Antamina Mine Water Management Model Alan Keizur Golder Associates Roberto Manrique Arce Compañia Minera Antamina User Conference 2006 Background The Antamina.

Slides:



Advertisements
Similar presentations
Land use effect on nutrient loading – nutrient models new assessment tools Inese Huttunen, Markus Huttunen and Bertel Vehviläinen Finnish Environment Institute.
Advertisements

LOGO Bangkok, May 2009 Water Resources Management in Ba River Basin under Future Development and Climate Scenarios Presented by: Nguyen Thi Thu Ha Examination.
4 th International Symposium on Flood Defence Generation of Severe Flood Scenarios by Stochastic Rainfall in Combination with a Rainfall Runoff Model U.
The Mekong River - survival for millions Lake Tonle Sap Mekong Delta Mekong Delta Wetland.
Engineering Hydrology (ECIV 4323)
US Army Corps of Engineers BUILDING STRONG ® USACE – ACF Operations Bailey Crane Water Management USACE, Mobile District.
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
Engineering Hydrology (ECIV 4323)
Alan F. Hamlet Dennis P. Lettenmaier JISAO Center for Science in the Earth System Climate Impacts Group and Department of Civil and Environmental Engineering.
Colorado Basin River Forecast Center Water Supply Forecasting Method Michelle Stokes Hydrologist in Charge Colorado Basin River Forecast Center April 28,
Reservoir and Diversion Data CBRFC Stakeholder Forum July 31, 2012.
Climate Change and Water Resources Management WEB pages on water management activities Max Campos San Jose – Costa Rica.
Green River Water Rights Distribution Model (MODSIM) Update By Division of Water Rights
Dr. David Ahlfeld Professor of Civil and Environmental Engineering The Westfield River Basin Optimization Model Demonstration:
The Application of a Real-Time Operational Water Resources Decision Support System (DSS) for the Orange-Fish-Sundays Water Transfer Scheme 18 th October.
Dr. R.P.Pandey Scientist F. NIH- Nodal Agency Misconception: A DSS takes decisions ---(No)
Klamath Basin Water Distribution Model Workshop. OUTLINE Brief Description of Water Distribution Models Model Setups Examples of networks and inputs Demand.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Background:Project Background * Work Statement * Relevance Study Area Methodology:Past Studies Data Preparation *? Actual Data Adjustments * Modeling Procedure.
Jericho Aquatic Discharge Assessment Presented by: Bruce Ott, Senior Environmental Scientist, AMEC Earth & Environmental.
Deksyos Tarekegn National DSS Specialist - Ethiopia
ESET ALEMU WEST Consultants, Inc. Bellevue, Washington.
FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
Recent hydrological and climatological changes V. Barros.
South Africa PRIMA Operating Rules. Model Trans-boundary Operating Process PRIMA,TPTC etc Trans-boundary Agreement Operational Committee Representatives.
WUP-FIN training, 3-4 May, 2005, Bangkok Hydrological modelling of the Nam Songkhram watershed.
Assessing Potential Effects of Highway Runoff on Receiving-Water Quality in Oregon using Surrogate Water-Quality Data Sets John Risley, Gregory E. Granato,
Diversion of Flood Water from Ganga at Kanpur.  Introduction  Study Area  Flow Pattern of Ganga at Kanpur  Quantification of Divertible Flood  Downstream.
San Juan Basin. San Juan-Pagosa Springs(PSPC2) Upper ( ) Middle ( ) Lower ( ) San Juan-Pagosa Springs(PSPC2)
Statistical Water Supply (SWS) Mathematical relationships, in the form of regression equations, between measurements of observed climate conditions (predictor.
Engineering Hydrology (ECIV 4323)
Modeling Development CRFS—Technical Meeting November 14, 2012.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 9, 2008 RECLAMATION Managing Water in the West.
Resource allocation and optimisation model RAOM October 2003.
Fairy Lake Annual General Meeting Dave Macpherson Water Management Technical Specialist Parry Sound District Ministry of Natural Resources.
BASINS 2.0 and The Trinity River Basin By Jóna Finndís Jónsdóttir.
US Army Corps of Engineers BUILDING STRONG ® Reservoir Simulation Software “Westfield Sub-basin” Presenter – John Hickey, HEC August 2010.
Klamath ADR Hydrology Report Modeling Results Historical Record and Instream Claims Model Accuracy Jonathan La Marche KADR Hydrologist3/11/2000.
Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY.
Our Case Study. Rationale for study The TMDL model assumes that there is no decrease in seepage during low flow conditions, basing its calculations on.
PCWA MFP Operations Model All Models are Wrong But Some Models are Useful.
Reservoir Operation Simulation D Nagesh Kumar, IISc Water Resources Planning and Management: M7L2 Simulation.
ANTIDEGRADATION and THE BENEFITS OF PUMP LOGS FOR BATCH DISCHARGES Given by: Dan Murray, Terrell Hendren and Josh Frazier.
CADSWES Engineering Enhancements New Methods and Improved Functionality Steve Setzer.
Calibrating a Complex Environmental Model to Historic Data San Francisco, October 25-26, Goldsim User Conference Presented By: Alan Keizur, P.E.
Hydrology and application of the RIBASIM model SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning.
1 januari 2008 RIBASIM input data by Wil N.M. van der Krogt.
Model Overview Application of CALSIM II to Friant System.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
MRC-MDBC STRATEGIC LIAISON PROGRAM BASIN DEVELOPMENT PLANNING TRAINING MODULE 3 SCENARIO-BASED PLANNING for the MEKONG BASIN Napakuang, Lao PDR 8-11 December.
SOBEK is a powerful 1D and 2D instrument for flood forecasting, drainage systems, irrigation systems, sewer overflow, ground-water level control, river.
Hydrology and application of the RIBASIM model SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning.
Modeling with WEAP University of Utah Hydroinformatics - Fall 2015.
Sanitary Engineering Lecture 4
WATER RESOURCES DEPARTMENT
5th Shire River Basin Conference 22 February 2017 Shire River Basin Management Project Shire Basin Planning Tool Sub-Component A1 Development of a.
Ten Reasons to Use South Carolina’s Surface Water Quantity Models
CANAL NETWORK CONTROL AJAY K BASU
Klamath ADR Hydrology Report
Change in Flood Risk across Canada under Changing Climate
Hydrological Information System
Mapping Climate Risks in an Interconnected System
Increasing Storage Capacity For Woodruff Creek Reservoir
Floods and Flood Routing
Preciptation.
Engineering Hydrology (ECIV 4323)
Towards a Water Scarcity & Drought Indicator System (WSDiS)
Engineering Hydrology (ECIV 4323)
Systems and Components – A Process for Developing the Total Water Budget Handbook for Water Budget Development - With or Without Models CWEMF 2019 Annual.
Presentation transcript:

Antamina Mine Water Management Model Alan Keizur Golder Associates Roberto Manrique Arce Compañia Minera Antamina User Conference 2006 Background The Antamina mine, located at over 4,300 m elevation in the Peruvian Andes, is one of the world’s top ten producers of both copper and zinc. In 2002, a GoldSim model was developed by Golder Associates to provide Antamina with a forecasting tool to assist with water management system operations. Key Model Components Concentrator – given ore type and tonnage, the model calculates the volume of tailings slurry produced, including solids, free water, and pore water Climate – generates daily precipitation values according to the specified scenario (historical, Monte Carlo, or annual dryness condition). Lake evaporation is based on measured monthly averages, and runoff is calculated using the Australian Water Balance Model (AWBM). The input parameters for the runoff model were calibrated to match measured values in each of the major catchments. Tailings Pond – calculates volume and elevation in the tailings pond given previous values and daily inflows and outflows. Major inflows include tailings slurry (consisting of free water, pore water, and solids), runoff, direct precipitation, and inter-basin transfers. Major outflows include pumping for concentrator reclaim, transfers to polishing pond, evaporation, and seepage that is collected and (optionally) discharged. Other Storage Ponds – three other storage facilities are included in the model: Dam D (fresh water storage), Nescafe (flood control and fresh water storage), and the polishing pond (flood control and dilution or tailings pond water) Diversion Ditches – route water from one location to another Receiving Waters – calculates necessary releases to meet instream flow requirements Objectives for the Model Antamina developed the GoldSim model to meet the following objectives: Develop and confirm the water balance for the tailings basin and test under different conditions (climatic and operational). Provide useful projections of volume, elevation, and flow rate for the Tailings Dam, main upstream dams (Dam D, Polishing Pond, Nescafe Lake) downstream water systems (Tucush Creek and Ayash River) in the short, middle, and long-term. Based on the above the GoldSim model results are used to support operational decisions, such as:  Assessment for the dam raise plan (e.g. probable maximum flood (PMF) compliance) and support for dam management (e.g. tailings deposition plan, pond water volume trends).  Calculate tailings deposition rates under different concentrator operating scenarios (ore type, throughput)  Assess the impact of certain management decisions (e.g., tailings seepage return line into Tucush wetlands, replacement of batch water loads in pipeline with Dam D fresh water, etc.) Observations and Future Directions The following observations and conclusions can be drawn from the work to date: The Antamina Water Management Model is operational and adequately represents the actual site conditions. GoldSim is a very effective platform for implementing this type of model The next phase of model development may include the following: A preliminary model for an additional basin was constructed, but not maintained due to rapid site changes. This may be revised once the system stabilized. A new module may be added to simulate concentrate transfer and operations at an associated port facility. Typical Simulation Scenarios Antamina personnel run the model on a regular basis to assist with planning and operation of the water management system. Model runs are typically done deterministically based on specified scenarios, such as the following: Time Frame – typically one month to 5 years Precipitation – 100-year wet, 100-year dry (based on statistical analysis of long-duration records from nearby climate stations), or historical average precipitation (based on measured data at the site since 2000) Transfers from Tailings Pond to Polishing Pond – specify decision rules for making transfers to the polishing pond for dilution and eventual discharge. Seepage Pumpback – specify decision rules for managing collected seepage, which can be pumped back to the tailings pond, discharged directly, or pumped to a passive treatment system (wetlands) Tailings Production – various production rates and ore types can be analyzed. Release of fresh water to maintain instream flows – releases from the three fresh water storage ponds can be either specified or calculated to ensure minimum flows are maintained in the Quebrada Ayash. Water Management System Diagram