Space Debris Conceptual Design Review Cole Bostrom Corey Godwin Jonathan Kirchmaier Emily Logan Sean Murphy Seanna Renworth 9-23-08

Slides:



Advertisements
Similar presentations
Cameron Trussell, Elliot Guber, Joel Mendez, Brady Phillips, Branden Campbell, and Dushyant Dhundara Conceptual Design Review for “The Stabilizer”
Advertisements

Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney October 14, 2008.
Team Space Jam Conceptual Design Review Ben Azlein, Bridget Chase, Paul Guerrie, Taylor King, Shane Meikle, Megan Scheele, Jamie Usherwood 09/16/10 Fall.
Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
DYNAMO TEAM 2 CAREFUL HARRY CONCEPTUAL DESIGN REVIEW GLENDA ALVARENGA J.J. BUSSE EMILY EGGERS ADAM KEMP GABRIELLE MASSONE DALTON SMITH COREY WILSON SEPTEMBER.
TEAM kkkkk Conceptual Design Review Saad Alqahtani, Charles MacCraiger, Alexa Warly, Connor Jacobson, Kyle Skjerven, Matt Busby 09/19/11 Fall 2011 Rev.
Team 2 Careful Harry Glenda Alvarenga J.J. Busse Emily Eggers Adam Kemp Gabrielle Massone Dalton Smith Corey Wilson Dynamo Critical Design Review.
Team 7, Final Presentation December 1, Mission Overview Send up petri dishes containing bacteria Analyze the effects of temperature, pressure, and.
The Wright Stuff Conceptual Design Review Colton Hall, Brendan Lee, David Thomas, Zak Collins, Eli Nelson, Devin Bazata September 20th 2011 Fall 2011 Rev.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
Flight Club Critical Design Review Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams October 14, 2008.
BalloonSat “Optimism Prime” Team “Thumbs Up” Conceptual Design Review Nick Lenk, Greg Nelson, Eddie Cyrus, Jake Varey, Chase Pritchett, Brian Inglis 9/23/08.
Team D.S.R.O Taylor Boe Andrew Buckner Andrew Gilbert Gracie Harsha Emily Howard Bobby Stillwell September 23, 2008.
Khufu’s Starship Jennifer Nill Chelsea Donaldson Graham Risch Henry Shennan Jonathan Lumpkin Jennifer Nill Chelsea Donaldson Graham Risch Henry Shennan.
Paul “Trey” Karsten Marcell Smalley Shunsuke Miyazaki Brynn Larson Terek Campbell Marcus Flores 11/25/09 Final Revision.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn October 17, 2006.
Team Helios. Mission and Experiment Mission: Launch a balloonsat to determine the light filtering effect of the atmosphere and test the effectiveness.
Team Space Jam Critical Design Review Bridget Chase, Shane Meikle, Jamie Usherwood, Ben Azlein, Megan Scheele, Taylor King, and Paul Guerrie October 5,
Cameron Trussel, Elliot Guber, Joel Mendez, Brady Phillips, Branden Campbell, and Dushyant Dhundara Conceptual Design Review for “The Stabilizer”
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
Space Debris Critical Design Review Cole Bostrom Corey Godwin Jonathon Kirchmaier Emily Logan Sean Murphy Seanna Renworth October 14, 2008 Fall 2008 Rev.
Garlic Armageddon BioSat Lauren Persons, Ryder Whitmire, Lenny Komow, Kirstyn Johnson, Jon Pfohl, Dave Borncamp October 6 th 2009.
GONS Final Presentation Steven Benedict Jake Danser Josh Hecht Brock Kowalchuk Erik Shuttlesworth Matthew Zemel December 4, 2007 Steven Benedict Jake Danser.
Panoramic Rays Conceptual Design Review Brian Gonzales, Kaia Jerde, Harrison McLean, Anirudh Sarsam, Brett Traub, Matt Capron September 20, 2007.
Skillz That Killz Team 3 Conceptual Design Review Travis Dowdy, Jocelyn Mulkey, Hunter Hoopes, Taylor Smith, Kaitlyn Zimmitti, Jess Davidoff September.
Team R3D3 Conceptual Design Review Henk Wolda Kate Kennedy Greg McQuie Nicole Ela Marisa Antuna Devon Campbell Tyler Smith 9/20/2011.
GloboGym Fighting Cobras Conceptual Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards September 21, 2006 Project.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Oddballs Critical Design Review Team 8: Grant Fritz, Jessica Brown, Stephanie Jalovec, Jennifer McGraw, Brian Roth, Evan Townsend 10/18/07.
Conceptual Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani September 21, 2006.
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Conceptual Design Overview
Thomas Jeffries, Anthony Anglin, Dylan Cooper, Dustin Fishelman, Colin Harkins, Joao Mansur, Starteya Pais, Andrew Trujillo 10/2/2012.
SPIRIT of the Koala Project VOLT Critical Design Review Anthony Anglin, Colin Harkins, Dylan Cooper, Thomas Jefferies, Starteya Pais, Joao Mansur, Andrew.
Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams September 23, 2008 Fall 2008 Rev A
Chelsea Welch Tully Baetz Colin Nugen Elisabeth Moger Charles Hartman Anthony Cangelosi.
Chelsea Welch Tully Baetz Colin Nugen Elisabeth Moger Charles Hartman Anthony Cangelosi.
Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney September 23, 2008.
Zachary Cuseo, Sydni Smith, Andrew Fruge’, Tyler Knappe, Christopher Nie, and Shweta Maurya 8 October 2009.
Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams November 11, 2008.
Team Magnaritaville Conceptual Design Review Zachary Cuseo, Andrew Fruge, Shweta Maurya, Sydni Smith, Christopher Nie, Tyler Knappe 9/22/09 Fall 2009 Rev.
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
Napoleon Connor Strait | Chris Gray | Chad Alvarez Akeem Huggins | Ashley Zimmerer Tucker Emmett | Ginny Christiansen |Caleb Lipscomb Conceptual Design.
Victor Taberski, Ryan Walker, Allen Marshall, Matt Kerwin, Andrew Winthrop, Steven Ramm October 14, 2008 UANIOOU – (Upper Atmosphere Near-Infrared Optical.
GONS Critical Design Review Steven Benedict Jake Danser Josh Hecht Brock Kowalchuk Sean Pomeroy Erik Shuttlesworth Matthew Zemel October 17, 2007 Steven.
Cole Bostrom, Corey Godwin, Jonathon Kirchmaier, Emily Logan, Sean Murphy, Seanna Renworth Rev D.
Space Monkeys Conceptual Design Review Project Curious George Michael Bartek, Jacob Blakely, Katelynn Finn, Katie Fletcher, Lance Markovchick, Michael.
Team Hubble Jr. Critical Design Review Ryan Del Gizzi, Evan Levy, Kyle Norman, Chris Everhart, Holly Zaepfel, Rachel Small October 17, 2006.
PROJECT SCREAM PROPOSAL Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse
Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong 05 October 2010.
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Quinn Kostelecky, Vincent Staverosky, Gloria Chen, Roshan Misra, Jacqueline Godina, Raymond Auyeung Fall 2011 Rev A/B
Spring REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL (RFP) NUMBER: 2500-SP03 FOR DESIGN CONCEPT OF THE Balloon Satellite (BalloonSat) PROPOSALS ARE.
Junk in a Box Critical Design Review
Mission Statement... The Space Wolverines will;
Team S.H.I.E.L.D. Final Presentation
Skillz That Killz Team 3 Final Presentation
Team Go Go Gadgets Launch Readiness Review
Team Thumbs Up Final Presentation
S^3 Launch Readiness Review
Clean Air Project: Team Big Green SpaceGasm Conceptual Design Review
Space Debris Critical Design Review
Gateway To Space T+3 ASEN / ASTR 2500 Class #25
Team Solkraft Conceptual Design Review
Team Mate Conceptual Design Review
Team Munchies Conceptual Design Review
Team SCREAM Launch Readiness Review
Proposal Team 8: Grant Fritz, Jessica Brown, Stephanie Jalovec, Jennifer McGraw, Brian Roth, Evan Townsend.
Presentation transcript:

Space Debris Conceptual Design Review Cole Bostrom Corey Godwin Jonathan Kirchmaier Emily Logan Sean Murphy Seanna Renworth

Mission Overview Our objective is to conduct scientific analysis of near space conditions by imaging stars through the means of a timed extension of the mechanical platform with a mirror cluster attached at the end in order to obtain pictures at many angles. Our objective is to conduct scientific analysis of near space conditions by imaging stars through the means of a timed extension of the mechanical platform with a mirror cluster attached at the end in order to obtain pictures at many angles. We plan to discover how to build the mechanical systems needed to extend a platform with a cluster of mirrors on the end. This mission will hopefully give us the ability to learn about the near space environment and many new technological skills involving the mechanical platform deployment. The mission will also help us discover how to retrieve the mechanical platform back into the satellite before landing in order to keep the mirror from being damaged. We plan to discover how to build the mechanical systems needed to extend a platform with a cluster of mirrors on the end. This mission will hopefully give us the ability to learn about the near space environment and many new technological skills involving the mechanical platform deployment. The mission will also help us discover how to retrieve the mechanical platform back into the satellite before landing in order to keep the mirror from being damaged. We are doing this mission for the challenge of the extendable arm and the possibility of better images of stars. We are doing this mission for the challenge of the extendable arm and the possibility of better images of stars.

Design The BalloonSat shall be a basic rectangular prism shape. A plastic tube shall be placed through the center of the cube, top to bottom. The BalloonSat shall be a basic rectangular prism shape. A plastic tube shall be placed through the center of the cube, top to bottom. The center of one exterior wall shall contain a double door that shall be connected by internal hinges and shall be pushed open by the extending mechanical platform. The center of one exterior wall shall contain a double door that shall be connected by internal hinges and shall be pushed open by the extending mechanical platform. The open door shall allow the camera to see out of a plexi-glass window. The open door shall allow the camera to see out of a plexi-glass window. After the mechanical platform is deployed, a mirror cluster connected to the end shall allow the camera to capture a wide representation of what is visible at 30 km. After the mechanical platform is deployed, a mirror cluster connected to the end shall allow the camera to capture a wide representation of what is visible at 30 km. The mechanical platform shall be along the bottom of the BalloonSat when not deployed. A set of gears run by a simple motor and timing circuit shall deploy and retract the platform. The mechanical platform shall be along the bottom of the BalloonSat when not deployed. A set of gears run by a simple motor and timing circuit shall deploy and retract the platform. One heater with a central location shall keep the internal BalloonSat temperature above zero degrees Celsius. Other systems including the HOBO data logger and timing circuit shall be placed accordingly to counter the weight of the camera and mirror. One heater with a central location shall keep the internal BalloonSat temperature above zero degrees Celsius. Other systems including the HOBO data logger and timing circuit shall be placed accordingly to counter the weight of the camera and mirror.

Drawing of Design

Functional Block Diagram HOBO logger Temperature-internal and external Humidity Heater Power (9V Batteries) Switch Heater 1 Camera Camera Power Switch Timer Power (12V battery) 555 Timer Platform Deployment Motor Motor Power (9V batteries) Switch

How we are going to complete our mission By assigning leaders to key parts of our Balloonsat’s construction we are all able to help on each part while the 2 leaders of that part specialize in the given area. By assigning leaders to key parts of our Balloonsat’s construction we are all able to help on each part while the 2 leaders of that part specialize in the given area. By following our schedule and adding more meetings if needed, we will be able to have a complete and tested BalloonSat ready for launch. By following our schedule and adding more meetings if needed, we will be able to have a complete and tested BalloonSat ready for launch.

Management Structure Leads: Cole Bostrom, Corey Godwin Electronics Leads: Emily Logan, Seanna Renworth Science/Mechanical Leads: Sean Murphy, Jonathan Kirchmaier

Schedule Team Schedule of Events: Week of September 22-28: Week of September 22-28: Complete design and prototype 9-22 Conceptual Design Review 9-23 Week of September 29- October 5: Week of September 29- October 5: Acquire Authority to Proceed and order all hardware by 10-2 Begin building payload and payload systems 10-3 Week of October 6-12: Week of October 6-12: Structure tests begin 10-8 Review A due, payload systems complete Week of October 13-19: Week of October 13-19: Continue structure and begin systems testing Critical Design Review, Review B due Week of October 20-26: Week of October 20-26: In-class demo of current BalloonSat Begin cold tests and testing final design Week of October 27- November 2: Week of October 27- November 2: Continue testing final design LLR cards assigned Week of November 3-9: Week of November 3-9: BalloonSat complete 11-3 In-class mission simulation test 11-4 Continue in-class mission simulation test, Review C due 8:00 a.m., LLR cards due in class 11-6 Week of November 10-16: Week of November 10-16: Pre-launch inspection and Launch Readiness Review Final weigh in and turn in Launch at 7:30 a.m Week of November Week of November Analyze data from mission in class Begin Final Report Week of November Fall Break Week of November Fall Break Week of December 1-6 Week of December 1-6 Final Team Presentation and report, Review D due 12-2 ITLL Design Expo 12-6

Budget Weight Weight ComponentWeight (grams) Foam Core125 g Structure Adhesive20 g Mirror Cluster 50 g Camera220 g HOBO34 g Heater g Timer33.6 g Insulation20 g Eyebolts (2)5 g Anti abrasion bushings (2)5 g Tube10 g Door Spring Hinges (4)20 g Motor-gear system150 g Platform75 g Guiderails10 g 9 V Batteries (3)138.3 g 12 V Battery (1)7.3 g Switch (2)11.4 g Total: grams

Budget to_ dollar-sign.jpg ItemCost (dollars) Aluminum IsogridProvided Foam coreProvided InsulationProvided Adhesive (hot glue, aluminum tape) Provided Heating System (1)Provided 555 Timer (1)Provided Canon A570IS Digital Camera (1) Provided HOBO H data logger (1) Provided Central tube for flight string (1) Provided Anti-abrasion bushings (2)Provided Batteries (9V and 12V)Provided Spring Hinges (4)$4.54 Mirror (2)$2.80 Simple Motor (1)$12.00 Guide Rails (2)$10.00 Small Mounting Platform (1)$50.00 Spare Parts; second motor, extra hinges, mirrors $17.07 Total Cost$96.41

Our Worries Time… Time… Our team is worried that we will not have enough time to complete building our BalloonSat and running the tests on it. Our team is worried that we will not have enough time to complete building our BalloonSat and running the tests on it. BalloonSat not functioning properly… BalloonSat not functioning properly… Our team is also worried that our BalloonSat will not function or our science will not work. Our team is also worried that our BalloonSat will not function or our science will not work.