Departement Mobiliteit en Openbare Werken Maritieme Toegang AMORAS Antwerp Mechanical Dewatering, Recycling and Application of Sediment Ir Joris Dockx.

Slides:



Advertisements
Similar presentations
Blue Gate Antwerp Open days Partners + location 2.
Advertisements

Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
Inner Harbor Navigation Canal Lock Replacement Project.
1 Dredging Phases 4 phases –excavation –lifting –transportation –disposal Guide 4: Machines, Methods and Mitigation; Chapter 2: Phases of a Dredging Project;
UMR = Balance of Environment and Transportation 1. Pool # 8 - Environmental Management Project 2. Transportation Route – human habitation & settlement.
Quantification of sediment concentrations and fluxes A comparison between optical and acoustic measurements Utrecht, 11 June 2013 – Emile Lemey.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
CEDA Prof. Em. Eng. J.J. Peters | Consultant Engineer Morphological Dredging a tool to improve nature values in rivers and estuaries?
Ross By-Pass Tunnel Cleanup Pre-Bid Project Overview May 2014
Fox River Cleanup Operable Units Fox River Cleanup Total river 39 miles long, OU 2 – 5 is about 13 miles PCB contamination Combined Remedy: Prospective.
CEDA DREDGING DAYS 2008 ANTWERP DEBATE ON LENGTHY, COMPLEX and SUSPICIOUS DECISION-TAKING PROCESS IN DREDGING and RECLAMATION PROCESSES THE POINT OF VIEW.
What is an In Lieu Fee Program ? Clean Water Act - Section 404 : “no overall net loss” of wetland acreage and functions. One mechanism for providing Compensatory.
DREDGING YOUR DOCKS 2014 Organized By CRA Hydrographic Surveyors Orion Marine Group.
Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101.
The situation in Norway concerning sediments/dredging Tore Lundestad, Port of Borg, Norway.
Prepared for: Prepared by: A Tutorial for Identifying a Project-Specific Dredged Material Placement Site October 2012 Bill Goodfellow Kaitlin McCormick.
Period 3 Kiana Brayton Lyle Swallows
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.

Developing a Space-Focused Systems Engineering Curriculum W. Fowler The University of Texas at Austin Texas Space Grant Consortium L. Guerra Exploration.
Henning Roedel Civil and Environmental Engineering Department Stanford University November 25, 2008.
Award of Invitation for Bid Y8-139-PD Residential Solid Waste and Recycling Collection Services Utilities Department Solid Waste Division February 26,
TIDE Estuaries: Elbe, Humber, Scheldt & Weser Kick-Off Conference in Antwerp 18 th February 2010.
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
Brownfields: Real Property, the expansion or redevelopment, or reuse of which may be complicated by the presence or potential presence of contamination.
1 Acid Tar Lagoon Remediation DEC solidification plant Ertvelde Belgium.
SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.
Qikiqtani Inuit Association Nunavut Water Board Technical Meeting and Pre-Hearing Conference January 16 th and 17 th, 2013.
TIDE | Heinz Glindemann | Hamburg Port Authority Introduction to the TIDE Project Kick-Off Conference in Antwerp 18 th February 2010.
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
1 PARLIAMENT BRIEFING 08 AUGUST 2007 DRAFT NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE BILL.
The Good, the Bad and the Ugly Environmental dredging -Project challenges and success factors related to an ongoing environmental dredging project Andreas.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Chisinau, October 28-31, 2008 Ruxandra Floroiu,
MAXIMIZING THE ECONOMICS OF CLEAN WATER USING A HYDRAULIC DREDGE AND A MECHANICAL DEWATERING PLANT: CASE STUDY OF LAKE DELAVAN, DELAVAN WISCONSIN PIANC.
New alternatives for financing a river dredging project (Argentina)
Pine Mountain Lake Dredging Project Moffatt & Nichol Project Engineers Cooper Crane & Rigging, Inc. Contractor The Right Contractor Adaptability Communication.
Andrea Sonnino Research and Extension Branch FAO – Rome, Italy Tropical Agriculture Platform: progress report GCARD 2 Pre-Conference.
US Army Corps of Engineers BUILDING STRONG ® Walla Walla District Update LTC Timothy Vail Oct 15, 2014.
US Army Corps of Engineers BUILDING STRONG ® N ational D redging Q uality M anagement ( DQM ) P rogram PIANC USA, DREDGING 2012 SAN DIEGO, CA 24 OCTOBER.
Environmental Regulation.  Complex set of laws  Constantly changing  Cover: Release, treatment, storage and disposal of Hazardous materials Into air,

1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
PORT OF TACOMA. Request authorization to award Professional Services Agreement (PSA) No with Geomatrix; and PSA No with Hart Crowser for.
Environmental protection of the Rio de la Plata and its Maritime Front: Pollution Prevention and Control and Restoration of Habitats PROJECT: RLA/99/G31.
Tide from the viewpoint of ports Expectations and opportunities Toon Tessier Antwerp Port Authority.
EAHCP Permit Oversight Shaun Payne HCP Coordinator.
Eden North Carolina Coal Ash Spill Initial Emergency Response North Carolina Emergecy Management Conference Sunset Beach, NC, 2014.
© 2012 The MITRE Corporation. All rights reserved Presentation to Open Health Tools 18 February 2012 MITRE: A National Resource.
USDA -Natural Resources Conservation Service
Environment and Climate Change Presentation to the Nunavut Water Board Regarding Doris North Project Type A Water Licence Amendment Application Nunavut.
Entry Ticket: Environmental Issues and Standards
MARITIEM INFORMATIE KRUISPUNT MIK MARITIME SECURITY CENTER
ENVIRONMENT CONSERVATION AMENDMENT BILL
Pittsburgh (PA), USA, 2017 September 18th – 21st
Company Profile.
In The Name of GOD In GOD We Trust.
تقييس وجوده (ادر 202) الاستاذه : نوره الهلالي
Andrew Winters & Allison Tyldesley Niagara Region
Stormwater Best Management Practices
Project Goals and Timeline
UPGRADE MOORING FACILITIES JETTY NUSTAR TERMINAL GRAYS (LONDON) DESIGN, TENDER AND RISK MEETING DD 25 JANUARY 2017.
CETBC Cooperation in Education and Training for Blue Careers
Hydrographic awareness and the benefits of hydrography
CEDA DREDGING DAYS 2008 ANTWERP
Enhancing navigational safety in shipping lanes.
Key Hydrographic Objectives Action: Address Needs For Each Activity
Waterway Investment prioritisation
Brian McVey Environmental Engineering Manager HII-Ingalls Shipbuilding
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Departement Mobiliteit en Openbare Werken Maritieme Toegang AMORAS Antwerp Mechanical Dewatering, Recycling and Application of Sediment Ir Joris Dockx CEDA dredging days 2 October 2008

Departement Mobiliteit en Openbare Werken Maritieme Toegang Overview presentation AMORAS 1.History 2.Process 3.Naming 4.Partners

Departement Mobiliteit en Openbare Werken Maritieme Toegang Dredging needs - Yearly sedimentation –Major lock complexes 80%; –Sewagesystem; –spill during loading and discharge activities. - Sedimentation by shiptraffic “Best guess” TDM/year

Departement Mobiliteit en Openbare Werken Maritieme Toegang Terrestrial Underwatercel Sediment Containment site Aquatic Today History

Departement Mobiliteit en Openbare Werken Maritieme Toegang Terrestrial Underwatercel ? Sediment Containment site Aquatic Future

Departement Mobiliteit en Openbare Werken Maritieme Toegang Terrestrial Underwatercel Sandseperation and Mechanical dewatering Sediment Containment site Re-use Aquatic Today Future

Departement Mobiliteit en Openbare Werken Maritieme Toegang History prospection Lagoonfields Waaslandharbour (1989) Mech. dewatering beltfilterpress (1996) 2005 Underwatercel Delwaidedock (2003) Building of AMORAS (2008) 2010 Mech. dewatering chamberfilterpress pilottest (2000) Underwatercel Churchilldock (2007)

Departement Mobiliteit en Openbare Werken Maritieme Toegang State of affairs Past actions: –Prospection of dewatering technologies (1999) –Pilot test mechanical dewatering with chamberfilterpress (2000) –Comparison lagooning versus mechanical dewatering (2001) –Location study (2001) –Strategic Plan Right Bank (2002) –Pre design AMORAS (start of engineering sep. 2003) –Environmental impact study (2005) –Selection of candidates ( ) –Building and environmental licence ( ) –Invitation for tenders (2007) Future actions –Building AMORAS (2009 – 2010) –Exploitation AMORAS (begin 2011 for a period of 15 years) –Re-use filtercakes AMORAS asap.

Departement Mobiliteit en Openbare Werken Maritieme Toegang Location 10 km AMORAS Conference

Departement Mobiliteit en Openbare Werken Maritieme Toegang Dewatering area 20 ha Disposal area 30 ha Sandseperation area Piping 3.6 km Underwatercel

Departement Mobiliteit en Openbare Werken Maritieme Toegang Treatement proces

Departement Mobiliteit en Openbare Werken Maritieme Toegang Process related reuse

Departement Mobiliteit en Openbare Werken Maritieme Toegang First adventure of Suske and Wiske

Departement Mobiliteit en Openbare Werken Maritieme Toegang Partners Building administration:  Flemisch Government Administration, Department of Mobility and Public Works, Maritime Access. Stake holder: Port of Antwerp Contractor:  THV Jan De Nul - Dredging International (DEME), Envisan and DEC Engineeringbureau: TV MWH – Seghers Keppel Safety coördination: Coor nv Environmental Consulting: Bova M.C. nv