1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.

Slides:



Advertisements
Similar presentations
Calcit Gospić Factory of calcite fillers Delivery and commissioning of medium and low voltage cabinets Elektro-Čelik d.o.o. Markovićeva 28 Križevci, Croatia.
Advertisements

 E4 Electrical Installation #1 Power Distribution.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
This Project consists of the following major elements Install new 15kV padmount switchgear Underground 15kV conduits and cable Underground Communications.
Major Underground Design John Perez. Underground Engineering Design Practices Three Phase Circuit –Infrastructure: Ductbanks & Manholes All three phase.
King Abdul Aziz University College of Engineering Electrical and Computer Department EE 454 SWITCHG.& PROT. OF PWR. SYS. Lectures Book Dr. ABDULRAHMAN.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Power Status Thomas Nehring Conventional Facilities Advisory Committee Review October 5-6, 2010.
Landon Roberts Lighting/Electrical Option 11/01/07 Medical Education Building Johns Hopkins University School of Medicine Electrical Systems Existing Conditions.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Flanders Electric – Engineering Division Welcomes Youto an Overview of Reconditioned Switchgear.
Interconnection of Distributed Generation
Utility Planning For North Campus Upgrades Area in and around Cook Physical Science Building Sal Chiarelli, Director of Physical Plant November 15, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Thomas C. Nehring, P.E. Lead Electrical Engineer CFAC Review November 9-10, 2009.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
ESS | Power System | | Frithiof Jensen ESS Power System Ion Source, Front-end.
Preliminary Studies of the Electric Power Distribution for CLIC
Pole Mounted Switch Disconnector NPS
Antenna Electrical Infrastructure Selection of OMT Design for the EVLA X-band Receiver Bob Broilo Electrical Engineer.
Electrical & High Temperature Utility Distribution Upgrade.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Transformer Taking the ratio of the two equations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
1 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion & CCW Piping Thomas F. Joos, PE Lead Civil/Structural Engineer CFAC Review March 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Utility Engineers, PC.  Generation  Transmission  Distribution.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Procurements Thomas C. Nehring, PE Lead Electrical Engineer Conventional Facilities Advisory Committee - Review.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
POWER HOUSE.
Distribution Systems-General
SERVICE ENTRANCE EQUIPMENT
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
A PRESENTATION On 400KV GSS SURPURA JODHPUR
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013.
This project on Primary sub station of Visakhapatnam port trust at Visakhapatnam. It is 132kv/11kv substation with incoming feeder from APTransco and 11.
Switches and Over Current Protective Devices Class Instructor ALPHER E. DE VERA, uap.
PPU TERANG HATI PROJECT POWER DISTRIBUTION ENGINEERING (EPEB453)
ELECTRICAL INSTRUMENTS ( service and utilization )
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Austin Energy Elevated Requests for High Reliability Service South West Electric Distribution Exchange (SWEDE) May 8, 2015 David Tomczyszyn, P.E. – Distribution.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Module 11 -Cost Estimation This module covers how to estimate project costs including: –Equipment costs – combination of procurement and installation (including.
Auto Transformer Current Flow. Principles of Auto Transformers H X H0/X0.
Update on the PSB Cooling and Ventilation Systems
POWER DISTRIBUTION & POWER LOSS REDUCTION METHODS
Sub Station.
Progress Briefing - Energy Initiative
SUB-STATIONS.
Chapter # 25 Sub-Stations risemark.pbworks.com.
CLIC Civil Engineering & Infrastructure Working Group Meeting
UMCP Learning Objectives
Power Generation and Distribution
35kV Assessment SWEDE 2007 May 10, 2007.
Engineering Project Cable Management.
Calculations: Transformers and Service Conductor Calculations
EET 323 – Electrical System Design Lecture 9: Grounding
Review of Distribution Network Protection
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer National Synchrotron Light Source – II Project October 18, 2006

2 BROOKHAVEN SCIENCE ASSOCIATES Electrical Utility Service BNL site has sufficient power available so there is adequate capacity to add all loads associated with NSLS II. Electrical power to the NSLS II is available from existing 69 kV to 13.8 kV substation 603 located near the intersection of Cornell Avenue and North Sixth street. Estimated peak load at full build out is 14 MW Estimated peak load for CWF expansion is 5 MW provided by a separate existing feeder. This takes into consideration 3600 tons of Chilled Water for NSLS II and 1200 ton for BNL site.

3 BROOKHAVEN SCIENCE ASSOCIATES BNL Site - One Line Diagram Feed to NSLS II

4 BROOKHAVEN SCIENCE ASSOCIATES Electrical Utility Service (cont ’ d) Upgrade to existing substation 603 will include: Modification to the existing 69 kV support structure. Relocation of two (2) 69 kV Potential Transformers. Minor Expansion of Building 603 by 350 square feet. Installation of firewall between existing transformer # 3 and new transformer. 69 kV SF6 Breaker. 20.0/26.7/29.9 MVA transformer A 15 kV overhead busway. 15 kV metal clad switchgear. 15 kV tie breakers.

5 BROOKHAVEN SCIENCE ASSOCIATES Building 603 Substation New Work

6 BROOKHAVEN SCIENCE ASSOCIATES Electrical Utility Service (cont ’ d) NSLS II 13.8 kV Power Distribution 600 A feeder consisting of 2 sets of 3-1/C 750 kcmil, 15 kV, 133%EPR copper conductors Conductors will be routed through an existing manhole and ductbank system from the new switchgear in building 603 to a new 6-way, 600 A 15 kV SF6 low profile pad mounted switchgear located on the NSLS II project site. A cable vault will be provided under the switchgear and a 12 way 5 ” concrete encased ductbank will tie the vault to existing manhole MH-E5.

7 BROOKHAVEN SCIENCE ASSOCIATES NSLS II Site Electrical Plan

8 BROOKHAVEN SCIENCE ASSOCIATES Electrical Utility Service (cont ’ d) NSLS II Site Distribution An 8-way 5 ” concrete encased ductbank will be routed from existing manhole MH-E5 to a new manhole in the infield of the Ring Building via a utility tunnel. A 6-way 5 ” ductbank will then be routed around the infield interconnecting all the substations at each of the service buildings. Two 600 A feeders will then be routed from the SF6 padmount switchgear into the Ring Building infield and around the infield providing a redundant on site primary radial distribution system.

9 BROOKHAVEN SCIENCE ASSOCIATES Electrical Utility Service (cont ’ d) One substation will be located at each of the service buildings 1-4. Two substations will be located at the service building 5 associated with the Central Lab office and the LINAC and RF buildings. Each substation will consist of: 15 kV outdoor non-walk-in metal enclosed switchgear. This will include two switches in parallel feeding the fused load switch. Fused load interrupter switch kV -480/277 V oil filled substation type transformer. Secondary air terminal section with 480V Breakers.

10 BROOKHAVEN SCIENCE ASSOCIATES NSLS II SITE - ONE LINE DIAGRAM

11 BROOKHAVEN SCIENCE ASSOCIATES Electrical Utility Service (cont ’ d) The 13.8 kV electrical distribution cable/ductbank infrastructure from the SF6 pad-mounted switch to the inside diameter of the Ring Building has been designed for a redundant 600 Amp feeder. Presently the base design includes a single feeder from Bldg. 603 substation to the NSLS II project site utilizing an existing ductbank. Estimates indicate that the cost of installing a redundant 13.8 kV 600 amp feeder to the SF6 switch in a new ductbank and installing a redundant substation transformer at each of the service buildings will cost approximately $2.1 million. This will provide complete redundancy from Bldg. 603 substation to the electrical equipment located in each service building. This will be evaluated as we approach CD-1 and review all the costs associated with the NSLS II project.

12 BROOKHAVEN SCIENCE ASSOCIATES Electrical Utility Service (cont ’ d) Chilled Water Plant Substation Expansion A new fused load interrupter switch will be added to the existing Switchgear 600A lineup. The existing two transformer substation yard will be expanded to include a third 7500 kVA 13.8 kV -4160/2400 volt transformer. A 5kV feeder will be routed in a ductbank to 5kV metal-clad switchgear within the Chiller Building expansion. A bus tie breaker will be installed in the new switchgear to electrically connect the existing 4160 volt bus to the new bus. This will ensure reliable power to the CWF expansion.

13 BROOKHAVEN SCIENCE ASSOCIATES CWF - ONE LINE DIAGRAM New Work