Zero-Referencing of Water Level Sensors and Gages #1 source of systematic errors in flume measurements Important at small flows because even small errors.

Slides:



Advertisements
Similar presentations
Inspect Water Distribution EO Air Gaps, Vacuum Breaker, and Back Flow Preventers TP 8 50 min.
Advertisements

Flood Profile Modeling with Split Flows and Weirs
C230 Kompressor Oil Change Procedure
Ways of ensuring something is level Leveling Tube A transparent tube that is filled with water. The water at the two ends will always be level. Spirit.
Introduction to Long-Throated Flumes and Broad-Crested Weirs
Chapter 13: Momentum Principles in Open-Channel
 When using the rotary cutter always walk with the blade closed. To open the blade place four fingers around the handle and slide the blade guard button.
DO NOW How do you like middle school and this class? What do you not like? What could be better? Do you have any suggestions? Write at least 3-5 sentences.
INSTALLATION OF A BIOTIZER ® DISPENSER. TOOLS AND HARDWARE NEEDED FOR AN EASY INSTALLATION ► Cordless, variable speed drill motor ► Drill bit depending.
Lower Yellowstone River Diversion Dam Project – Phase II - Physical Modeling of the Rock Ramp BRT, COE, MTAO Update Meeting November 4, 2010.
Engine Cylinder Leakage Test Tune 8 NATEF Section A8, A.11 P-1.
SPILL – RESISTANT VACUUM BREAKER ASSEMBLY SVBA TESTIN G.
Measuring Erodibility of Cohesive Soils By Gregory J. Hanson USDA-ARS Hydraulic Engineering Research Unit.
53:071 Principles of Hydraulics Laboratory Experiment #2 Local Losses in Pipe Flows Li-Chuan Chen, Marian Muste, and Larry Weber.
Experiment (6) Flow over weirs
Measuring Devices:. MEASURING MASS There are various types of laboratory balances. The triple beam beam balance you use may look somewhat different from.
All critical-flow devices determine flow rate by measuring one or more water levels and computing flow from a calibration equation. Water Level Sensors.
Notes on river discharge measurements
Evaluation of Fish Passage Distribution at the Ice Harbor Removable Spillway Weir, 2006 Kenneth Ham Shawn Reese Scott Titzler Russ Moursund.
Reflection in Plane Mirrors Reflection in Plane Mirrors Objectives: Investigate reflection in plane mirrors Verify the “1st Law of Reflection” Compare.
Coin Drop Lab.
Step 1: Set the desired flow rate for each pipe. Step 2: Click on the stream which you wish to size the pipe. Select Sizing from the menu, then select.
CAPT Lab.
Flow Sensors.
Installation of Mags What details need to be planned out? Manufacture requirements IDWR requirements Site selection for installation Examples of good and.
Water Saving Device By Marcus. Plantitron: Genius Inventors Explanation My water saving device works by putting water in a funnel and then a pump sucks.
Hydrology and Water Resources RG744 Institute of Space Technology December 11, 2013.
Fluid Mechanics 05.
Weathering and Erosion
Food Thermometers Calibrating Instant-Read Bi-metallic Thermometers
Petroleum Engineering 406 Lesson 6 Well Control Unusual Operations.
Li-Chuan Chen, Marian Muste, and Larry Weber
MEASURING FLUMES By CH. VENKATARAMAIAH.
TOTAL STATION SET UP PROCEDURE
Ratings are not static—you must learn how to apply “shifts” to them
DESIGNING BENDWAY WEIRS
1.Identify important lab equipment. 2.Learn how to correctly and safely use lab equipment.
Lesson 9 How can you measure radon in water? Slide 9-1 Radon in water Tap water from underground source may be a concern Test water to determine radon.
Engineer Training Ink Insertion TJ8300 / TJ8500 Ink Insertion.
1 Daya Bay RPC Gas Safety System - Gas Cabinet Test Report Changguo Lu, Kirk McDonald Princeton University (October 11, 2009)
1 Experiment No.1 & 2 Orifice and free jet flow Hydraulics CE-331 Lab.
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Basic Hydraulics: Rating curve. Definition & terminology Rating curve, also known as stage–discharge curve, is a graph showing the relation between the.
Hydrology and Water Resources RG744 Institute of Space Technology November 13, 2015.
SAL COLLEGE OF ENGINEERING AHMEDABAD LIQUID LEVEL MEASUREMENT
Anhydrous Ammonia Storage and Handling Original Power Point Created by Brandon Ritter Modified by Georgia Agricultural Education Curriculum Office June.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
Leveling Tube A transparent tube that is filled with water. The water at the two ends will always be level. Spirit Level Tube incompletely filled with.
LAB REPORTS INTRODUCTION.
14 Refrigerant Recovery, Recycling, and Recharging.
Controllers and Positioners
Basic Hydrology & Hydraulics: DES 601
AUTOMATIC SPRINKLERS.
In-Situ Filter Testing
AM-LINERII® INSTALLATION PROCEDURE Charles A. Munson 9/21/2018.
Particle Size Texture Porosity Permeability Holding Capacity
Kinetic Theory of Molecules
Li-Chuan Chen, Marian Muste, and Larry Weber
Phase Change.
Sediment? Phosphorus? Nitrogen? E-coli?
Chapter 11: Groundwater Lab (porosity and Permeability)
FLOW OVER A SHARP CRESTED WEIR. Chittagong University of Engineering and Technology Dept. of Civil Engineering GROUP-B1(4 ) ID:
6.1 Configuration of sedimentation tank
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Lake 16 Dam Repair Presentation
PRESENTATION OVERVIEW
Procedures Reading from the text.
The awesome peppermint lab!
To find the refractive index of a liquid
Presentation transcript:

Zero-Referencing of Water Level Sensors and Gages #1 source of systematic errors in flume measurements Important at small flows because even small errors are large on a percentage basis Important at large flows because Q is proportional to h 1 U where U is 1.5 to 2.5

Setting water level recorder using a pond Place temporary dams upstream of stilling-well pipe and downstream of flume Fill pond so that water level is at least 2 inches above crest, or at most common water level for flume operation Install recorder and all related equipment in position to record Observe recorder output to be sure pond is watertight Read head above crest at control section using a ruler –Control section is 1/4 to 1/3 L from downstream edge of crest Adjust recorder to match measured head Repeat preceding steps at a different water level

Setting recorder in an empty canal

Setting Recorder in an Empty Canal Similar to the pond procedure, but funnel, tubing and stilling well take place of pond Measure head at control section using two readings from a point gage mounted on a stiff support

Setting Recorder in a Flowing Canal

To sensor To funnel on crest

Setting Recorder in Flowing Canal Install water level recorder and attach point gage and a funnel or cup to rigid support that spans control section Attach transparent hose to the perforated sensing pipe and locate sidewall holes of sensing pipe at the gaging station Take point gage reading on the weir crest at critical section Raise pointer and swing funnel or cup beneath pointer Lower transparent hose below water level at crest until air is purged from hose. Lower cup beneath water and attach hose to cup underwater. Raise back above water and place beneath pointer. Allow water level in cup to stabilize. Read level of water in cup using point gage. Difference in readings is sill-referenced head. Repeat after flow has changed