1 Report from the 1st meeting of Linac4 Machine Review Committee
Günther Geschonke, Stuart Henderson, Alban Mosnier, Ulrich Ratzinger, Yoshishige Yamazaki 30 January 2008 Linac4 Review Committee

2 Linac4 Review Committee
Charge “Monitor progress and provide advice on technical and management issues”. 30 January 2008 Linac4 Review Committee

3 Linac4 Review Committee
Introduction LINAC4 = First step to guarantee the LHC performance and to implement the future upgrade of the Cern injector complex its design and location fit well the possible later injection into the SPL 30 January 2008 Linac4 Review Committee

4 Linac4 Review Committee
for PSB for LP-SPL for HP-SPL 400 s 1.2 ms 1.1 Hz 2 Hz 50 Hz 0.044 % 0.24 % 2 % Parameters Full consistent parameter list available intensity in PSB improved by a factor 2 Energy 160 MeV OK for PSB Frequency change 700 (TDR06)  352 MHz MRC endorses the move to a single frequency ! RF and Beam Dynamics advantages But the different duty cycles are confusing for the design of the components (power sources, structures...) needs to be clarified for the specs 30 January 2008 Linac4 Review Committee

5 Linac4 Review Committee
Beam Dynamics looks on the safe side, in comparison with other similar projects (SNS, J-PARC) however, concern about the RF tolerances (0.5% in amp, 0.5° in phase, as needed in DTL) to check a larger longitudinal acceptance, study the sensitivity to the s law, field ramp ... small safety margin in DTL decision between 2 PMQ designs needed soon think about steerers in empty DT (FFDD lattice) 30 January 2008 Linac4 Review Committee

6 Linac4 Review Committee
Ion Source DESY-type is a robust design and performances already achieved very close to the LINAC4 specs good lifetime (RF antenna) no cesium MRC encourages beam measurements at the TestStand (expected end of 2008) 30 January 2008 Linac4 Review Committee

7 Linac4 Review Committee
RFQ home-made (drawings, machining, brazing) to master all the fabrication steps tolerances look similar to IPHI RFQ length divided by 2, but smaller aperture (1.8 mm) can learn from the IPHI experience especially, deformation during heat-treatment concern about dipole modes consider Pi-mode stabilizing loops to relax mechanical tolerances 30 January 2008 Linac4 Review Committee

8 Linac4 Review Committee
Chopper design looks fine deflecting structure is OK concern about the pulse driver 0.5 kV in less than 2 ns ! needs specialized FID technology MRC encourages beam test ASAP chopper line expected in operation in 2010 is it realistic ? 30 January 2008 Linac4 Review Committee

9 Linac4 Review Committee
Choice of structures Question: Is the present choice optimal ? trade-off between efficiency, beam dyn. & cost the efficiency study was made, is that the cost optimum wrt energy ranges ? 30 January 2008 Linac4 Review Committee

10 Linac4 Review Committee
Drift Tube Linac Field looks fine (Killpatrick < 1.6) Drift tubes alignment: mechanical tests could be done soon Cooling issue: to prevent from local over-heating of the drift tube (PMQ & innertube) power test ASAP, expected in Summer 2008 thermal beam loss studies Now two distinct approaches: decreases the technological risk 30 January 2008 Linac4 Review Committee

11 Linac4 Review Committee
CC-DTL LINAC4 will be the first Linac in the world to be equipped with CC-DTL structures Sealing : Cu-plated Helicoflex gasket good for vacuum but RF performance should be checked (alternative ?) designed for which max. duty cycle ? additional cooling is required in the tuners Two distinct technological approaches: what is the conclusion ? 30 January 2008 Linac4 Review Committee

12 Linac4 Review Committee
PIMS robust design (LEP) and even better understood ... Transient behaviour: well analysed and conclusion was positive Choice of copper (3D forged or not ?) in case metallurgical experts cannot answer, make two prototypes with different copper and compare before series production ... 30 January 2008 Linac4 Review Committee

13 Linac4 Review Committee
RF power 1 big 2.5MW klystron? compare the total cost : klystron + RF splitting + possibly High power Phase & Amp control and 2 x 1.3MW klystrons Specs should allow the average power for SPL Modulators: space should be enough for the upgrade to SPL requirements Space issue: no room is left consider vertical klystron 30 January 2008 Linac4 Review Committee

14 Linac4 Review Committee
LLRF choice: to start from the LHC system not far from the LINAC4 requirements more study on the performance of the phase and amplitude (or I/Q) control bandwidth of the feedback loops operation close to saturation: enough margin on power overhead (at the expense of the efficiency) 30 January 2008 Linac4 Review Committee

15 Linac4 Review Committee
Beam instrumentation diagnostics plan looks very promising but developments are needed to compact the devices 30 January 2008 Linac4 Review Committee

16 Linac4 Review Committee
Magnets even if some magnets are foreseen for the low duty cycle in the 1st stage for obvious economic reasons, a design for all magnets should exist for the SPL requirements 30 January 2008 Linac4 Review Committee

17 Linac4 Review Committee
Test-Stand MRC appreciates the possible extension to 10 MeV A lot of tests are essential for the success of the project: Take care to additional delays ! 30 January 2008 Linac4 Review Committee

18 Linac4 Review Committee
Resources Time-schedule (5 years ½) is short organisation: matrix structure of the project (Working Group coordinators / Workpackage responsibles) could optimise the manpower In parallel, the TestStand, the Design and construction of Linac 4 : a big issue the total manpower should not be underestimated !!! 30 January 2008 Linac4 Review Committee

19 Linac4 Review Committee
Final comments Very impressed with the new LHC injectors effort, now focused on the Linac4 Has a complete 10-year scenario for the LHC luminosity upgrade 2007  2017 Presentations were excellent MRC appreciates the right approach adopted to meet this big challenge as well as the progress made so far by Maurizio and his Team Thanks to All (especially to Cecile) 30 January 2008 Linac4 Review Committee