Tailing Dams – A Consultants Perspective

Slides:



Advertisements
Similar presentations
Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
EMS Checklist (ISO model)
Chris Dandurand, P.Eng Kiewit Infrastructure Group Large Hydro Perspective on the Permitting Process & Environmental Approvals.
EPA Regions 9 & 10 and The Federal Network for Sustainability 2005
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
OHSAS
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
EMS Auditing Definitions
ISO General Awareness Training
Quality evaluation and improvement for Internal Audit
Regulatory Body MODIFIED Day 8 – Lecture 3.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Quality Assurance/Quality Control Policy
BY: GROUP 2 Food Safety Regulations and Standards.
Purpose of the Standards
OHSAS 18001: Occupational health and safety management systems - Specification Karen Lawrence.
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
Promoting Excellence in Family Medicine Enabling Patients to Access Electronic Health Records Guidance for Health Professionals.
Protection Against Occupational Exposure
Approaches for forest certification System versus performance ? Presentation prepared by Pierre Hauselmann for the WWF / WB Alliance Capacity building.
Auditing an EMS for Conformance with EO 13423
MNR’s Role in Public Safety Around Dams –An Overview
Company Confidential Registration Management Committee 1 Asking the Right Questions Right Dale Gordon Aerojet Rocketdyne July 16, 2014.
Ship Recycling Facility Management System IMO Guideline A.962
Postgraduate Educational Course in radiation protection and the Safety of Radiation sources PGEC Part IV The International System of Radiation Protection.
Occupational Health and Safety
Authorization and Inspection of Cyclotron Facilities Inspections.
Company duties under the ISM Code
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
NO FRAUD LEFT BEHIND The Effect of New Risk Assessment Auditing Standards on Schools Runyon Kersteen Ouellette.
Important informations
ICAO Requirements on Certification of Aerodromes Module - 2
Hazards Identification and Risk Assessment
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Water Resource Management Company (WRM) Ministry of Energy Iranian Approach to Dam Safety - Practice - Achievements - Future plans.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 6-1 Chapter 6 CHAPTER 6 INTERNAL CONTROL IN A FINANCIAL STATEMENT AUDIT.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
Dispensary and Administration Site Information Presentation.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
ISO Registration Common Areas of Nonconformances.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Authorization and Inspection of Cyclotron Facilities The Authorization Process.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
Swedish Risk Management System Internal management and control Aiming to Transport Administration with reasonable certainty to.
ISM Code 2010: Part A - Implementation Malcolm Maclachlan.
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
OHSAS Occupational health and safety management system.
Visit us at E mail: Tele:
Roles & responsibilities Involving staff in safety management December 2015 Dr Emer Bell Integrated Risk Solutions.
Technology Services – National Institute of Standards and Technology Conformity Assessment ANSI-HSSP Workshop Emergency Communications December 2, 2004.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
Tailings Dam Stability

ISO/IEC
Auditor Training Module 1 – Audit Concepts and Definitions
MODULE 2 INTRODUCTION TO GOVERNANCE AUDIT
Training Course on Integrated Management System for Regulatory Body
Communication and Consultation with Interested Parties by the RB
Canadian Auditing Standards (CAS)
Operationalizing Export Certification and Regionalization Programmes
How to conduct Effective Stage-1 Audit
Presentation transcript:

Tailing Dams – A Consultants Perspective Harvey McLeod, P.Eng.

Where doe the Consultant fit in? Mine Manager Operations and Environment Tailings Manager Dam Construction Personnel Consultant 3rd Party Review QA/QC of construction First Nations Regulatory DESIGN OPERATION CLOSURE

Consultants Professional Responsibility Protection of health and safety of the public Protection of the Environment Meet all Provincial and Federal regulations and guidelines Meet Professional Practice Guidelines Be current with the State of Best Practices Application of best available technologies to reduce risk Sustainable design practices

Best Available Technologies Mt. Polley Panel Dry stack tailings Pits, underground Reduce water Other Closure: Remove ability to store water and create “natural landforms” Robust design (redundancies) Reduce gradients (beaches and no rockfill u/s of core Liners without drains No pipes in dams

Tailings Risk Reduction

We have Guidelines!! CDA and ICOLD CDA Dam Safety Guidelines CDA Mining Dams Bulletin ICOLD –Sustainable Design Bulletin ANCOLD Tailing Dam Design Guideline Mining Association of Canada Tailings Management OMS Manual Towards Sustainable Mining Audit Guideline APEGBC Dam Safety Review

Engineer of Record? Engineer of Record Relatively new concept Could be the Designer or Mine Personnel Difficult for tailings dams that can be operated over 40+ yrs Authority is difficult to make commensurate with the responsibility (e.g. operations) Designer of Record Clear distinction Can also be engineer of record

Consultants Responsibilities Dam Safety Inspection Visual check Instrumentation check Water management check Recommendations Dam Safety Review APEGBC Guideline Audit type; Comprehensive; or Detail Design and Multidisciplinary

APEGBC Dam Safety Review Assurance Statement  I have signed, sealed and dated the attached dam safety review report on the Dam in accordance with the APEGBC Guidelines. That report must be read in conjunction with this Statement. In preparing that report I have:   Check to the left of applicable items (see Guideline Section 3.2):   1. Collected and reviewed available and relevant background information, documentation and data 2. Reviewed the environmental objectives for the materials stored in the impoundment and related design requirements 3. Understood the current classification for the Dam, including performance expectations 4. Undertaken an initial facility review 5. Reviewed and assessed the dam safety management obligations and procedures 6. Inspected the condition of the Dam, impoundment area and relevant areas upstream and downstream of the facility 7. Interviewed operations and maintenance personnel 8 Interviewed Engineer of Record 9. Reviewed available maintenance and operating records, the Operations, Maintenance and Surveillance (OMS) Manual and the Emergency Preparedness Plan 10. Confirmed proper functioning of mine waste and water management systems and environmental control systems 11. After the above, reassess the consequence classification, including the identification of required dam safety criteria 12. Carried out a dam safety analysis based on the classification in Item 11 13. Evaluated facility performance and conformance with design basis and operating criteria 14. Identified, characterized and determined the magnitude of deficiencies in the safe operation of the Dam and non- conformances in the dam safety management system 15. Recommended and prioritized actions to be taken in relation to deficiencies and non-conformances 16. Prepared a DSR report for submittal to the Regulatory Authority by the Owner and reviewed the report with the owner

APEGBC Dam Safety Review Assurance Statement Based on my Dam Safety Review, the Dam classification is: □ Appropriate □ Should be reviewed or amended   I undertook the following type of Dam Safety Review:  □ Audit □ Comprehensive □ Detailed design-based multi-disciplinary □ Comprehensive, detailed design and performance I hereby give my assurance that, based on the attached Dam Safety Review report, at this point in time:  □ The Dam is reasonably safe in that the dam safety review did not reveal any unsafe or unacceptable conditions in relation to the design, construction, maintenance and operation of the Dam as set out in the attached dam safety review report. □ The Dam is reasonably safe but the dam safety review did reveal non-conformances with the regulatory requirements with respect to the dam safety management systems as set out in section(s) ____ of the attached dam safety review report. □ The Dam is reasonably safe but the dam safety review did reveal deficiencies and non-conformances with the regulatory requirements with respect to the dam safety management systems as set out in section(s) ____ of the attached dam safety review report. □ The Dam is not safe in that the dam safety review did reveal deficiencies and/or non-conformances with the regulatory requirements which require urgent action as set out in section(s) ____ of the attached dam safety review report.

Consultants Responsibilities Third Party Review Independent of the Consultant Reports to Senior Management or other Stakeholders Presents an “opinion” on the Tailings Facility Design and operations

Challenges and Opportunities People Transfer of knowledge Teach “critical thinking” ???? - Belief in “models” Shortage of qualified Third Party Reviewers Engineer’s responsibilities commensurate with authority No. of Dams and Long Term Liability Closure land use to be consistent with FN values Need to move to landforms on closure

Challenges and Opportunities Clients Selection on cost, not risk Consultant has little control over operations and may have limited control in construction Technical capacity limitations and clear role definitions Regulatory Technical capacity Enforcement First Nations Trust Design for closure Communication and transfer of knowledge