MODAPS PIP Report August 27, 2013 1-866-738-1275 9454131#

Slides:



Advertisements
Similar presentations
ECHO Browse Reclassification Document ID: ECHO_Ops_Con_023 Version: 2.
Advertisements

CHAPTER 15 WEBPAGE OPTIMIZATION. LEARNING OBJECTIVES How to test your web-page performance How browser and server interactions impact performance What.
1 C6 Land Science Test and Reprocessing Plan Sadashiva Devadiga (GSFC/SSC) Robert Wolfe, Ed Masuoka (GSFC) MODIS Science Team Meeting April 15-17, 2013.
1 MODAPS - Land Processing Status Robert Wolfe and Ed Masuoka Code 619, NASA GSFC Sadashiva Devadiga Sigma Space MODIS Science Team Meeting April 15-17,
MODIS Data at NSIDC MODIS Collection 5/Long Term Data Record Workshop Molly McAllister & Terry Haran January
Status of MODIS Production (C4/C5 Testing) Mike Teague 1/5/06.
MODIS Collection 5 Processing Status May 14, 2008 Barbara DeShong Dr. Michael Teague.
LP DAAC Status MODIS Science Team Meeting April , 2014 Chris Doescher, PMP LP DAAC Project Manager Dr. David Meyer.
Bellwork Week 1 August 15-19, Please find your seat Complete questions 9-13 on the super scientist worksheet. When you finish, sit quietly. I will.
Other Distribution of MODIS Data MODIS Land Collection 5 Workshop Jan. 17, 2007 Robert Wolfe NASA GSFC Code
MODAPS PIP Report June 25, #
Turn in Lab 2 Put your name, section, and perm number on your answer sheet.
Spatial & Temporal Distribution of Clouds as Observed by MODIS onboard the Terra and Aqua Satellites  MODIS atmosphere products –Examples from Aqua Cloud.
AMSR-E SIPS Processing Status Presented by Kathryn Regner Information Technology and Systems Center at the University of Alabama in Huntsville JAXA / AMSR-E.
The MODIS online archive and on-demand processing Edward Masuoka NASA Goddard Space Flight Center, Greenbelt, MD, USA.
NASA/ESA Interoperability Efforts CEOS Subgroup - CINTEX Alexandria, Sept 12, 2002 Ananth Rao Yonsook Enloe SGT, Inc.
U.S. Department of the Interior U.S. Geological Survey Diving into the Data Pool with DAAC2Disk Kelly Lemig ERT, Inc., contractor to the U.S. Geological.
1 MODIS Land C6 Schedule and Status Sadashiva Devadiga 1,2, Ye Gang 1,2 and Edward Masuoka 1 1 NASA GSFC 2 Science Systems and Applications Inc. MODIS/VIIRS.
PoDAG XXI: MODIS Status Marilyn Kaminski MODIS Product Team Lead October 16, 2003.
U.S. Department of the Interior U.S. Geological Survey Access to MODIS Land Data Products Through the Land Processes DAAC John Dwyer and Carolyn Gacke,
25 June 2009 Dawn Conway, AMSR-E TLSCF Lead Software Engineer AMSR-E Team Leader Science Computing Facility.
Rings Node Migration Plan Mark & Mitch PDSMC, UCLA November 28-29, 2012.
MODLAND Volumes and Loads Status MODIS Land Science Team Workshop July 15, 2003 Robert Wolfe MODIS Land Team Support Group NASA GSFC Code 922, Raytheon.
C6 Science Test Plan Draft Version 1 07/22/2009 your feedbacks to
AMSR-E SIPS Processing Status Kathryn Regner Information Technology and Systems Center at the University of Alabama in Huntsville
MODAPS PIP Report January 06,
Status of the MODIS Land-Surface Temperature/Emissivity Product: New Validations and Improvements Zhengming Wan University of California, Santa Barbara.
MODIS Snow and Sea Ice Data Products George Riggs SSAI Cryospheric Sciences Branch, NASA/GSFC Greenbelt, Md. Dorothy K.
s Donna J. Scott, Marilyn Kaminski, Jason Wolfe, Terry Haran NSIDC's MODIS Snow and Sea Ice Products NSIDC provides a suite.
7/13/04 Shaida Johnston MODIS Science Team Meeting 1 Current MODIS Data System: Processing, Archiving and Distribution Shaida Johnston July 13, 2004.
January 3, 2006MODIS Science Team Meeting WELCOME MODIS SCIENCE TEAM MEETING Baltimore, MD January 4, 2005 Vincent V. Salomonson MODIS Science Team Leader.
WEEK 1 You have 10 seconds to name…
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Tropospheric Emission Spectrometer TES GDS Instrument.
Land Report Back Chris Justice (VIIRs) and Steve Running (MODIS)
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
MODIS Cryosphere Science Data Product Metrics Prepared by the ESDIS SOO Metrics Team for the Cryosphere Science Data Review January 11-12, 2006.
MODIS Science Team Meeting, Land Discipline (Jan. 27, 2010) Land Surface Radiation Budgets from Model Simulations and Remote Sensing Shunlin Liang, Ph.D.
MODIS SDST, STTG and SDDT MODIS Science Team Meeting (Land Discipline Breakout Session) July 13, 2004 Robert Wolfe Raytheon NASA GSFC Code 922.
TERRA UPDATE Launch Date NSIDC DAAC Launch Readiness MODIS Snow and Ice Products General Product Release Timeline.
1 LANCE-AIRS LANCE-MLS Status Bruce Vollmer Mike Theobald LANCE User Working Group Meeting November.
PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.
Overview of the MODIS Snow - Ice Project Part 1 MODIS Science Team Meeting Land Team College Park, Md. 18 May 2011 Dorothy K. Hall Cryospheric Sciences.
Overview: MODLAND Production Status, Schedule and Time Series Issues (C4 to C5 Transition) MODIS Land Collection 5 Workshop Jan. 17, 2007 Robert Wolfe.
1 ECHO ECHO 9.0 for Data Partners Rob Baker January 23, 2007.
NSSDC Deep Archive / PDS4/ CDs-DVDs/Hard-Copy Archive 28 August 2012 Dave Williams.
MODIS Distributed Active Archive Centers (DAACs) Level 1 Processing/Reprocessing Level 1+ Archive and Distribution Presentation to MODIS Science Team December.
The Land, Atmosphere Near-real-time Capability for EOS (LANCE) GES DISC UWG May 10-11, 2011 Karen Michael EOSDIS System Manager
Obtaining MISR Data Nancy Ritchey Atmospheric Sciences Data Center May 16, 2004.
Bureau of Land Management. Grew out of FS and Interagency efforts NLCS Division Chief on board as early as 2002 Wilderness Character Monitoring Team formed.
1 2.5 DISTRIBUTED DATA INTEGRATION WTF-CEOP (WGISS Test Facility for CEOP) May 2007 Yonsook Enloe (NASA/SGT) Chris Lynnes (NASA)
DataGrid is a project funded by the European Commission under contract IST EDG Baseline API Document Document build description and current.
October 2, 2008 TAC Texas Nodal Market Implementation: Program Update Ron Hinsley.
Spatial & Temporal Distribution of Cloud Properties observed by MODIS: Preliminary Level-3 Results from the Collection 5 Reprocessing Michael D. King,
MODAPS PIP Report January 27,
MODAPS PIP Report August 25,
MODAPS PIP Report September 1,
MODAPS PIP Report August 7, #
11 The Land and Atmospheres Near- Real Time Capability for EOS Overview and Status Kevin Murphy, ESDIS LANCE User Working Group.
Near Real-Time Status of MODIS and VIIRS Land products Ed Masuoka, NASA/GSFC 619 Gang Ye, Carol Davidson, Sadashiva Devadiga and Jeff Schmaltz, SSAI/GSFC.
AIRS Meeting GSFC, February 1, 2002 ECS Data Pool Gregory Leptoukh.
12/19/01MODIS Science Team Meeting1 MODAPS Status and Plans Edward Masuoka, Code 922 MODIS Science Data Support Team NASA’s Goddard Space Flight Center.
7/13/04 Edward Masuoka MODIS Science Team Meeting 1 MODAPS Reprocessing Collections 4 and 5 Ed Masuoka July 13, 2004.
20th CAA/DAA Cross Calibration Meeting
MODIS SST Processing and Support for GHRSST at OBPG
TripleSpec 4 Status and Coming Steps
MICE PM Report Progress with the Infrastructure A few problems
MODIS Update Presented to PODAG 25, Oct. 26, 2006.
Needs & Wants Game CDA 11 By Megan Rees.
مديريت موثر جلسات Running a Meeting that Works
Click Summary Value Button to Show Source of Integral or Time
Presentation transcript:

MODAPS PIP Report August 27, #

Summary of MODAPS Production 8/27 Forward Processing (C5, C4.1 LST, 5.1 Atmosphere and Greenland IST) –Aqua forward processing is at the leading edge; Terra forward processing is a day behind due to a maneuver. –Collection 6 L1B Aqua and Terra processing is running in parallel with forward processing. –The 41 missing browse files have been resent. An additional list of corrupt Browse was received, and this is also being resent. –All of the MOD07_L2 data on the original list has been resent. LPDAAC has sent preliminary reconciliation for all years, and this data is being resent. –PGE61 has been delivered and is being integrated. –We are creating the metadata for the C5.5 Montana product. –Another production test will be run next week. –We are running an Atmospheres production test.

Summary of PGE Deliveries to SDST 8/27 Collections 5 and 5.1 Level 1: –We baselined a new version of PGE01 (5.0.53) on 8/15. Land: –We received a new version of PGE61 (51.0.3) on 8/14. Atmospheres: Collection 6 Level 1: –We baselined a new version of PGE01 (6.0.18) on 8/19. Atmospheres: –We baselined a new version of PGE55 (6.0.1) on 8/18. –We baselined a new version of PGE06 (6.0.65) on 8/22. –We baselined a new version of PGE81 (6.0.1) on 8/16. –We baselined a new version of PGE85 (6.0.2) on 8/16. Land: –We received a new version of PGE114 (6.3.0) on 8/14. –We received a new version of PGE115 (6.3.0) on 8/14. –We received a new version of PGE31 (6.3.0) on 8/14. –We baselined a new version of PGE32 (6.3.0) on 8/22. –We baselined a new version of PGE58 (6.3.0) on 8/22. –We baselined a new version of PGE59 (6.3.0) on 8/22. –We baselined a new version of PGE75 (6.0.7) on 8/23. –We baselined a new version of PGE07 (6.0.9) on 8/23. –We baselined a new version of PGE30 (6.0.8) on 8/26. –We baselined a new version of PGE23 (6.0.5) on 8/20.

Summary of Science Testing 8/27 Atmospheres Science Testing: –A PGE56 (6.0.7) PGE57 (6.0.5) test completed on 7/5. –2 one day Terra PGE107 tests completed on 7/23. –A four month Aqua PGE04 (6.0.31) test completed on 8/3. –A Terra and Aqua PGE06 (6.0.64) test finished on 8/27. –A PGE03 (6.0.28) test finished on 8/14. Land Science Testing: –A C6 LST PGE16 (6.3.7) test is running. –A PGE36/37 (6.0.2) 8 day test completed on 8/5. –A PGE113 (6.0.4) one year one tile test finished on 8/9. L1 Science Testing: A PGE02 (6.1.29_5) 1 day Aqua test completed on 7/15. A PGE01 (6.0.15/6.0.16/6.0.17) test finished on 8/8.