Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.

Slides:



Advertisements
Similar presentations
U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.
Advertisements

Great Western Corridor Feasibility Study
July 15, 2008 – GB Work Session Discussion of Mayor Thomas E. Swisstack’s Priority List Recommendations.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
New I-65 Interchange at Worthsville Road Welcome!.
+ Proposed Lockwood Targeted Economic Development District 2015 Yellowstone County.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Environmental Assessment Public Meeting
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AGENCY Bulldog Drive Improvements Right-of-Way and Design September 21, 2010 Presentation for SR 100 CRA.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Longmeadow Parkway Fox River Bridge Corridor
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Connecticut Department of Transportation Bureau of Policy & Planning.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Anacostia Streetcar Phase 2 Environmental Assessment & Section 106 Evaluation: Community Workshop January 12, 2011.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Distribution Guided by State Law Surface Transportation Program (STP) Surface Transportation Program (STP) Congestion Mitigation & Air Quality Improvement.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
What does an Environmental Professional Do?
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Water Supply Planning Initiative State Water Commission November 22, 2004.
EVALUATION AND APPRAISAL REPORT MAJOR COMMUNITY ISSUES RELATED TO COMPREHENSIVE PLAN Board of County Commissioners/ Local Planning Agency Joint Meeting.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 1 Process Development and Integration for the Six-Year Program.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Status Report of the Alamo Regional Mobility Authority October 25, 2012.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
USA Parkway Project Welcome Public Information Meeting to the
Why Plan? Unprecedented pressure for growth and change To identify development and preservation areas over next 20 years To recommend types of land uses.
Comprehensive Plan Update. General, far-reaching vision to benefit the whole community Takes a long term view of issues Focuses on physical development.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
Unit 2 DEVELOPMENT OF THE LONG RANGE TRANSPORTATION PLAN (LRTP) LCTCC Educational Program.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Executive Order Environmental Stewardship and Transportation Infrastructure Project Reviews Priority Issues.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Alternative Alignments Public Meeting
Interagency Coordination in Long Range Transportation Planning
Office of Greenways & Trails
Draft Transportation Element September 6, 2017
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
SEQRA as a Tool to Review Energy Projects
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
The National Environmental Policy Act (NEPA)
Presentation transcript:

Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor

Longmeadow Parkway Bridge Corridor ~ 5.6 miles from Huntley Road to IL 62 Unique local/state/federal partnership Linkage of 3 State routes (IL 31, IL 25, IL 62)

Project Location

Project Purpose To enhance the Upper Fox Valley transportation network by reducing congestion and providing alternative and more direct routes to serve existing land use through efficient access to central business districts, employment and commercial centers

Project Need No new river crossings in Upper Fox Valley since 1950’s Population on west side of Fox River has increased ten fold since 1980’s Congestion on 3 regional River crossings: I-90, IL 72, & IL 62 Carpentersville Main St. bridge carries regional traffic through neighborhoods & impacts east side of river

From the Start… Fox River Bridge Advisory Committee formed: To comprehensively study 20+ potential new bridge crossings of Fox River 1990 Fox River Bridge Study – 12 potential crossings (3 advanced separately) ISTEA (Fed. Transportation Bill) funded bridge study: 1994 Fox River Bridge Crossings Corridor Analysis Document 1994 study evaluated 9 potential Fox River bridge crossing areas Evaluated 4 Dundee area corridors – County Line, Longmeadow, Miller/Lake Marian & Boncosky – 3 had significant environmental issues 5 corridors selected for evaluation by Environmental Impact Statement Longmeadow had the least impact to the human and natural environment

Environmental Impact Statement Required by National Environmental Policy Act under United States environmental law Document of likely environmental effects of a proposed development based on scientific assessment or study Considers land, water, air, structures, living organisms, environmental values at the site, and the social, cultural, and economic aspects A tool for decision making

Environmental Impact Statement EIS Team included: Advisory Council on Historic Preservation Illinois Department on Natural Resources Illinois Environmental Protection Agency Illinois Historic Preservation Agency Illinois Nature Preserves Commission Illinois State Geological Survey U.S. Army Corps of Engineers U.S. Department of the Interior U.S. Department of Agriculture U.S. Environmental Protection Agency U.S. Fish & Wildlife Service Various Environmental Consultants Kane County Illinois Department of Transportation Federal Highway Administration

Environmental Impact Statement EIS & Section 4(f) evaluation process 30+ Public meetings (North/Central/South): Intro to project & solicit public comments FHWA presentation to County Board Presented corridors, impacts & solicit comments Presented 5 corridors for EIS study public hearings – Presented draft EIS & reports County Board meetings (6 advancing resolutions) 2002 onward – various updates as required by Resource Agencies

2001 – Federal approval of Final EIS 4-Lane Longmeadow alignment 2002 – Federal Record of Decision approving 3 Fox River crossings Longmeadow Parkway, Stearns and IL 56/Oak: Best satisfies the purpose & need Least impacts to the natural & human environment Selected based on processes in compliance with NEPA Eligible for Federal Highway funding May advance projects through development process Environmental Impact Statement

Final EIS process established the final alignment & included mitigation of open space impacts Longmeadow alignment adjusted during EIS process to minimize impacts to environment 2002 Federal EIS & Record of Decision established final alignment Phase I & II engineering uses approved 2002 final alignment Open space mitigation ongoing and part of land acquisition 2008 Brunner Forest Preserve acquisition process included the conveyance of the Longmeadow right-of-way Environmental Impact Statement

2002 onward – Phase I Engineering & Land Acquisition Various public meetings & Funding Appropriations Kane County 2030 Transportation Plan 24+ public meetings – Various locations in Kane Intergovernmental Agreement Longmeadow Pkwy/ Huntley / Kreutzer Roads (Kane & McHenry Counties, Villages of Algonquin, Carpentersville, Huntley, Gilberts) Kane County Planning & Programming

– Longmeadow (LMP) Task Force & Study* Municipal request to expedite project & address funding *Traffic Projections and Financial Feasibility Study 10+ public meetings Resolution - Adopting study, support for LMP & Toll Option 9 surrounding municipalities 2 Counties (McHenry & Kane)

Challenge Federal & State funds are extremely limited Funding Opportunity County Toll Bridge Enabling Legislation Funding primarily through user fees Minimizes use of County funds Reduces risk & supports County’s capital needs by creating new revenue source Provides mechanism for non-Kane County Residents to pay for the corridor Why a Toll Bridge?

Toll Option Toll facility east of Fox River Primarily funds area between IL31 and IL25

Project located in an area highly concentrated with I-PASS users

Toll Collection All Electronic Toll Collection (ETC) I-Pass compatible

Municipal Planning Municipal planning efforts and public processes have included Longmeadow: Carpentersville’s 2007 Comprehensive Plan Algonquin’s 2008 Comprehensive Plan Development planning & platting Right-of-way acquisition Construction of roadway segments

Federal Government Support U.S Congress Appropriations in Federal Transportation Bills: $8.3M to study and plan for Fox River Crossings $9.375M for Fox River Crossings $4M for land acquisition for Longmeadow Parkway

Regional / State Construction Support CMAP Planning, Programming & Air Quality Conformity Analysis ~$1M Congestion Mitigation / Air Quality Funds ~$5M from Kane/Kendall Council of Mayors ~$40M from State of Illinois

Project Development Following successful model of Stearns Rd Bridge Corridor Won local, state & national awards IL American Planning Association - Sustainability Award in 2012 Kane-DuPage Soil & Water Conservation District - Recognition of Excellence for Efforts in Conservation of Land and Water Resources Best Management Practices Closed drainage system near and over Fox River Vegetated swales and detention ponds Significant tree plantings and landscaping

Project Status / Next Steps ~60% land acquired to date Finalize Land Acquisition – 2015/2016 (~40% remaining) Finalize Phase II engineering – Spring 2015 Intergovernmental Agreements – Tollway, State, etc. Seek additional Federal & State construction funding Current Construction Cost Estimate: $97M 1 st construction contract letting – targeting late 2015

Questions?