Objectives In the 1 st half of this Module we’re going to cover: The computerized estimating process. How a Contractor comes up with his Material Costs.

Slides:



Advertisements
Similar presentations
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
Advertisements

Substation L1/ MCC L1 Update March 21 st, Current Location.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
LiberRATE Estimating It thinks like you do! Edition 3 Instructions Click on buttons to advance or to repeat the previous slide PreviousNext.
Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
1 1 Dr. Mark Stewart, Camden County Schools Steve Adams, Johnson-Laux Construction Jon Held, Georgia ezIQC SWC Project Manager Willie Moon, DOAS Contract.
BHSestimator for Windows
Setting Up The Project Project Manager Academy Section Five JOB LOOP 5.0Post Project Review 4.0Project Management 3.0Project Pricing 2.0Project Estimating.
Chapter 7 Estimating Plumbing, HVAC, and Electrical Work.
28 Residential Electrical Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Explain the characteristics.
“Update on the Expansion of CSU’s Underground Electric System” Selection of a Street Light Monitoring System Presented by : Timothy R. Crabb, P.E. Assistant.
Planning & Scheduling Systems: From Design to Fabrication.
Chapter 12 Pricing Masonry Carpentry, and Finishes Work.
Chapter 19 Electrical Plans.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
EET Survey of Electronics
Electrical Power Systems
CON 4003 Construction Estimating Prof R. V. Locurcio.
Welcome To The 1 st Choice Electrical Estimating System #1 in Estimating software Click To Start Click F5 to open the program then Start to run.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
By Carlin Bright. Electricity The flow of electrons in a conductor.
PRE-formance™. 22  PRE-formance“Basic”  PRE-formance “Basic” Standard Pre-fabricated Assemblies  PRE-formance “Custom” Assembled to Order PreFab products.
Improving Safety through Efficiency in the Construction Industry – Is it a Fallacy? Presented by: Todd Hohn Brian Roberts.
BIS Internship Summary Powerpoint Created by BIS Student Cylor Morgan (used with permission)
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
Landscape Business Concepts
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
Program Overview. Overview of Program Content to Date – Student satisfaction results Review of Train the Trainer Workshops – Trainer satisfaction results.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
1. Maintenance Alignment with District ‘s Mission and Board and Superintendent’s Goal 2. Impacts of recent budget reductions 3. Review Energy Grant 4.
Construction Estimating Using Excel Professor Locurcio CON4003, CVE4073, CVE5073.
THE COST OF MANUFACTURING How much does manufacturing cost?
Understanding the Estimate – Part 1 Foreman’s Development Series
INTD 54 estimating carpet. measuring for carpeting carpet layout/map saves money and time shows: exactly where each carpet piece goes yards of carpet.
Electrical Principles and Wiring Materials Original Power Point Created by Casey Osksa Modified by Georgia Agricultural Education Curriculum Office June.
Electrical Power Distribution. Forms of Energy All forms of energy fall under two categories POTENTIAL Stored energy or energy of position (gravitational)
Electrical Power Distribution. Forms of Energy All forms of energy fall under two categories POTENTIAL Stored energy or energy of position (gravitational)
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Pay attention as I present pay attention as I present slide layout and content slide layout and content pacing pacing references to book (or not) references.
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
SERVICE ENTRANCE EQUIPMENT
PROJECT MANAGEMENT Bedrock Learning, Inc Hemlock Drive Holland, MI USA Office: Facsimile:
Measurement and Payment
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
I CAN DETERMINE AND EXPLAIN THE IMPORTANCE OF CREATING A BUDGET AND HOW IT SUPPORTS GOOD FINANCIAL DECISION MAKING.
Agenda – JOC Gordian Construction Task Catalog Understanding the Construction Task Catalog ® (CTC) Calculating the Bid Contractor Adjustment Factors Risk.
Estimating and Scheduling CEE 492
CEE 492 Lab Session #1 February 3, CEE 492 RS Means –Introduction –Exercise ICE MC2 –Installation –Introduction and Overview Outline.
ELECTRICAL INSTRUMENTS ( service and utilization )
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
CEE 492 Lab Session #1 February 3, CEE 492 RS Means –Introduction –Exercise ICE MC2 –Installation –Introduction and Overview Outline.
© Prof. Awad Hanna1 Productivity Measurement. © Prof. Awad Hanna2 Productivity Definitions and Measurements Productivity = or  Example : 0.27 Work-hours.
Planning Electrical Circuits Original by Ryan Talton Modified by Georgia Agriculture Education Curriculum Office –June 2004.
Chapter 15 Electrical – HW #10
Planning Electrical Circuits
ERP = Enterprise Resource Planning
Planning Electrical Circuits
Smitty’s Two Minute Drill Mixed Content -05
PS&E – Plans, specifications and estimate
ASHRAE, California Title 24, NEC
Chapter 19 Electrical Plans.
ELECTRICAL ESTIMATING SOLUTIONS, PROVIDING BEST SERVICES IN AUSTRALIA.
Basic Principles of Estimating
PROJECT.
Utgangspunkt for PowerPoint presentasjoner
PROJECT.
Presentation transcript:

Objectives In the 1 st half of this Module we’re going to cover: The computerized estimating process. How a Contractor comes up with his Material Costs and Labor Units. The 2nd half of this module will look at how Labor Units give us a way to check our Install Rates. Are we installing our materials in the time given to us by the Job Estimate?

What’s the Point? As we’ve seen in other Foreman Development modules, the Job Estimate affects all other aspects of the Project: Job Estimate Job Budget and Cost Codes Project Buy-Out Monthly Job Cost Reports Schedule of Values Man-Loaded Schedule 2 Week Look-A- Head Pay Application

Estimating Software??

Estimating Software Functions

Advantages of Estimating Software

Estimating Material Costs Big ticket items like Light Fixtures or Switchgear are quoted as separate packages in the Estimate. Getting quotes on Bulk buys will save $$$$ Thousands of misc. electrical parts also have to priced as part of the Estimate.

TRA-SER SX

Computerized Take Offs

Main Floor Take Off

Accubid Job Summary

Electrical Assemblies

Estimating Labor

Labor Units Labor Units are expressed in man-hours for the installation of: E = One or per each item C = Per one hundred items C = Per one hundred linear feet of the item M = Per one thousand linear feet of the item LF = Per linear foot Labor Units vary by Jobsite conditions: Normal Difficult Very Difficult

What's in a Labor Unit? Non-productive Breaks Site Movement (People) Measuring & Layout Mobilization Actual Installation Time Gathering Materials Studying Plans Clean Up Receiving and Storing Materials 64% Efficiency – RS Means

Typical Labor Units Duplex Receptacle Panelboard ¾” GRC 500 MCM Feeders 30 amp Disconnect Surface mounted Shop Light 2’ x 4’ T-grid Light Fixture

What are your Labor Units? Your company had specific Labor Units that they used when they bid your job Did your crew make the Estimate when they installed that big rack of 4” EMT conduits? If you are not making your install rates you are in trouble!

Figure your Install Rate A 2 person crew was told to install 2,000 feet of 4” EMT. The NECA Labor Units for this material under normal conditions is 16 Labor Units per 100’ of conduit. 1.How many feet of conduit should one person install in an hour? 6.25 feet per man hour 2.How long should this entire task take? 320 hours 3.How much conduit should be installed by your 2 man crew at the end of 5 days? 500 feet per hour 4. One day I had 4 people running conduit. How many feet of conduit should they have put in? 200 feet

What’s Included? What is and isn’t included in the Labor Unit? Scope Work Operations NOT included Application Instructions

An Install Rate Example A 500’ long conduit rack with (4) 4” EMT conduits. Supports every 8’= 63 racks

Calculators

Tracking Labor Estimates by Area Some contractors will break their Estimate into small areas or phases –So their take- offs will show the total labor and materials quantities used in each of these small areas. This method gives the Foreman in the field a simpler way to track their labor in small, quantifiable work areas.

Extended Costs Extended Material and Labor Costs Description / SizeQuantityUnitMaterial Units costMaterial Result Labor Units (in Man hours) Labor Result (in Man hours) EMT 1/2"4330ft $1, EMT 3/4"4715ft $5, EMT 1 1/2"155ft $ EMT 4"350ft $4, EMT /2"5ea $ EMT-90 4"3ea $ PVC 3/4"80ft $ PVC 1"120ft $ PVC 1 1/2"60ft $ GRC-90 1/2"32ea.3.26$ GRC-90 1"44ea.5.25$ GRC /2"8ea.8.84$ Total $11, unit cost.05 man hours Material Prices per TRA-SER, 3/25/12, NECA Normal

Job Take-Off Activity Use the Extended Material and Labor Costs Handout Answer the following questions;

01 / Mobilization – Job site set up & removal: trailers, office, gang boxes, materials, etc. 02 / Demolition – Removals and demolition 03 / Site work – Underground, pole lights, temporary power, etc. 04 / Branch – conduit, boxes and wire; up to 1”. 05 / Feeders – conduit, boxes and wire; 1 ¼” and above. 06 / Gear – Switchgear, transformers, starters, disconnects, contactors, etc. 07 / Fixtures – receiving and installing any and all fixtures 08 / Special Systems – Security, fire alarm, PA, etc., including all conduit and wire - does not include sub contractor’s work. 09 / Devices – plugs and switches, trim plates, etc. 10 / Warranty Work

Job Budget The money from the Estimate is juggled around into various job categories and line items. Each of the Budget line items will include all costs involved; labor and materials, equipment, overhead and profit, etc. All of the line items will add up to the contract amount

Job Budget

A Job Cost Report Code Labor Hours Labor Costs Labor Spent % Labor SpentMaterial $$ Material $$ Spent % Material Spent Contract Amount %Total Spent 1 Jobsite set up20$600.00$ %$500.00$ %$1, % 2 Demolition107$3,210.00$2, %$0.00 0%$3, % 3 Site work132$3,960.00$4, %$1,107.00$1, %$5, % 4 Branch Circuits500$15,000.00$7, %$2,805.00$2, %$20, % 5 Feeders182$5,460.00$3, %$7,668.00$4, %$15, % 6 Gear66$1,980.00$ %$3, %$5, % 7 Fixtures495$14,850.00$12, %$98,941.00$80, %$130, % 8 Special Systems221$6,630.00$2, %$3,481.00$3, %$20, % 9 Devices102$3,060.00$2, %$683.00$ %$4, % 10 Warranty Work $0.00 0% $0.000% 11 General $4, % Totals1825$54,750.00$32, %$118,185.00$94, %$212, %

Production? Are you making your Labor rates??

Summary Anyone want to be an Estimator? Well, maybe not, but at least we have a better understanding of how they do their work We need to be more competitive! –In order to do that we need to be more productive. –System Productivity and checking our Labor Install Rates are tools we can use to help us do that.