P roblem S olving I nnovator Solving Tomorrows Problems Today Identify the need and reason for the PSI. Clearly document the Opportunity Description Identify.

Slides:



Advertisements
Similar presentations
P roblem S olving I nnovator Solving Tomorrows Problems Today IS - IS NOT / COMPARITIVE ANALYSIS motivates deliberate thinking about the Boundaries of.
Advertisements

SharePoint List Custom Actions Feature Product Overview Nimrod Geva Product Group Manager, KWizCom
P roblem S olving I nnovator Solving Tomorrows Problems Today Electronic Brainstorm Database Electronic Brainstorm Database Brainstorming stimulates new.
P roblem S olving I nnovator Solving Tomorrows Problems Today 4 th Why / Root Cause Cause & Effect (Fishbone) 4 th Why / Root Cause Cause & Effect (Fishbone)
P roblem S olving I nnovator Solving Tomorrows Problems Today Primary function is to identify and organize possible causes of a specific effect and then.
P roblem S olving I nnovator Solving Tomorrows Problems Today To prevent any potential defects reaching the customer, define and implement containment.
P roblem S olving I nnovator Solving Tomorrows Problems Today Overview of how the 5 why automatically generates an FMEA & Control Plans 5 Why - FMEA Relationship.
ANSWERS. Name Date Scale Title Tolerance Drawing No. Thumbnail sketches Scanned images Illustrative images A DTP package allows you to integrate text.
Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
P roblem S olving I nnovator Solving Tomorrows Problems Today Manual Prioritisation of 1 st Why / Functions. Manual Prioritisation of 1 st Why / Functions.
P roblem S olving I nnovator Solving Tomorrows Problems Today User Help The help feature is found through out the PSI.This enables the user to gain a.
P roblem S olving I nnovator Solving Tomorrows Problems Today 3 rd Why / Failure Effect Development 3 rd Why / Failure Effect Development 3 rd Why / Failure.
once the Team has Completed the 4th Why
P roblem S olving I nnovator Solving Tomorrows Problems Today Warnings Clear All prepares the PSI for the next problem. Clearing of D1-D3.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Failure Mode DBS & Chart Root Cause DBS Reviewing/Updating the Databases and Analysing.
Chapter 6 UNDERSTANDING AND DESIGNING QUERIES AND REPORTS.
ECATS “The Honeywell Web-based Corrective Action Solution” CAR Process Last Revised: August 19 th 2008 Honeywell Confidential & Proprietary.
P roblem S olving I nnovator Solving Tomorrows Problems Today 2 nd Why/Voting Techniques Automatic Ranking 2 nd Why/Voting Techniques Automatic Ranking.
P roblem S olving I nnovator Solving Tomorrows Problems Today 1 st Why / Function Pareto Chart 1 st Why / Function Pareto Chart Overview of Percentage.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Benefit Description Force Field Analysis will identify the viability of Recommended.
P roblem S olving I nnovator Solving Tomorrows Problems Today The Team should Accept the PSI Innovation and develop the Team Structure & Logistics The.
Navigating the Intranet with High Precision Huaiyu Zhu Alexander L¨oser Sriram Raghavan Shivakumar Vaithyanathan.
Trends Exercises February 6, Develop and Synthesize trends Break into teams of three Discuss the trends that each of you brought with you to the.
P roblem S olving I nnovator Solving Tomorrows Problems Today Once the Problem Profile is determined, the Process Control can be implemented correctly.
P roblem S olving I nnovator Solving Tomorrows Problems Today Problem / Improvement Confirmation Problem / Improvement Confirmation Management should.
8D Report provides a summary of the PSI
P roblem S olving I nnovator Solving Tomorrows Problems Today The Fault Tree will automatically be generated once the Team has Completed the 5 th Why.
P roblem S olving I nnovator Solving Tomorrows Problems Today Databases for Improvements Prevention/ Lessons Learned Prevention/ Lessons Learned Potential.
 Review the security rule as it pertains to ›Physical Safeguards ♦ How to protect the ePHI in the work environment ♦ Implementation ideas for your office.
Project Management Phases Class 6. Initiation & Planning – Agenda Overview of the project management phases Midterm paper details.
P roblem S olving I nnovator Solving Tomorrows Problems Today Before beginning, establish the parameters of the opportunity. Do this by completing the.
Workers’ Compensation How To Report An Employee Injury.
Food Recall System Pre Code System Design Layout Version 1.0.
P roblem S olving I nnovator Solving Tomorrows Problems Today Current Situation Prevention / Detection Current Situation Prevention / Detection Analyzing.
AESuniversity Creating Question Sets. Question Sets What are Question Sets? Where can Questions Sets be used? How do you create a new Question Set?
CIS 321—IS Analysis & Design Chapter 4: Analysis— Investigating System Requirements.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 4 Slide 1 Slide 1 Message Analysis Table.
Modeling and simulation of systems Model building Slovak University of Technology Faculty of Material Science and Technology in Trnava.
P roblem S olving I nnovator Solving Tomorrows Problems Today Analysis to minimize all future negative unforeseen effects of stated PSI subject Risk Analysis.
TIPM3 March 13, SBAC Update See Link on protopage Claims (p. 17) Reporting Scores (p.19) Summative Assessment Targets Grade 3 (p. 27) Summative.
Controlled Assessment A(iii) Recommended solution Recommended solution Reasons for this recommendation Refer to the information requirements and your research.
Evaluation of information. Introduction It is common for people to challenge things they learn It is known that not every information is true Medical.
New interface design Proposal Find Books Renew Books Reserve Books Modify Account Information Contact The Library Help And Information.
Course 2, Lesson 1-1 Find the mean, median, and mode for each data set. Round to the nearest tenth if necessary. 1. number of cars in household: 1, 3,
Type your question here. Type Answer Type your question here. Type Answer.
Task Analysis Exercise Project criteria Command term objectives Describe – give a detailed account of the PROBLEM and DESIGN NEED OR OPPORTUNITY (Page.
TTI Performance Evaluation Training. Agenda F Brief Introduction of Performance Management Model F TTI Annual Performance Review Online Module.
5. Planning Phase System Analysis And Design Program: BSCS II (Advent Semester – 2014) Lecturer: Rebecca Asiimwe
Thomas Kern | The system documentation as binding agent for and in between internal and external customers April 24th, 2009 | Page 1 The system documentation.
Quality Assessment of MFA’s evaluations Rita Tesselaar Policy and operations Evaluation Department Netherlands Ministry of Foreign Affairs.
Service Agreements. Group work presentation Group 1 - Revisit and present results of Task 12 – relative to ABC Services case study (page 35). Group 2.
P roblem S olving I nnovator Solving Tomorrows Problems Today Saving with a Backup insures that the work that has been done in the PSI can be recovered.
P roblem S olving I nnovator Solving Tomorrows Problems Today Actions taken refers to the actual action taken as described in the FMEA Prevention & Detection.
CS Computer Architecture Fall 2010 Dr. Angela Guercio ( Course Web Page
Easysite Champions: The Basics *Insert Date Here*.
Test1 Here some text. Text 2 More text.
Wexford Collegiate School for the Arts Arts Focus Online Application
Building Configurable Forms
The Features of a Product or System
New User Guide Learning how to use your NxPay Account
CAPE INFORMATION TECHNOLOGY
[type text here] [type text here] [type text here] [type text here]
Your text here Your text here Your text here Your text here Your text here Pooky.Pandas.
Strategic Presentation
Your text here Your text here Your text here Your text here
CAPE INFORMATION TECHNOLOGY
[type text here] [type text here] [type text here] [type text here]
Bachelor's degree computer science (21) Programming Exercises Part 3
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
How to complete a form A step-by-step guide ReSPECT (version 1.0)
Presentation transcript:

P roblem S olving I nnovator Solving Tomorrows Problems Today Identify the need and reason for the PSI. Clearly document the Opportunity Description Identify the need and reason for the PSI. Clearly document the Opportunity Description Emergency Action Emergency Action Problem Definition Development Computer generated Problem Description User edited Problem Description User edited Problem Description Opportunity Validity & Viability Opportunity Validity & Viability

COVER PAGE

This INFORMATION is placed here as an Auto Field Is an EMERGENCY ACTION required? When will it be implemented? What ACTION must be taken, with immediate effect, as a damage control action? APPROXIMATE COST of emergency action Auto Fields are recognized by the Colour of the TEXT Auto Fields cannot be edited Emergency Action

IINTERNAL or EXTERNAL CUSTOMERS name (who suffers because of the problem?) WWhat the Product or Process is USED for (the application) TThe Date which the PROBLEM was FIRST noticed (date reported & date noticed) TThe QUANTITY of the Product that was received (the scale of the problem) TThe CONSEQUENCES of the PROBLEM (and its effect) Problem Definition refers to Problem Definition Development

An automated Problem Description is constructed This cannot be edited from this location This automated Problem Description can now be edited Computer generated Problem Description User edited Problem Description User edited Problem Description

Once complete, It is recommended to provide a DESCRIPTION of ”Why” the Problem is or is not viable for a Process Improvement Exercise An Assessment of the Opportunity Validity & Viability can be conducted Answer the APPLICABLE questions, Y/ N and briefly Justify your answer Opportunity Validity & Viability

P roblem S olving I nnovator Solving Tomorrows Problems Today This completes the DI Problem Identification Now start the D1 Management Confirmation