CSC, 13.9.2006 1 Status of HIPPI – September 2006 Maurizio Vretenar Alessandra Lombardi.

Slides:



Advertisements
Similar presentations
D.S. proposal 18/12/2003 R. Garoby 1 PROTON DRIVER ACTIVITY Present work program: IPHI-SPL collaboration HIPPI Joint Research Activity [CARE] Proton driver.
Advertisements

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
CSC, , A. Lombardi. 1 Status of HIPPI – April 2007 Maurizio Vretenar Alessandra Lombardi.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Linac4 Status C. Carli presenting (a slightly adopted selection of) slides prepared by and on behalf of M. Vretenar Looking from this point and with a.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
1. 2 HIPPI at end Official end of the Activity in December 2008  no extensions will be considered. The remaining deliverables are due at the latest.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
R.G. – 17/03/2003 MORIOND Workshop The SPL* at CERN OUTLINE  Why ?  How ?  Roadmap  Summary * SPL = Superconducting Proton Linac A concept for.
Field and Phase Error Studies in Normal Conducting Structures LLRF and Beam Dynamics in Hadron Linacs – EuCARD2 Workshop Ciprian Plostinar
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
HIPPI 05, Abingdon, Introduction to HIPPI05 -Few words on the life of HIPPI -A new HIPPI Management… -HIPPI 05 organization -Mandate for the.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
1 1. Some recent views ( ) 2 Linac tunnel
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
The status of RF components on Maria Filippova, RF components: Loads Phase shifters Attenuators Hybrids Splitters Directional couplers.
CARE 05, CERN, HIPPI Activities -HIPPI Structure Highlights -ESAC Report -Planning and deliverables Maurizio Vretenar, CERN.
CARE 06, Frascati, HIPPI in HIPPI Objectives Activities -ESAC Report -Planning and deliverables Maurizio Vretenar, CERN.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Linac4 Status 1 M. Vretenar sLHC public event
CHARGES TO THE ESAC The External Scientific Advisory Committee for the HIPPI JRA inside CARE has been nominated to analyse the work done and planned in.
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
1 1.Summary of H- source review 2.Options for connection to the PS Booster 1.Summary of H- source review 2.Options for connection to the PS Booster.
Report Working Group “Cavity design and construction” 1 SPL collaboration meeting Vancouver 8-9 May 2009revised by W. Weingarten on 30/4/2009  Status.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
CSC, Status of HIPPI – September 2008 M. Vretenar, A. Lombardi.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
Orsay, 03/Feb/05EURISOL - Beta Beam TaskM. Benedikt 1 The Beta-Beam Task Status and Planning 02/2005 to 01/2006 Michael Benedikt AB-Department, CERN.
WBS2.11 Vacuum systems G.Vandoni …brainstorming presentation… VAT Technical & Scientific7 th July 2008.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
Linac4 & SPL Status of preparation and Opportunities M. Vretenar (R
Linac4 status and perspectives
The CERN Linac4 history, performance, perspectives
Linac4 M. Vretenar for the Linac4 design team
Complementary ISTC Projects #3888, 3889p
Second SPL Collaboration Meeting, Vancouver May 2009
Superbeams with SPL at CERN
LINAC4 commissioning plans etc.
Report from the 1st meeting of Linac4 Machine Review Committee
Collective Effects and Beam Measurements in Particle Accelerators
Ciprian Plostinar Workshop on Testing and Commissioning
Krzysztof Czuba ESS LLRF Quarterly Meeting
The SPL-based Proton Driver at CERN
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

CSC, Status of HIPPI – September 2006 Maurizio Vretenar Alessandra Lombardi

CSC, HIPPI in Exactly mid-way through the project -8 deliverables and 4 milestones in 2006: large # of deliverables

CSC, Milestones and Deliverables Dec. 06 OK Feb. 07 Dec. 06 Oct. 06 ? OK

CSC, Status of Milestones - Deliverables List prepared by AL with links:

CSC, Dissemination & Reports (info from Alessandra): -17 CONF papers (EPAC and LINAC Conferences in 2006). -7 CARE Notes (some HIPPI-DOC have been promoted to CARE Notes). -2 CARE Reports -1 HIPPI-DOCument 2 nd Quarterly Report 2006 completed (6.9.06).

CSC, HIPPI06 Meeting in Jülich -JRA Meeting on September 27 th – 29 th in Julich (FZJ, financial contribution from the Direction will cover banquet and internal transportation). -Expected 30 – 40 participants from all contributing institutes + 1 or 2 external. -Confirmed participation of the 3 members of the ESAC: J. Stovall (LANL- SNS), Y. Yamazaki (KEK-JPARC), A. Pisent (LNL). -Some modifications to the structure of the meeting: 4 sessions of 3 hours for each of the 4 Work Packages (programme under responsibility of the WP Coordinator) 1 general session covering topics between WP’s (resp. Coordinator) 2 talks on the status of the linac projects covered by HIPPI (GSI and CERN). More time for the ESAC

CSC, HIPPI06 Preliminary Programme Programme will be finalised on Sept. 15 th. Slides on the web (for the ESAC) one week before the meeting.

CSC, Status of HIPPI – Technical Info -A negative point for the coordination between EU project: GSI has chosen for the FAIR Linac the frequency of 324 MHz (Toshiba klystrons), as RAL did already a year ago. Arguments: Toshiba is becoming leader on the market (JPARC, China) + have a common frequency with a possible UNILAC upgrade (324=3*108). -CERN remains alone in the choice of 352 MHz for Linac4, imposed by the available LEP klystrons (8 MEUR value for the project) and other RF equipment and by the frequency of the IPHI RFQ. -A common frequency would have allowed to gain more weight towards the klystron manufacturers, via competition between Thales and Toshiba. -The choice of 324 MHz gives a clear preference to a non-EU company (Toshiba) and could definitely cut out of the market Thales.

CSC, Status of Linac4 & GSI FAIR linac -Linac4 included in the Medium Term Plan submitted to the Council at the end of the year. Upon demand by R. Aymar, minimum funding in 2007 (1.3 MCHF, but 6 additional posts). Real funding from 2008, first injections in PSB from Technical Design Report in preparation (draft ), big step forward in the machine design. -New options under consideration: single frequency (352 MHz only), new position in an extension of the Linac2 tunnel. -GSI will start ordering a klystron prototype already in The accelerating cavities (CH) have modified by adding a coupling cell that allows reducing splitting from klystrons.

CSC, Highlights WP 2 – Normal Conducting Structures The Russian ISTC DTL Prototype is late by 5 months (and some technical points are not clear yet): will be delivered to CERN at best in August 2007, quite late for the decision on Linac4 DTL. New layout (with coupling cell) of the CH cavities made at Frankfurt for GSI One cell of cold model of SCL for Linac4 finally made at LPSC – activity about 1 year late, concerns for Linac4. CCDTL prototype (Linac4) finally under high power RF testing at CERN (1yr late). CCDTL prototype made in Russia waiting for some brazed parts (priority to LHC).

CSC, Highlights WP 3 – Superconducting Structures Progress in the design of spoke cavities + definition of a spoke layout in competition with NC designs. Preparation of 704 MHz test stand in Saclay: - klystron (CPI) on schedule, should be delivered before end HV power supply to be assembled before end of 2006

CSC, Highlights WP 4 – Beam chopping The CERN chopper line as it will be mounted on the IPHI RFQ support at Saclay. Chopper tests at Saclay: The persisting delays in the IPHI RFQ (machining+brazing) would put at risk the HIPPI chopper tests: delivery of the RFQ at CERN foreseen only at end A temporary set-up has been defined to allow testing of CERN chopper at Saclay in 2 nd half 2008.

CSC, WP 4 – Beam chopping Vacuum test of CERN chopper made (2 E-9 mbar reached last Monday). Driver prototype should arrive mid-September and power tests can start soon.

CSC, WP 5 – Beam dynamics The first bloc of the UNILAC beam dynamics experiment planned for HIPPI was successfully conducted end of May. The experimental data are in the process of being compared with different simulation codes (Parmila, Dynamion and Path).

CSC, HIPPI Detailed Planning

CSC, Planning - 2