Feet overdepth Width: 125 Feet Length: 2 Miles Quantity: 100,000 CY Type of Material: Sand Placement Area: Beach Distance to Placement Area: 1.5 miles Type of Equipment: Cuttersuction Small business Set Aside: Yes Last Dredged: 2003 Environmental Window: Yes November - April FY 07 Funding: Between $1-$5M Advertisement Date: 2 November 2007 Bid Opening Date: 17 December 2007 Award Date: 2 January 2008 Dredging Begins: 2 March 2008 Dredging Complete: 30 April 2008 Days to Dredge: 59 POC: Rick McMillen Ph:

Project:Palm Beach Harbor Type Work: Maintenance Dredging Depth: 33 & 35 Feet Width: Ranges from 300 to 400 feet Length: Approximately 1.8 miles Quantity: 150,000 CY Type of Material: Sand Placement Area: Beach Distance to Placement Area: Approximately.6 miles Type of Equipment: Hopper Small business Set Aside: No, unrestricted Last Dredged: 2007 Environmental Window: Yes, Dredging Prohibited 1 May – 31 October Reason for window: Nesting Sea Turtles FY 07 Funding: Between $1M and $5M Advertisement Date: 15 November 2007 Bid Opening Date: 1 January 2008 Award Date: 15 January 2008 Dredging Begins: 1 February 2008 Dredging Complete: 30 April 2008 Days to Dredge: 89 POC: Dan Haubner Ph:

Canaveral Harbor

Project:Canaveral Harbor Type Work: Maintenance Dredging Depth: 44 Feet + 2 Foot allowable Width: 400 feet Length: Approximately 2 miles Quantity: 265,000 CY Type of Material: Sand Placement Area: ODMDS/Nearshore/Upland Distance to Placement Area: Approximately 11.5 miles Type of Equipment: Mechanical Small business Set Aside: No, unrestricted Last Dredged: 2007 Environmental Window: Yes, Hopper Dredges prohibited year round Reason for window: Sea Turtles FY 07 Funding: Between $1M and $5M Advertisement Date: 31 December 2007 Bid Opening Date: 30 January 2008 Award Date: 29 Feb 2008 Dredging Begins: 27 April 2008 Dredging Complete: 15 August 2008 Days to Dredge: 110 POC: Osvaldo Rodriguez Ph:

Kings Bay Navy Base

Project:Kings Bay Naval Submarine Base Type Work: Maintenance Dredging Depth: Varies Width: Varies Length: 2 Miles Quantity: 1,100,000 CY Type of Material: Sand & Silt Placement Area: Upland Distance to Placement Area: 2 miles Type of Equipment: Cuttersuction Small business Set Aside: Yes Last Dredged: 2006 Environmental Window: No FY 07 Funding: Between $1-$5M Advertisement Date: 10 January 2008 Bid Opening Date: 18 February 2008 Award Date: 3 March 2008 Dredging Begins: 13 April 2008 Dredging Complete: 14 July 2008 Days to Dredge: 92 POC: Dan Haubner Ph:

Tampa Harbor Port Sutton Dredge Type: Cuttersuction Quantity: Based on Survey Distance to Disposal: Based on Survey Length of Project: Based on Survey Dates to Construct: Jul 08 – Sep 08 POC: Jackie Keiser

Project:Horseshoe Cove Type Work: Maintenance Depth: 8 Foot Width: 80 Length: 2 Miles Quantity: 200,000 CY Type of Material: Sand & Silt Placement Area: Upland Distance to Placement: 2.3 miles Type of Equipment: Cuttersuction Small business Set Aside: Yes Last Dredged: 1997 Environmental Window: No FY 07 Funding: Between $1-$5M Adv Date: 11 April 2008 Bid Op Date: 3 June 2008 Award Date: 17 June 2008 Dredging Begins: 1 August 2008 Dredging Complete: 1 Nov 2008 Days to Dredge: 92 POC: Rick McMillen Ph:

Project: Manatee Harbor – 2nd Contract Type Work: Maintenance Dredging Depth: 40 Feet Width: 400 Feet Length: Approximately 3 miles. Quantity: 300,000 CY Type of Material: Sand, Clay and shell Placement Area: Upland Distance to Placement Area: 3 miles Type of Equipment: Cuttersuction Small Business Set Aside: No, unrestricted Last Dredged: 2002 Environmental Window: No FY 07 Funding: Between $1M and $5M Advertisement Date: 7 April 2008 Bid Opening Date: 5 June 2008 Award Date: 8 July 2008 Dredging Begins: 7 August 2008 Dredging Complete: 28 November 2008 Days to Dredge: 113 POC: Osvaldo Rodriguez

GIWW CR to AR – Manatee County/Venice Inlet

Project:Gulf Intracoastal Waterway – CR to AR Type Work: Maintenance Depth: 10 Foot Width: 100 Length: 2 Miles Quantity: 270,000 CY Type of Material: Sand Placement Area: Beach Distance to Placement: 2 miles Type of Equipment: Cuttersuction Small business Set Aside: Yes Last Dredged: Unknown Environmental Window: No FY 07 Funding: Between $1-$5M Adv Date: 1 August 2008 Bid Op Date: 1 September 2008 Award Date: 1 October 2008 Dredging Begins: 1 November 2008 Dredging Complete: 1 December 2008 Days to Dredge: 30 POC: Rick McMillen Ph: