Presentation is loading. Please wait.

Presentation is loading. Please wait.

MODAPS PIP Report August 25, 2009 1-866-738-1275 9454131.

Similar presentations


Presentation on theme: "MODAPS PIP Report August 25, 2009 1-866-738-1275 9454131."— Presentation transcript:

1 MODAPS PIP Report August 25, 2009 1-866-738-1275 9454131

2 Summary of MODAPS Production 8/25 Forward Processing C5, 5.1 and 4.1: –Terra and Aqua forward processing are as close to real time as possible. –We have completed the reprocessing of PGE41 (MCD12Q1), C5 Land Cover Quarterly processing for years 2002-2007 –We have processed PGE87 (MCD12Q2), C5 Land Cover CMGs through year 2006 –We have completed production of PGE42 (MCD12C1) for years 2001-2007 Collection 5.1 MODHDFSR 2004 reprocessing for burned area reprocessing –The leading edge for this reprocessing is at day 2003/255.

3 Summary of PGE Deliveries to SDST (8/25) Collection 5 Atmospheres: –PGE04 for Terra Deep Blue has been baselined. Land: –A new version of PGE11(LSR) for Mandriva was delivered. Collection 6 Level 1: –A new version of PGE02 (L1b) for Terra and Aqua has been baselined. Land: –We have received the collection 6 versions of PGE16 (LST), PGE75 (daily CMG), PGE21 (8-day Surface Reflectance), PGE90 (Aeronet Subsetter) and PGE11(LSR)

4 Summary of Science Testing (8/25) Atmospheres: –A 3-day science test (1 Aqua, 2 Terra) for PGE04 Terra deep blue has started. An additional 18 days of Terra will be tested after the results from this test are approved. –Results of science tests for PGE69 Mandrake and Mandiva have been approved; waiting for a PCR. Land Science Testing: –A science test for PGE72 (for land water mask) is running (25 of 32 16-day periods have completed). This is expected to complete by the end of this month. –We have completed generating a 1-year test data set of C6 PGE11(LSR) and PGE75(CMG) to be used for collection 6 science testing. –Test results from SSTG for C6 PGE16 are under review by Dr Wan. –A test for a loader module change to PGE60 (check for dynamic chip files) will be performed this week. L1 Science Testing: –A second science test for C6 PGE01 was processed through LSR and control points and is under review. –A science test plan has been submitted by the LDOPE group and is waiting for approval Mandriva Science Testing: –A science test for PGE06 on Mandriva completed and is under review. Differences were found and a new test is being run which involves exclusive runs on SGI, Mandrake and Mandriva. –PGEs 60 (C5) and 90 (C5 and C6) have been approved after evaluation of the science tests. –A chain test from L0 through the land dailies has completed and is under review. The LSR and L1b destriper codes are still being reviewed. –PGEs 01, 02, 03, 07, 08, 43 and 44 have passed Mandriva testing. –Land PGEs are being tested using inputs generated on the Mandrake system PGE 33 is being reviewed by the developer PGEs 3,7,8,11,12,13,14,15,22,43,44,46,75,80 and 84 were tested. A second science test for PGE16 completed and failed. Test results have been forwarded to the developer. Tests for 8- and 16-day PGEs completed; PGEs 21,45,31,58,25,35,29 and 34 passed, PGE72 failed.


Download ppt "MODAPS PIP Report August 25, 2009 1-866-738-1275 9454131."

Similar presentations


Ads by Google