I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Air Force Facility Energy Program 1 Rick Stacey, PE, CEM HQ AFCESA.

Slides:



Advertisements
Similar presentations
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Enhanced Use Lease Components, Terms and Conditions Mr. Allan Curlee.
Advertisements

Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
2011 ADC WINTER FORUM | PAGE 2 Army Energy - A Player in the New California Gold Rush Leveraging Private Financing for Increased Renewables Ms. Aubris.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e AF Facility Energy Perspective 1 David J. Bek, P.E. Energy Director AFCEC/CN.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Peter Y. Flynn, September 16, 2014 Utilizing ESPC to Develop Renewable.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
1 Frederick R. Broome, Jr., P.E. Director, Installation & Environment Division On behalf of the MCLBA Energy Team of Hubert “Ski” Smigelski, Lt. Cmdr.
Energy Efficiency in Barbados Ministry of Finance, Economic Affairs & Energy 5 August, 2008.
NARUC 2015 Winter Meeting February 16, 2015 Combined Heat and Power and the Clean Power Plan Bruce Hedman Institute for Industrial Productivity.
Program Name or Ancillary Texteere.energy.gov June 16, 2011 Soudeh Motamedi IBM Contractor, DOE Sustainability Performance Office Year-End Sustainability.
Renewable Energy in Islamic Republic Of Iran
2011 ADC WINTER FORUM | PAGE 1 Developing Renewable Energy Projects on DoD Land Mr. Alan D. King Assistant Secretary of the Army for Installations, Energy.
Energy Security & Resiliency A Conceptual Plan to Provide Affordable Infrastructure Resiliency, while Ensuring Persistence of Mission Capabilities within.
Event Location Event Date and Location ADC WINTER FORUM | PAGE 2 The Power of EUL Air Force Enhanced Use Lease Program Update Brian Brown, Air Force.
Buying Electricity and Natural Gas for a BIG User Joan Kowal Energy Manager, UMCP March 6, 2012 Sustainable Tuesdays Speaker Series.
Energy Efficiency and Arizona’s Energy Future Jeff Schlegel Southwest Energy Efficiency Project (SWEEP) April
Green Municipal Funds – Case Study of Success Tracey Forrest Program Manager, Energy York Region November 16, 2004.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 “To BRAC or Not to BRAC” What happens if there is not a BRAC? ADC.
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
Engineering Technology Division
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Lori Singleton Manager, Sustainability Initiatives and Technologies September 15, 2010 SRP’s Sustainability Initiatives and Programs.
2 Located within the Naval Petroleum Reserve No.3 (NPR-3), RMOTC –Operates in an oil field environment –Explores solutions to energy issues –Demonstrates.
1 Solar Integration Strategy | Hosted and Sponsored by Nike Corporate Headquarters 25 Years of Chapter History 2008 Symposium Facilities Management for.
UNCLASSIFIED “It’s All About the Soldier” Net Zero – Energy Initiative Prepared by: Todd A. Dirmeyer Energy Manager 7 August 2012 Thanks to: DASA- I,E&E.
Program Name or Ancillary Texteere.energy.gov Federal Energy Management Program Safe, Secure, and Sustainable Facilities May 13, 2010 Richard Kidd Program.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
Contract Mechanisms and Project Structures to Implement Energy/Water Projects February 24, 2010.
Developing and Integrated Energy Conservation and Renewable Strategy Renewable Energy Leadership Summit June 7, 2005 Lenox, MA.
BMT Designers & Planners 1 Wind Farm Technology: Is it the Answer? National Defense Industrial Association (NDIA) 30 th Environmental and Energy Symposium.
Federal Energy Management Program Renewable Working Group Renewable Power Purchases at Federal Facilities By David McAndrew Federal Energy Management Program.
Army Power and Energy Presentation to: The Southern Solar Summit
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Engineering and Support Center, Huntsville Executive Order 13693: Federal Sustainability in the.
Phoenix Convention Center Phoenix, Arizona Evolution of Energy Services Integrated Energy TrackIntegration of the Energy Industry Nicole Bulgarino Ameresco.
Phoenix Convention Center Phoenix, Arizona Overview of the ESTCP Energy & Water Program Technology Track Overview of Federal Technology Demonstration Programs.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Integrated Energy TrackIntegration of the Energy Industry.
Selecting Renewable Projects at Colorado Springs Utilities APPA Conference John Romero GM Acquisition, Engineering and Planning October, 2009.
2013 ADC INSTALLATION INNOVATION FORUM | PAGE 1 How to Determine to Pursue an EUL or PPA Mr. Brian Brown Chief – Air Force Strategic Asset Utilization.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
RDL Utility Based Financial Incentives for Renewable Energy & Energy Efficiency in New Zealand EGNRET Workshop Honolulu, Hawaii, USA 30 March – 1 April,
0 This document is confidential and is intended solely for the use and information of the client to whom it is addressed. Public-Public and Public-Private.
Phoenix Convention Center Phoenix, Arizona An Introduction to EO Track 4Sustainability Brad Gustafson, P.E., LEED-AP Federal Energy Management Program.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Renewable Energy Challenges -an Air Force view 1 Ken Gray Energy Rates.
2013 ADC INSTALLATION INNOVATION FORUM | PAGE 2 Energy Security Air Force Civil Engineer Center Perspective Mr Billy P. Webb, P.E. AFCEC/COSC January.
Phoenix Convention Center Phoenix, Arizona Retained Energy Savings: A Success Story Track 1 Retained Energy Savings: Putting It into Practice Don JUHASZ,
Goal – 1384 GWh - Equivalent of 2.5% of Federal facility electricity use by 2005  equals about 500 MW of wind (at 31% Capacity Factor) June GWh.
The Peculiar Economics of Federal Energy Management Michael E. Canes USAEE Annual Conference October 26, 2015.
New York State System Benefits Charge (SBC) – NGA Center for Best Practices April 29, 2004 Bob Callender Vice President for Programs NYSERDA.
Overview of San Diego Climate Action Plan Nicole Capretz Director of Environmental Policy iMayor’s Office.
Phoenix Convention Center Phoenix, Arizona. Energy Exchange : Federal Sustainability for the Next Decade Energy Efficiency, then Renewable Energy (EERE)
Sustainability Elements of the ARRA, and Getting the Most out of Stimulus Funding Jeannie Renne-Malone, LEED AP National Director – Climate Change & GHG.
1 Louisiana: Our Energy Future 2009 American Recovery & Reinvestment Act.
11 Regional Renewable Energy Study Review of Findings and Forecasts Presented to: Climate, Energy and Environment and Policy Committee Metropolitan Washington.
Purchasing Renewable Power/RECs in the Federal Sector Federal Environmental Symposium May 4, 2006 Chandra Shah, NREL ,
A Road Map to Energy Savings: Elements of a Comprehensive Energy Plan Presented by: Kenny Esser, Senior Associate June 18, 2014 Passaic County Division.
Transforming Renewable Energy at the U.S. Department of Energy OFEE Symposium East – June 2008 Anne Sprunt Crawley U.S. Department of Energy.
1 Guidance on Renewable Energy in Federal Facilities under EO and EPACT 05 June 5, 2007 Anne Sprunt Crawley Federal Energy Management Program Energy.
US Army Corps of Engineers BUILDING STRONG ® Capital Investment Strategy (CIS) to Achieve Total Netzero Energy, Waste, and Water Porscha Porter USACE Engineering.
DRAFT Status Report: Five-Year Energy Plan Town of Athol January 2013.
Massachusetts Clean Energy Center Budget Overview
APTA Sustainability Workshop 2016
FUEL CELLS.
Army Engineer Association Engineering & Energy Track 16 June 2015
APTA Sustainability Workshop 2016
NAVFAC SOUTHWEST RENEWABLE ENERGY PROGRAM Joint SAME/SMPS-OC Breakfast August 26, 2010 Nathan Butler, PE NAVFAC Southwest Renewable Program Office
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Tennessee Valley Authority – Energy Initiatives and Challenges
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Air Force Facility Energy Program 1 Rick Stacey, PE, CEM HQ AFCESA Energy Division 29 Feb 2012

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 2 Overview Physical Plant, Energy Cost and Usage Goals and Mandates Air Force Facility Energy Strategy Programs Capital Investment Renewable Energy

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e $255B PRV Nearly the GDP of Peru 10M Acres of Land Twice the size of New Jersey As of FY99/4 75,800 Homes Arlington/Alexandria Combined 69,500 Dorm Rooms 1 ½ times Doubletree Hotels Family Housing Airfields 102 Million Square Yards 152 x DFW Airport Dormitories Plant Replacement Value 626M Sq Ft of Buildings 88 x Microsoft Corporation 1.5 x GM Facilities 3 Physical Plant Profile Air Force Installations 3 We Must Reinvest in Air Force Installations – A Force Enabler Land

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e Facility Energy Use/Cost SOURCE: FY11 ANNUAL ENERGY MANAGEMENT REPORT TO CONGRESS FY11 ENERGY USE FY11 ENERGY COST ($000) $1,077, , BBTU $1,034, in FY10 4.1% increase From FY10 65, BBTU in FY10 2.1% Decrease From FY10 4

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e Goals and Mandates 5 Goal TitleDriverBaseline (FY) Annual Target Final GoalGoal (FY) Reduce Facility EnergyEISA %30%2015 Reduce Facility EnergyEO %37.5%2020 Reduce Greenhouse GasesEO %35.1%2015 Renewable Energy UseEPAct %7.5%2013 Renewable Energy UseUSC %25%2025 On-Base Renewable EnergyAF %2012 Reduce Water UseEO %16%2015 Reduce Industrial Water UseEO %20%2020 Audit Covered FacilitiesEISA %100%2012 Meter Facilities (elec)EPAct %2012 Meter Facilities (gas/steam)EISA %2016 EISA 07 = Energy Independence and Security Act of 2007 EPAct 05 = Energy Policy Act of 2005 EO = Executive Order USC 2911 = Title 10, US Code – Sec 2911

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 6 Facility Energy Cost Trend Over the last 17 years: AF Utility Costs creep upward: 35% consumption reduction does not overcome 92% unit cost increase 35% consumption reduction does translate to $579M cost avoidance in FY11 92% 24% Usage in Trillion BTUs 35% Usage & costs in these charts include everything that crosses the fenceline

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e AF Facility Energy Strategy Reduce demand, increase supply and change culture Meet energy mandates (statutory, executive orders, AF/DOD) Improve ‘creature comfort’ and help provide energy security (both of which enhance mission accomplishment) Make wise investments in reliable infrastructure to build sustainable installations Leverage funding sources: ECIP, NRG, AFSO21, ARRA, etc Seek best Return on Investment for every dollar we spend Mitigate risk by leveraging third party funding Power Purch Agreements (PPAs); Enhanced Use Leases (EUL) Energy Savings Performance Cont (ESPCs) Utility Energy Services Cont (UESCs) 7

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e Air Force Facility Energy Center 8 Drive facility energy reduction, Leverage RE investments, Exploit utility cost savings, Improve utilities infrastructure Drive facility energy reduction, Leverage RE investments, Exploit utility cost savings, Improve utilities infrastructure

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e UP System Evals UP Execution Post-award Mgt ES Assessments >$287M Cost Avoid Util Privatization RE Assessments RE Development Central REC Buys Utility Contr Rvws Rate Negotiations Rates, Renewable Energy Data Program Analysis Advanced Meters REM program Awareness Conservation Invest strategy Energy Focus $ ECIP Energy Audits/SIAs ESPC/UESC Capital Invest 9 OPR: Mr. Mike Rits, P.E., CENI, DSN OPR: Mr. Ken Walters, P.E., CENE, DSN OPR: Mr. Ken Gray, P.E., CENR, DSN OPR: Mr. Bob Majka, CENU, DSN Facility Energy Programs

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e Capital Investment Program Management Two goals: Save $$ and meet mandates Prioritize within each allocation by SIR * BTU (or Gal) Target meeting all AF Infrastructure Energy Strategic Plan goals and Federal mandates AFFEC Charter: centrally manage investment programs based on corporate Capital Investment Strategy (CIS) Bases/audits identify investment opportunities (SIR >1) AFFEC validates and prioritizes (SIR * BIR) AFFEC tracks obligations/execution 10 Central Management drives unity of effort to achieve AF mandates

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e Energy Conservation Projects Types FY11 Funded Mix of Energy Conservation Projects 11

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e Renewable Technologies Solar Wind Biomass Landfill Gas Geothermal Ocean Hydropower Waste to Energy Ground Source Heat Pumps 12

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e Renewable Energy Goals and Strategy First Tier: Develop on-site renewable resources Renewable Energy Purchase Agreements (REPAs) or Enhanced Use Lease (EUL) Utility/Third Party Funded Direct AF investment (limited) Second Tier : Procure RE from off-site sources; delivery over the off-base grid Third Tier : Purchase RE Certificates (RECs) Replacement RECs Goal Attainment (phasing out in 2013) 13 PROGRAM ON TRACK TO ATTAIN ALL RENEWABLE GOALS

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e Renewable Energy Fiscal Strategy Requirements AF APPROACH: USE THIRD-PARTY INVESTMENTS TO MEET GOALS 14

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e Renewable Project Development Feasibility Study: Looks at RE types e.g. wind, solar, biomass, etc. No base specific info- land available, mission, siting Opportunity Assessment: IDs Base requirements e.g. mission impact, environmental, land availability, incentives, how much power can be used … Business Case Analysis: crunch the numbers … project details, e.g. costs, method of execution, simple payback … 15

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e Operational Renewable Electrical Energy Projects PV Wind Numbers indicate rounded MW capacity 1 FE Warren Hill Mt Home Buckley March Fresno LA Nellis Luke Perry Toledo JB MDL Cape Cod OCONUS Ascension 3 LFG/ Biom 16

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 15 1 FY10-13 Renewable Electrical Energy Projects PV Wind LFG/ Biom Numbers indicate rounded MW capacity 3 6 Beale Vandenberg Sheppard Eglin MMR Eldorado D-M Robins Edwards Luke Dyess AC JB MDL Goodfellow McConnell Academy Cheyenne 1 Creech 1 Stewart Nellis 15 17

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 1,022 MW On the Horizon Planned FY 18 AFRPA: EUL Pipeline AFCESA: PPA & Direct AF Investment Energy SourceProjects Total # Capacity MW Photovoltaic (PV)6610 Natural Gas3*TBD Energy SourceProjects Total # Capacity MW Photovoltaic (PV)1251 Biomass125 Waste to Energy15.4 Wind660 Landfill Gas16.6 RE GAME PLAN 610 MW 148 MW * Not RE, In-Kind Consideration could be PPA 758 MW

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e Energy Security Energy Security (ES) Definition QDR 2010 – “Energy security for the DoD means having assured access to reliable supplies of energy” A part of Mission Assurance A multitude of parts, but boils down to sustaining critical operations How AF tackles ES will depend on additional guidance Critical mission backup power systems Electrical system resiliency, reliability, and efficiently Economics – Putting a price on risk Mission requirements and predicted duration of potential interruptions will drive assets needed 19

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e Summary Comprehensive strategy Meet legislative mandates for conservation/etc Restrain future costs to extent possible Enhance energy security Fiscally responsible balanced portfolio Fund projects with solid business case…Savings to Inv Ratio But also ferret out the energy savings…BTU to Inv Ratio Highly dynamic program Energy surfacing at all levels of DOD and Fed Govt Adapt to evolving requirements and new technologies Focus resources to best support Air Force needs 20