Presentation is loading. Please wait.

Presentation is loading. Please wait.

31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 1 New techniques and procedures CAAC’s Progress on PBN.

Similar presentations


Presentation on theme: "31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 1 New techniques and procedures CAAC’s Progress on PBN."— Presentation transcript:

1 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 1 New techniques and procedures CAAC’s Progress on PBN

2 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 2 BACK GROUND Operation at high elevation airports Traffic Increase

3 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 3 Operation At High Elevation Airports  General High Elevation Airport: At or above 1500 m (4922 ft) but below 2438 m (8000 ft). In service:12, On construction:3  Very High Elevation Airport: At or above 2438 m (8000 ft). In service:6, On construction:3 Bangda ( 4334m/14220ft )  More coming……

4 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 4 RNP/RNAV  WGS-84 is approved to be used in CAAC.  RNAV  RNP

5 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 5 RNAV/RNP - En route  Remote/Oceanic RNP10 South China Sea RNP4 FANS route , Parallel route L888 Y1 Y2 Y3  Busy Area RNAV 2 RNP 2

6 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 6

7 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 7 RNAV - Terminal  RNAV1/RNAV2 AC 91-09 June. 2008 Operation Guidance for RNAV1 &RNA2 in Terminal and Enroute Flight  RNAV SID/STAR :2007-2008 10 main international airports RNAV1 Beijing, Shanghai(2), Guangzhou, Shenzhen, Wuhan, Shenyang, Xian, Chengdu, Wulumuqi

8 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 8 RNP - Approach  AC 91-02 Feb.23 2006 Airworthiness and Operation requirement for special SAAAR RNP procedure Equivalent to FAA Notice 8000.326  AC 91-05 Dec.27 2006 Airworthiness and Operation requirement for public SAAAR RNP procedure Equivalent to FAA AC90-101  CAAC IB Jan.11, 2007 Construction criteria for RNP/AR procedure Equivalent to FAA Order 8260.52

9 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 9 RNP projects  Lhasa,Boeing757,2004-2006  Linzhi Air China , B757-200,July 2006 China Eastern, B737-700,May 2007  Jiuzhai Air China , B757-200, Feb.2006  Airbus program  More airports/airlines ……

10 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 10 RNP AR projects  Lhasa, Night Flight, RNP0.3 June 2008  LiJiang China Eastern, Boeing, B737-700,May 2008 100% RNP0.3 operation (6 Boeing operators and 4 Airbus operators)  YanJi, Bangda,HuangShan,XiNing Airport  Develop common application package for operators

11 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 11 P

12 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 12 Linzhi RNP  Location : Tibet , Valley of Yuluzhangbu River  Elevation:2949m/9675ft  Terrain: Narrow and steep valley  High mountains of 4000m around the airport  Complicated weather  The most challenged airport in China  10,000,000 USD for ground Navaids

13 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 13 Linzhi

14 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 14

15 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 15

16 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 16 PBN Roadmap  According to ICAO ’ s request  Guidance for fully implementing PBN  Time Frame:2009-2016-2025  Cooperation with Boeing  Expected to be released in March 2009

17 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 17 Advise Circular  AC 91-06 Feb. 2008 Operation Guidance for RNAV5 ICAO Template Recommend for Contract States

18 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 18 RNAV(GNSS) project  Test flight in CAAC flight college  Baro-VNAV combined  Drafting AC on RNP APCH

19 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 19 RNP equipage Retrofit  Project supported by CAAC  Focused on B737NG and A320 family  GPS Retrofit is also a part

20 31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 20 THANK YOU 29th,May, Verification flight


Download ppt "31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 1 New techniques and procedures CAAC’s Progress on PBN."

Similar presentations


Ads by Google