PBN and Regional Aircraft Pierre Alibert Marchi Product Development Engineer - Avionics, October 17 th, 2012 Legacy, turboprop and regional issues.

Slides:



Advertisements
Similar presentations
MINIMUM NAVIGATION PERFORMANCE SPECIFICATION AIRSPACE (MNPS)
Advertisements

ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Javier Perez Diestro Air Navigation International Director
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
Department Head for PBN Tools, Processes, and Criteria
Enroute Design 1 Lead Instructor:
31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 1 New techniques and procedures CAAC’s Progress on PBN.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
PBN Plan Development Aviation Industry Forum 18 November 2009.
NextGen GA Fund, LLC A Fund to Accelerate NextGen Equipage Benefits for the General Aviation Operator Community.
ATN 2002 London September 2002 Presented by Aloke Roy Authors: Christophe Hamel Tom Judd Ketan Nguyen Bryan Rowe Kevin Wohlers ATN AIRBORNE IMPLEMENTATION.
Enroute Design 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Federal Aviation Administration Navigation Services Overview Briefing to Air Traffic Management Bureau of the Civil Aviation Administration of China (CAAC)
Regulatory Plan to support the future ATM system in Australia UPDATE ON CASA RULEMAKING IN THE YEAR SINCE SITF/10.
Area Nav: RNP Evolution
Airline Schedule Optimization (Fleet Assignment II) Saba Neyshabouri.
TARGETS Enabling NextGen With Advanced Procedure Design Software October 22, 2013.
Alternative Positioning, Navigation, and Timing Initiative
© Air Taxi Association, 2008, CONFIDENTIAL Air Taxi Association (ATXA) Image Source: © Respective Companies. As example only. Not for reproduction. Very.
Study Continuous Climb Operations
1 Presented by Erwin Lassooij (ICAO, Montreal) Presented by Erwin Lassooij (ICAO, Montreal) From RNP divergence to Performance Based Navigation Convergence.
GNSS Aviation Applications
Presented to: NAS-Wide Simulation Workshop By: Kimberly Noonan, FAA NextGen and Ops Planning Date: January 28, 2010 Federal Aviation Administration NextGen.
Optimal Approach procedures
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
1 IATA / Airline Views on Performance Based Navigation Theo van de Ven/KLMAnthony van der Veldt/IATA Senior Manager Strategy & User ChargesAsst Dir Safety.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
June 2013 Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) June 2013.
EMISSIONS OPERATIONAL-MEASURES WORKING GROUP CAEP WG-4 REDUCING FUEL BURN THROUGH IMPROVED OPERATIONAL MEASURES Colloquium on Environmental Aspects of.
From RNP Divergence to Performance Based Navigation Convergence
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
________________________________________________________ GBI Cost Analysis SAE Advances in Aviation Safety April 11th, 2000 SAE Advances in Aviation Safety.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
1 EMERGENCE OF REGIONAL JETS AND THE IMPLICATIONS ON AIR TRAFFIC MANAGEMENT MIT International Center for Air Transportation Aleksandra Mozdzanowska, R.
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Jon Hadler and Dr. David Ison
Vertical, lateral separations based on time / distance
Workshop on preparations for ANConf/12 − ASBU methodology
UPDATE ON CASA RULEMAKING IN THE YEAR SINCE SITF/10
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
PBN Performance Based Navigation
Performance Based Navigation: Navigation Specifications
Airspace Change Summary
Workshop on preparations for ANConf/12 − ASBU methodology
Basics of RNP.
BEIRUT - RAFIC HARIRI INTERNATIONAL AIRPORT EXPANSION
Workshop on preparations for ANConf/12 − ASBU methodology
PBN and the benefits for GA
DCA, A Pilot’s Perspective
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
PBN and Regional Aircraft
Ops Specs The performance data for takeoff and landing an aircraft can be obtained from the aircraft's flight manual or pilot's operating handbook. The.
RNAV and RNP Strategy in Japan
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session
2016 Maintenance Innovation Challenge
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

PBN and Regional Aircraft Pierre Alibert Marchi Product Development Engineer - Avionics, October 17 th, 2012 Legacy, turboprop and regional issues

2PBN and Regional Aircraft Embraer Commercial Airplanes 37 PAX ERJ-135 1,750nm ERJ-140 1,650nm In Service Since 1998 In Service Since 2000 Embraer 170 2,100nm ERJ-145 1,550nm In Service Since 1995 In Service Since 2004 Embraer 175 2,000nm In Service Since 2004 Embraer nm In Service Since PAX 50 PAX PAX 78 – 88 PAX 98 – 114 PAX 108 – 122 PAX Honeywell Primus 1000 Honeywell Primus Epic In Service Since 2006 Embraer nm

3 Introduction – Basic Assumptions  Constructed based on NextGen Operational Statistic (Commercial Aircraft Fleet Readiness Estimative) given by FAA Equipment Interoperability Other Transaction Agreement Project.*Additional information with Mr. Ronald L. Stroup -  PBN NextGEN Operations Definition:  World wide Commercial Aircraft Fleet Classification :  Regional Aircraft: ERJ-135/140/145, E 170/175, Dash8/Q400, CRJ100/200, CRJ700, CRJ900/705, CRJ1000  Wide-body: , 747-8, 767, 777, 787, A300, A330/340,A380, A350  Narrow-body: 737NG Family, A320 Family, E 190/195, CS100, CS300 PBN and Regional Aircraft Regional Aircraft Scenario

4PBN and Regional Aircraft Enroute Operations BasicInterim

5PBN and Regional Aircraft Terminal Operations (SID, STARS) BasicInterim

6PBN and Regional Aircraft Approaches Operations BasicInterim

7PBN and Regional Aircraft AR Approaches Operations BasicInterim

8  Basic RNAV capability already can bring significant benefits: Enroute optimization (using RNAV 5, RNAV 1 and 2), improving capacity and reducing fuel consumption, noise levels, etc.; Replacing conventional routes with RNAV routes leads to reduced maintenance of conventional navaids (eg:NDB, VOR); Terminal airspace optimization and reduced controller-pilot communication. Improves the predictability and situational awareness since it creates a repeatable ground track and patterns of depature and arrival. PBN and Regional Aircraft Conclusion – Are we ready to go?

9  Many of the current regional aircraft cannot meet more stringent PBN requirements without retrofits that are often too costly, e.g.: incorporation of a VNAV capability, inertial, etc. Due to current forecasts of service, the economics to justify such retrofit costs may not exist. Therefore we recommend: To explore more the use of RNAV basic capabilities; Consider that for more stringent requirements, the future airspace must accommodate those aircraft without major operational restrictions; Exemptions for mandates need to be considered;  Standards and Requirements need to be frozen in advance of the expected entry into service. In general 3-5 years is necessary; Developments based on preliminary standards add risks and possible re-work. PBN and Regional Aircraft Conclusion – Are we ready to go?