Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.

Slides:



Advertisements
Similar presentations
Equipment for Assembly Fluke Multimeter 115 True RMS Glue Ring Jig Flathead screwdriver 60 Watt desk lamp HIOS Cl 4000 Electric screw driver Anti-static.
Advertisements

MyLock 644D Service Seminar.
Copyright 2008 Kenneth M. Chipps Ph.D. How to Terminate a Corning Unicam Connector Last Update
ATLAS Module building at Glasgow
Pneumatic Arm Assembly Instructions
Pellet Dies: User Instructions Read these instructions carefully before beginning work. Read the risk assessment. If you have not used the die and hydraulic.
Both the dome and slab design use a 5 gallon bucket in the middle to be used as a squat hole FINAL MOLD DESIGN.
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
Electronics Merit Badge Class 4 5/17/2015Electronics Merit Badge Class National Scout Jamboree1.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Preparing & Exposing Photographic Silkscreens For use with Lesson 3 FOR EDUCATION USE ONLY ©2009 The Andy Warhol Museum, a museum of Carnegie Institute.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
Rotating Base Model Assembly Instructions copyright Mechanical Kits Ltd
Lone Star Region National Model Railroad Association “The Shack” Scratch Build -Mike Jobe SESSION 2.
BE PREPARED TO TAKE A FEW NOTES TODAY… Pick up the pink sheet at the front.
ASSEMBLING THE PCB – V3.914 Hold the PCB as shown below.
Forensic Science Adopted from T. Trimpe 2007
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
WP3_Bham; 29May 2014; John Wilson1 Heated plate curing Tests with 130nm hybrids and glass ASICs the glue thickness is controllable. i)Room temp curing.
This is a self-propelled hovercraft, designed to use only one motor which will both lift the vehicle and propel it forward. The hovercraft works by creating.
Latent Prints Forensic Science.
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
ELECTRIC VEHICLE PROJECT CAR BUILDING PROCEDURES BY: PIERRE PEASHA CENTENNIAL HIGH SCHOOL BAKERSFIELD, CA.
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
Forensic Science T. Trimpe 2007
RE 4/3 RPC Pre-assembly manual 1. HCP case preparation
Place template on top as guide for cutting
ATLAS pixel module assembly flow
Latent Prints Forensic Science T. Trimpe
Latent Prints Forensic Science T. Trimpe
Latent Prints Forensic Science T. Trimpe
Ladder Assembly All tools and jigs produced Glue dispensing works
Hybrid Issues.
Workshop Rotating Platform
Step-by-step assembly instructions
Step-by-step assembly instructions
Latent Prints CSI Holly Academy T. Trimpe
Latent Prints Forensic Science.
Materials Open silkscreen Scoop coater Photosensitive emulsion
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Hydraulic Arm Assembly Instructions
Step-by-step assembly instructions
Materials Open silkscreen Scoop coater Photosensitive emulsion
Latent Prints Forensic Science.
POP BOTTLE COMPLETE FLOWER PROJECT
Step-by-step assembly instructions
Latent Prints Forensic Science T. Trimpe
Latent Prints Forensic Science.
Latent Prints Forensic Science T. Trimpe
Latent Prints Forensic Science
Latent Prints Forensic Science T. Trimpe
Latent Prints Forensic Science T. Trimpe
Latent Prints Forensic Science.
Latent Prints Forensic Science T. Trimpe
Latent Prints Forensic Science T. Trimpe
Step-by-step assembly instructions
Latent Prints Forensic Science T. Trimpe
Dusting for Latent Prints Forensic Science.
Latent Prints Forensic Science T. Trimpe
Latent Prints Forensic Science T. Trimpe
Latent Prints Forensic Science T. Trimpe
Latent Prints Forensic Science T. Trimpe
Step-by-step assembly instructions
Latent Prints Forensic Science T. Trimpe
Latent Prints Forensic Science T. Trimpe
Presentation transcript:

Hybrid assembly at Glasgow

Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes which hold 15 at a time Use battery operated pick up tool – Clean with PCB wash before lifting ASICs Check if all ASICS are sitting flat on tray

Picking up ASICs Apply Hybrid pick up tool to ASIC tray (using cantilevers) and switch on the vacuum – If ASICS are not level in tray, ASICS will crack/break

Picking up ASICs Lift up Pick up Tool by rotating 2 cantilevers – All 20 ASICs should now be held to tool by vacuum – Place on Pick up holder – Inspect for dust and any x-y movement

Glue Stencil Attach glue stencil (and 2 outer Al holders) to top of pick up tool – Glue stencil should be flush against ASICs Attach clamps to either side of stencils where clamp points on PUT jig are

Preparing Glue Open Glue package – Undo plastic part with screwdriver – Mix sides with fingers for 30s – Use scalpel to remove 1 small corner Cut on clean room paper – Squeeze glue on to inside of glue package (shiny side)

Applying Glue Use glue spreader – Spread glue on 3x1 sections (and 2x1 at edges) – Use enough glue to cover 5 holes on each ASIC – Remove extra unused glue with spreader Remove Clamps and stencil – Inspect for 5 spots on each ASIC and for any x-y movement Glue Sections

Gluing ASICs to hybrid Move HPUT and holder onto next bench 8 way jig should have vacuum on for chosen panel Place HPUT on to chosen hybrid panel rolling back cantilevers – ‘T’ on jigs should be on same side Place 2 brass heights (inverted) on to HPUT (might need to lift cantilevers slightly – Leave for at least 8 hours Cantilever not in position yet

Cleaning up Rub remaining glue from spreader on top paper – Use PCB wash to remove final amounts Use clean room paper to remove majority of glue from stencil – Used clean room paper with PCB wash to remove rest