Towards SKA-low: AAVS and Other Practicalities Peter Hall and Mark Waterson ICRAR/Curtin AAVP Workshop, Cambridge, 10 December 2010.

Slides:



Advertisements
Similar presentations
Implementation of ShipManagement Systems Project Management Prepared by Lana Al-Salem Director of Projects Management SpecTec Ltd.
Advertisements

The Role of Environmental Monitoring in the Green Economy Strategy K Nathan Hill March 2010.
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
Parallel session for topics: EE-05 Deep renovation of buildings EE-06 Demand response in blocks of buildings EE-02 Design of new high performance buildings.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
GENI: Global Environment for Networking Innovations Larry Landweber Senior Advisor NSF:CISE Joint Techs Madison, WI July 17, 2006.
1 Cyberinfrastructure Framework for 21st Century Science & Engineering (CIF21) NSF-wide Cyberinfrastructure Vision People, Sustainability, Innovation,
4.1.5 System Management Background What is in System Management Resource control and scheduling Booting, reconfiguration, defining limits for resource.
Integrating information towards Digital ATM Cyber Situational Awareness Presented By: David M. Petrovich Date:August 28, 2013.
Copyright 2004 Turning Point Solutions Establishing Lines Of Communication Before a Crisis.
SPONSOR of 4R Nutrient Stewardship Program. The Nature Conservancy Teaming with the Florida agriculture industry to increase farmer profitability and.
SKA South Africa Overview Thomas Kusel MeerKAT System Engineering Manager April 2011.
System-of-Systems Cost Modeling: COSOSIMO July 2005 Workshop Results Jo Ann Lane University of Southern California Center for Software Engineering.
1 Ideas About the Future of HPC in Europe “The views expressed in this presentation are those of the author and do not necessarily reflect the views of.
Dec 2010 AAVP Cambridge workshop AAVP AAVS1/2-low demonstrators Jan Geralt Bij de Vaate.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved CHAPTER 8 SUPPLY CHAIN MANAGEMENT.
Merlin ITEA Symposium Merlin Overview2 Problem domain Companies hardly develop embedded products completely on their own Embedded systems need.
© 1998 Concept Five Technologies Enterprise Application Integration Capability Maturity Model.
Romaric GUILLERM Hamid DEMMOU LAAS-CNRS Nabil SADOU SUPELEC/IETR.
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
2006 Palisade User ConferenceNovember 14 th, 2006 Inventory Optimization of Seasonal Products with.
Ian McCrea STFC Rutherford Appleton Laboratory Chilton, Oxfordshire, UK On behalf of the EISCAT_3D Project Consortium.
1 © 2011 Cisco and/or its affiliates. All rights reserved. Ultra High-speed Telecommunication Requirements for the SKA Peter Elford Business Development.
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
SKA Introduction Jan Geralt Bij de Vaate Andrew Faulkner, Andre Gunst, Peter Hall.
Wednesday Working Group Topics 1.Collaboratory Development: –Community issues, workshops, cross-disciplinary communications, development of cross-program.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
VectorCSP. Questions How many people in here manage assets? How many of you know the condition of those assets? How long until the next calendar or hourly.
From the Installation and Certification Group to the Engineering and Development Section Patrick Grenard Chief, Engineering & Development, IMS Vienna International.
2 nd convergence workshop: introduction R. T. Schilizzi Penticton 22 July 2004.
AAs in PEP Jan Geralt Bij de Vaate. PEP Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction.
SKA System Design Kobus Cloete 9 December 2010 AAVP Workshop "Exploring the Universe with the world's largest radio telescope"
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
John D. McCoy Principal Investigator Tom McKenna Project Manager UltraScienceNet Research Testbed Enabling Computational Genomics Project Overview.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
1 Computing Challenges for the Square Kilometre Array Mathai Joseph & Harrick Vin Tata Research Development & Design Centre Pune, India CHEP Mumbai 16.
National Center for Supercomputing Applications Barbara S. Minsker, Ph.D. Associate Professor National Center for Supercomputing Applications and Department.
System designAA Consortium - BolognaOctober 2012 AA Consortium The path to AAVS1 22 October 2012.
SUPPLY CHAIN MANAGEMENT SYSTEMS Part I. 7-2 LEARNING OUTCOMES 1.List and describe the components of a typical supply chain 2.Define the relationship between.
AAVS 0.5: An Overview Peter Hall ICRAR/Curtin, Bologna, October 22, 2012.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems EU environmental research : Part B Policy objectives  Lisbon strategy.
ADASS the Planning and Scheduling Perspective Roadmap: - How planning and scheduling fits in at ADASS - ADASS planning and scheduling posters and presentations.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Telescope Teams P. Dewdney Telescope Teams – relationships with System Design General role of the Architect Group is ‘Guardians of the Design’.
EC Review – 01/03/2002 – WP9 – Earth Observation Applications – n° 1 WP9 Earth Observation Applications 1st Annual Review Report to the EU ESA, KNMI, IPSL,
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris 2-PAD Infrastructure Georgina Harris SKADS System Design and Team Leader.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
NASA Earth Exchange (NEX) A collaborative supercomputing environment for global change science Earth Science Division/NASA Advanced Supercomputing (NAS)
Cyberinfrastructure Overview of Demos Townsville, AU 28 – 31 March 2006 CREON/GLEON.
ORNL is managed by UT-Battelle for the US Department of Energy Cyber Security Assessment of the SNS ICS Karen S. White 10/18/15.
Resource Optimization for Publisher/Subscriber-based Avionics Systems Institute for Software Integrated Systems Vanderbilt University Nashville, Tennessee.
Metadata for the SKA - Niruj Mohan Ramanujam, NCRA.
SKA Interface Workshop: Dishes External Interfaces Thomas Kusel & Mark Bowen For Dishes consortium Manchester June 2013.
2nd GEO Data Providers workshop (20-21 April 2017, Florence, Italy)
Framework for Getting Results at Scale
ISA 201 Intermediate Information Systems Acquisition
BANKING INFORMATION SYSTEMS
AAVS1 Calibration Aperture Array Design & Construction Consortium
Description of Revision
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Need for the ATA SKA Development Facility
Technical Foundations & Enabling Technologies – DS4
WIS Strategy – WIS 2.0 Submitted by: Matteo Dell’Acqua(CBS) (Doc 5b)
Shared Risk Science with the EVLA
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

Towards SKA-low: AAVS and Other Practicalities Peter Hall and Mark Waterson ICRAR/Curtin AAVP Workshop, Cambridge, 10 December 2010

What are the goals of AAVS? Technology demonstrator (primarily) –Reduce risk SKA-low ready for deployment in 2016 –Learn from LOFAR, MWA,... Re-invent as little as possible –Emphasize engineering But include a focused program of science and system learning Design validation – for (sub)systems –Does it work? –Can it be produced in quantity? –Can it be deployed cost-effectively? Fast enough? Collaboration demonstrator –Develop culture of collaboration Tools, processes, management,...

AAVS requirements Build functional interferometer –Validate design extensions to LOFAR, MWA Well -defined imaging and non-imaging tests Verify performance –Not capability (comes with adding DSP etc) Verify scalability to SKA-low –Construction, commissioning, deployment, operation e.g. measuring MTBF of system Develop within institute having substantial engineering capability AAVS will be the first dedicated SKA development! –Totally driven by SKA

Site impact Ground (soil) and related issues –Finite conductivity and e.m. “mirror” Metal ground-planes with all antenna types? –Lightning, surge considerations –Induced noise (e.g. mutual impedance coupling) –Attractiveness of galvanic isolation Solar powered elements (PV + storage)? Physical environment –Climate, wildlife, dust,... Make or break issues in design –Materials selection –Enclosure selection –Environmental conditioning (cooling,...) –Mechanics of deployment Low RFI – enables cost effective aperture arrays Engineering driver: locate AAVS (mainly) at SKA site –Site must provide AAVS infrastructure and logistical support

ICRAR and AAVP Moderate, but in-place resources –Euro 5M project, 25 FTE (total), € 300k capital for SKA-low prototyping –New radio astronomy engineering lab (€2M) –Explicit resources to support MRO (desert site) prototyping –Full connectivity to MRO in next 6 months Internet access Innovative program for SKA-low “exploratory technology” –Single antenna MHz solution BUT in system context –Solar powered elements, low-power digital receiver and transport, galvanic isolation,.... –Major materials engineering, packaging, deployment focus –Links with mature industry partners Development, site and logistical resources available to entire AAVP partnership

Power Power is a critical issue for SKA (PITF) AAVS can be a platform for power supply innovation AAVS must develop a culture of power demand minimization –Design against a power budget from outset, review progress –Push low-power everywhere RF components, DSP, data transport, control systems.... –Investigate dynamic power management – sleep modes, “instant-on” to keep idle costs down –Collect and publish cost-benefit trade studies to educate all development groups Most groups have little experience in this but there are experts around (e.g. JPL)

Commercial solar powered active antenna Currently about USD 50 (1 off) (consumer AM/SW)

The MWA as an SKA engineering demonstrator Proposed as a science-driven instrument but also a technology and operations demonstrator: –Base-band direct conversion –Reconfigurable backend processors (FPGA) –Enough dynamic range to ‘look between” terrestrial interference signals –Real-time calibration and beam solutions –Distributed system configuration and control –Deployment, operations and maintenance

Project lessons from MWA “Basic” project management + “SE lite” not good enough in highly distributed project –The culture of a long-term project is hard to change once started Foster common standards and project metrics from the outset –Takes time to get the tools and infrastructure of collaborative project management working Use AAVS to ramp up to actual SKA methodologies One “hero” PM isn’t enough, every group must be involved so that they learn how to work in a Global team Exchange programs really work – send team members off to work at the other group’s base for 2-4 weeks, to understand the culture, resources a limitations

Recommendations from MWA Lab “mock-up” is critical Test everything before going to site –and if it doesn’t work, DON’T GO! Enforce transparency – especially out-of- organization reviews, personnel exchanges Separate project status reports/meetings from design workshops Look at other data-heavy projects for development priorities – eg LHC, PanSTARRS, LSST, …

More specific to SKA-low Don’t underestimate the cost of complexity –High unit counts make simple things complicated –Include studies of maintenance cost (and time) –Even a simple thing is hard if you have to do it times! Include real failure handling functions in designs –Ability to isolate, and turn off, malfunctioning elements at acceptably sized sections –Include transparent restart capability Be aware of cumulative MTBFs Analyze cumulative failure degradation carefully –How often will maintenance really be required? –What is the maintenance model (within SKA operations plan)?

Industry and SKA-low Industry will make and deploy our systems Design for manufacture, design for deployment –Combine pathfinder experience with site-knowledgeable industry know-how Many Global industries with relevant experience –Construction and operation of remote facilities in AU, RSA e.g. mining, resource, communications,... –Infrastructure provision rests squarely with industry Commissioning is where industry is most deficient –We need a commissioning plan and international commissioning crew Constructors will not wait for leisurely sign-off  large commissioning crew Cross-disciplinary (astronomy + engineering) Mobile (significant time at, or near, site) –Likely to grow out of AAVP team

Conclusion Use Pathfinders for “active learning” Use phased resourcing within AAVP wisely Push for maximum SKA site-specific learning From this point, integrate SKA-low and SKA-mid system design Keep an open mind but require timely demonstration –Innovation important, but 2016 timescale imposes real limits Accept that we now entering a major engineering project and be prepared to make hard decisions on specifications