Tropicana Avenue To Blue Diamond Road I-15 South Design-Build Project Paving the Way to a More Mobile Las Vegas Presented to Las Vegas Convention and Visitors.

Slides:



Advertisements
Similar presentations
Some things cant wait for traffic Capital Beltway HOT Lanes Project Update – January 2011 New Travel Choices Ahead.
Advertisements

Some things cant wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update – August 16, 2011 New Travel Choices Ahead.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-390 Interchange Improvements Design-Build Project (PIN ) City of Rochester & the Town of Brighton,
October 9, 2014 Glenn's Bay Road Widening and Interchange Project.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
 Narrow roadway, with no shoulders  Poor pavement condition  AADT 405/150 – Low Traffic Volume  Ideal candidate for P.I.P.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
10 miles on I-80 from Robb Dr. to Vista Blvd. Reconstruction through congested downtown Installation of new 10-mile ITS system Preserved Operational Capacity.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
Transportation Infrastructure Bond Corridor Mobility Improvement Account.
Innovative Contracting Construction Management Association of America Seminar May 17, 2013 California Department of Transportation.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 1 Traveler Information on 2010 Construction Route 7 over I-87 (Exit 6) Bridge Replacement Town of Colonie.
December 12, 2013 Glenn's Bay Road Widening and Interchange Project.
DRAFT 2009 Long Range Transportation Plan Highway Projects August 11, 2009.
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
Poplar Street Bridge City Arch River Consultant Presentation December 16, 2011 Room 160, St. Louis District Office.
Route 364 (Page Ave. Extension) The Missouri Department of Transportation.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Route 7 Corridor Projects Fairfax County Transportation Advisory Commission April 15, 2014 Leonard (Bud) Siegel Jr., PE Virginia Department of Transportation.
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
I-15/LOS ALAMOS ROAD OVERCROSSING City Council Meeting January 17, 2012.
The Miami Intermodal Center September 23, 2009 Is Becoming a Reality!
Southern Nevada HOV Plan Update ITE Luncheon July 17, 2014 Jeff Lerud, Project Manager.
Current Construction Projects Major Projects Pinellas County.
Route 1 Project Study Report Overview. A report that describes the transportation problem and identifies the project scope, schedule and estimated cost.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
Texas Transportation Commission Presentation Scott McLaughlin, CRRMA Chair October 25, 2012.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, PE, CPM Project Manager APWA.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
Metro Highway Program Presentation to CMAA Abdollah Ansari
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Metric to English Conversion California Bridge Construction Forum March 8, 2006 Mark Leja, Chief, Division of Design California Department of Transportation.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Existing Interchange CC 215 Single bridge I 15
Interstate 15 North 8/17/2015 Update
Transportation Conference Jason Voigt, P.E., NDOT Resident Engineer
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Interstate 15 North 4/09/2015 Update
Interstate 15 North Phase 4
From North of River Road to North of State Road 681
Highway 169 Bridge Replacement & Pavement Resurfacing
SW Gage Blvd - Street Repair Project
NEVADA TRANSPORTATION CONFERENCE March , 2011 Reno, Nevada
Contract 60X10 Informational Meeting Weber I-55
Harbour Island Force Main Replacement
Commissioners Presentation
Metropolitan District | mndot.gov
Major Initiatives in Hampton Roads
Presentation transcript:

Tropicana Avenue To Blue Diamond Road I-15 South Design-Build Project Paving the Way to a More Mobile Las Vegas Presented to Las Vegas Convention and Visitors Authority Presented by Susan Martinovich

Improvements to I-15 from Tropicana Ave. to South of Blue Diamond Rd., including:  Widening I-15  Addition of Collector Distributor roads  Improved ramps at interchanges  Tropicana Avenue  Russell Road  I-215  Blue Diamond Road  Silverado Ranch Blvd What is the I-15 South Design-Build Project ?

Improvements to I-15 from Tropicana Ave. to south of Blue Diamond Rd., including:  New bridges over I-15 at Warm Springs Road and Sunset Road  Landscaping and Aesthetics  Intelligent Transportation System  Ramp Meters  Variable Message Signs  Cameras What is the I-15 South Design-Build Project?

I-15 South Design-Build Project Blue Diamond Rd. Silverado Ranch Blvd. Russell Rd. 215 Tropicana Ave.

Design-Build Lump Sum Contact $246,500,000 Prelim. Engr. (includes procurement) $16,000,000 Construction Engineering $17,000,000 Incentives, Escalations, and Utilities $6,000,000 Project Costs

Notice to Proceed – September 2009 Design substantially completed – Fall 2010 Construction began – December 2009 All I-15 Lanes completed and open - March 2012 Project Completion – Spring 2012 Schedule

Design - 95% complete Construction - 48 % complete Project Status

Budget/Cash Flow

Currently 300+/- working on design and construction Peak employment estimated at 400+/- Employment

Southbound I-15 auxiliary lane and 2-lane off ramp to Silverado Ranch Road - Open Northbound I-15 Auxiliary lane from Silverado Ranch - Open Sunset Bridge - Under Construction I-15/I-215 interchange - Under Construction C-D Roads and bridges - Under Construction Russell Road (widening) - Under Construction Construction to Date

Upcoming Milestones Sunset Bridge Open January 13 Warm Springs Bridge To be demolished Feb 2011 To re-open as 6-lane bridge Spring 2012 I-15/ I-215 Construction To be complete Feb 2012 Russell Road Widening To be complete Aug 2011