PHILADELPHIA DISTRICT 2008 – 2012 DREDGING PROGRAM.

Similar presentations


Presentation on theme: "PHILADELPHIA DISTRICT 2008 – 2012 DREDGING PROGRAM."— Presentation transcript:

1 PHILADELPHIA DISTRICT 2008 – 2012 DREDGING PROGRAM

2 NAP Navigation Projects Cold Springs Inlet (Cape may Inlet) C&D Canal Delaware River, Phila to the Sea Delaware River, Phila to Trenton L&R Canal Barnegat Inlet Absecon Inlet Schuylkill River Mispillion River Murderkill River NJIWW Maurice River Cohansey River Salem River Indian River Inlet

3 Delaware River, Ph to the Sea FY08-FY12 Dredging Schedule Philadelphia District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY11FY12 Placement Site Dredge + Quantity (CY) Hydraulicl 2M Upland Mechanical 500K Hydraulicl 1M Upland Maintenance Dredging Mechincal Hopper 300K Upland Hydraulic ~40K Upland Hydraulic Upland Hydraulicl ~250K Site 92 open Mechanical ~600K Delaware River, Ph to Trenton Wilmington Harbor C&D Canal Proper Schuylkill River Salem River C&D Canal Approaches C&D Canal Lower approach.

4 Delaware River, Phila. to Sea Maintenance Dredging - Hydraulic US Army Corps of Engineers Philadelphia District Cubic Yards – 2,000,000 Type of Material – Maintenance – Silt/Sand Type of Equipment – Pipeline Type of Disposal – Confined Upland Disposal Bid Opening Date – Spring Frequency -Annual Conditions: Issue work assignments for different ranges. First work assignment is normally issued by September.

5 New Castle Range/ Killcohook Disposal Area Disposal Area – upland Delaware River – 5,246 acres C&D Canal - 7,623 acres NJIWW - 36 acres Wilmington Harbor - 277 acres

6 Wilmington Harbor, DE Maintenance US Army Corps of Engineers Philadelphia District Cubic Yards – 650,000 Type of Material – Silt Type of Equipment – Pipeline Type of Disposal – Confined Upland Disposal Frequency -Annual Remarks – No dredging allowed between 1 April and 15 June

7 IWW, Delaware River – Chesapeake Bay Lower Approach Maintenance US Army Corps of Engineers Philadelphia District Cubic Yards – 600,000 Type of Material – Silts Type of Equipment – Open water - Bucket and scows Type of Disposal – Open water Special Conditions – Placement of material in the disposal area Environmental Windows/ Constraints – Open Water placement Remarks – Site 92 closes after 2009

8 C&D Canal Delaware River Baltimore MD DE Dover Chesapeake Bay Poole’s Island Delaware City Chesapeake City IWW from Delaware River to Chesapeake Bay, DE & MD Site 92

9 Schuylkill River Maintenance US Army Corps of Engineers Philadelphia District Cubic Yards – 500,000 Type of Material – Silt Type of Equipment – Pipeline Type of Disposal – Confined Upland Disposal Frequency Every other year Environmental Windows/ Constraints – None Remarks – Numerous pipeline crossings.

10

11 NJ PA Philadelphia Dover DelawareBay Baltimore MD DE ManasquanInlet Barnegat Inlet Absecon Inlet Coastal Navigation Projects Cape May Inlet Indian River Inlet NJIWW

12 FY08-FY12 Dredging Schedule Philadelphia District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY11FY12 Placement Site Dredge + Quantity (CY) Hydraulic 300K Upland Open Beach Gov’t Plant 95K Gov’t Plant 100K Open Beach Maintenance Dredging Gov’t Plant 60K Open Beach NJIWW Cold Spring Inlet Barnegat Inlet Manasquan Inlet

13 New Jersey Intracoastal WaterWay Maintenance US Army Corps of Engineers Philadelphia District Cubic Yards – 350,000 Type of Material – Sand and silt Type of Equipment – Pipeline Type of Disposal – Confined Upland and Open Water Environmental Windows/ Constraints – N/A Remarks – Small Business set aside

14 Rehoboth & Dewey Beaches 2005 Bethany – S. Bethany (initiated 2007) Fenwick Island 2005 DE MD 1 Ocean City DE Shore Protection Projects KEY Constructed projects (date) KEY Lewes – Roosevelt2004 Updated October 2007

15 Philadelphia District Coastal Storm Damage Reduction Projects Barnegat Inlet to Little Egg Inlet (LBI) 2005 Barnegat Inlet to Little Egg Inlet (LBI) 2005 Brigantine Is. – 2005 Great Egg Inlet to Townsends Inlet Cape May City - 1990 Ocean City - 1992 Hereford Inlet to Cape May Lower Cape May Meadows Cape May Point - 2004 Lower Cape May Meadows Cape May Point - 2004 Avalon – Stone Harbor - 2002 Absecon Is. - 2003 Manasquan Inlet to Barnegat Inlet Manasquan Inlet to Barnegat Inlet KEY Constructed Project (Date Initiated) Authorized, not Constructed Not Yet Authorized Oakwood Beach Reeds Beach Villas Updated: October 2007

16 Barnegat Inlet to Little Egg Inlet (LBI) FY08-FY12 Dredging Schedule Philadelphia District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY11FY12 Placement Site Dredge + Quantity (CY) Mechanical 500K Beach Hydraulic- Hopperl 1.6M Hydraulic Hopperl 500K Beach Beach Fill Dredging -NJ Hydraulic- Hopper ~1.1M Beach Hydraulic- Hopper ~800K Beach Hydraulic- Hopper ~650K Beach Hydraulic- Hopper ~400K Brigantine Island Absecon Island Ocean City Beach fill 7 Mile Island Cape May City & CG Base Cape May Point

17 Roosevelt Inlet- Lewes FY08-FY12 Dredging Schedule Philadelphia District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY11FY12 Placement Site Dredge + Quantity (CY) Hydraulic 132K Beach Upland Hydraulic – Hopperl 320K Hydraulic- Hopperl 360K Upland & HARS Beach Fill Dredging - DE Hydraulic ~Hopper 480K Upland Rehoboth – Dewey Beach Fenwick Island Bethany – South Bethany