Health and Safety Executive The Fukushima Daiichi Accident – Report of HM Chief Inspector NuLeAF Meeting 21 October 2011 Andy Hall Deputy Chief Inspector.

Slides:



Advertisements
Similar presentations
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Advertisements

1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
FUKUSHIMA RESPONSE George Attarian 1/21/2013. Fukushima Response Timeline: March 11: Event occurred March 18: INPO IER 11-1 issued (April 15) March 23:
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Assessing the Challenges Resulting from the Events at Fukushima Daiichi Nuclear Power Station A Preliminary Discussion March 25, 2011 Walter L. Kirchner.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Safety Implications of the Fukushima Nuclear Accident Sheldon L. Trubatch, Ph.D., J.D. Vice-Chairman Arizona Section American Nuclear Society.
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Overview of Incident at Fukushima Daiich Nuclear Power Station (1F) (Informal personal observations) April 2011.
IAEA International Atomic Energy Agency Lessons Learned from the Tailored IRRS Module on Regulatory Implications of the Fukushima Accident Presentation.
STRAGEGY FOR ENHANCING SHARE OF NUCLEAR ENERGY – Ensuring Safety & viability S.S. Bajaj Chairman, AERB 6 th Nuclear Energy Conclave, New Delhi 14 Oct 2014.
ONR Presentation to NuLeAF Tanya MacLeod. Responsibilities Prime responsibility for the assessment and management of Flood and Coastal Risk on site rests.
IAEA International Atomic Energy Agency CS-81 to prepare a work plan and material for developing a guidance on management of large amounts of radioactive.
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
March “Experience Gained from the Mexican Nuclear Regulatory Authority in the Probabilistic Safety Assessment Level 2 Development for Laguna.
Japanese Nuclear Accident And U.S. Response May 17, 2011.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Produced 27/06/05 Seeing the Future First Tom Welland Fire Services Manager.
Outcome of the EU Nuclear Safety Stress Tests Andrej Stritar Chairman, ENSREG.
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
Deepwater Horizon Oil Spill On April 20, 2010, an explosion on the Deepwater Horizon MC252 drilling platform in the Gulf of Mexico caused the rig to sink.
Fukushima Nuclear Disaster Team 07: Belsheim Joshua Francis Travis He Jiayang Moehling Anthony Ziemkowski Micah 1.
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
Nuclear Accident at the Fukushima Dai-ichi NPP June 2, 2011 Embassy of Japan in Bulgaria.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
March 11, 2011 to Present. Presentation Overview Reactor Design and FeaturesChronology of EventsCurrent Status of Each ReactorRecovery Actions Kashiwazaki-Kariwa.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Summary of Session 3 Post-Fukushima Operational Safety Improvements 1 Fred Dermarkar IAEA International Conference on Operational Safety Vienna International.
Organization of the peer review process of stress tests in the European context “stress tests of NPP Dukovany and NPP Temelín - evaluation of safety and.
Fukushima Power Plant – Japan Post March 11, 2011
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
Ensuring the Safety of Future Developments
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
Low Power and Shutdown PSA IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
Safety of At-Reactor High-Density Storage of Fuel in Pools Steve Jones Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission International.
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Energy Meeting with the NGOs Taipei, 25 September 2013 Christian Kirchsteiger European Commission, Directorate-General for Energy (DG ENER) EU Policy Context.
Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
MANOJ CHANDRA RAO A/L RAMA RAO ME DHINESHKARAN A/L BALKARAN ME MITHIRAN A/L GENESEN ME PIVINESH NAIR A/L SREETHARAN NAIR ME
Japanese Nuclear Accident And U.S. Response April 20, 2011.
Fukushima Daiichi Jourdan Robbins 12/6/ /16/16.
STRESS TESTS and TAIWAN PEER REVIEW PROCESS
Spent Fuel Pool Instrumentation NRC Order EA
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
Ensuring Nuclear Safety Culture in Ghana: Regulatory Perspective
Flooding Walkdown Guidance
WENRA Current activities of WENRA 4th GNSSN Steering Committee Meeting
Armenia Training and Tutoring Feedback
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions
Fukushima Lessons Learned
Communication and Consultation with Interested Parties by the RB
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
National Arrangements for Response to Transport Emergencies.
Presentation to the EPREV Lessons Learned Workshop
Japanese Nuclear Accident And U.S. Response
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
Safeguards at Post-Accident Facilities
New Regulatory Requirements in Japan
Presentation transcript:

Health and Safety Executive The Fukushima Daiichi Accident – Report of HM Chief Inspector NuLeAF Meeting 21 October 2011 Andy Hall Deputy Chief Inspector (figure courtesy of GE Hitachi Nuclear Energy)

Introduction Outline of the accident Aims of the Chief Inspector’s Reports Openness and development of the project Conclusions & recommendations of Interim & Final Reports

Accident Initiator 11 March 2011 Magnitude 9 earthquake Subsequent tsunami 14-15m Fukushima 1

Immediate Consequences Loss of all external power Only 1 of 13 Emergency Diesel Generators remained available Unprecedented devastation Impaired infrastructure Long-term developing scenario

Fukushima Daiichi Regulatory Design Basis tsunami of 3.1m, TEPCO 5.7m

Power of tsunami

Accident Characteristics Major external hazards affected site Station blackout Loss of some DC power Loss of ‘ultimate heat sink’ Failure to cool reactor cores Core melt and hydrogen generation Explosions Fission product releases over extended period

Damage to reactor buildings

Consequences over following days Reactor 1Reactor 2Reactor 3 Operating statusNominal full power Fuel conditionUncovered from ~1700 on 11/3/11, melted & relocated shortly afterwards Uncovered from ~1800 on 14/3/11, melted & relocated shortly afterwards Uncovered from ~0800 on 13/3/11, melted & relocated shortly afterwards Current fuel locationRelocated to lower RPV head, possibly some in dry well underneath Lower PRV head condition Believed to be damaged, primary coolant appears to have leaked through lower head Primary containment vessel (PCV) and venting Wet-well venting from 1430 on 12/3/11. Explosion seen at top of reactor building 1536 same day Wet-well venting from 1100 on 13/3/11. Explosion heard at 0600 next day, believed to be in vicinity of pressure suppression pool Wet-well venting from 0520 on 14/3/11. Explosion seen at top of reactor building 1101 same day

Radiological Source Terms NISA estimated source term from JNES accident calculations NSC estimated it from JAEA back-calculations from environmental monitoring These agreed on 1 – 2 x Bq of I-131 and 1 – 2 x Bq of Cs-137, i.e. ~ 10% of Chernobyl On this basis, the INES rating was increased to Level 7 on 12 April.

Aims of Chief Inspector’s Reports Requested by SoS Energy & Climate Change Interim report published in May Aims: to learn lessons identify any UK vulnerabilities take action to assure and improve nuclear safety

Aims of Chief Inspector’s Reports Also asked to cooperate with other national regulators and international organisations, and to be open and transparent in preparing the reports

Project Arrangements Set up a small core team within ONR Drew on technical inspectors for specialist advice Invited submissions from public via website Set up Technical Advice Panel

Interim Report Conclusions 11 Conclusions To summarise: our review of the information available has not revealed any vulnerabilities with UK nuclear facilities or shortcomings in safety methodology that would require operations to be curtailed

Interim Report Recommendations 26 Recommendations General: need for good comms, seek lessons for emergency preparedness & enhance openness For regulators: review standards/guidance and emergency preparedness, particularly for severe accidents For industry: review aspects of accident for implications, e.g. resilience, natural hazards, AC supplies, cooling, site/plant layout, human performance, emergency preparedness, data comms.

Conclusions from International Reports Fukushima Daiichi was not adequately protected against the natural hazards that struck These were foreseeable – historical records of larger tsunamis striking East coast of Japan Original site safety case identified tsunamis as a threat –regulator accepted design height of only 3.1 m Operator increased this to 5.7 m after 2002, but appears to have only implemented improvements on Unit 6

Design Basis ‘Design Basis’ sets out events that plant must be designed to withstand and control For Japan, a Regulatory Guide sets out the ‘anticipated operational occurrences’ and ‘accidents’ that must be analysed This only requires a single failure of a safety system or component within it to be assumed following the initiating event

Design Basis for Tsunamis Neither total loss of AC power nor loss of ultimate heat sink were design basis events Japanese Government report stated: a trial tsunami PSA “indicated that the risk sensitivity of an event in which simultaneous functional losses of all the seawater pumps are generated due to tsunami was high” “compared with the design against earthquake, the design against tsunamis has been performed based on tsunami folklore and indelible traces of tsunamis, not on adequate consideration of the recurrence of large-scale earthquakes in relation to a safety goal …”

Safety Case Implications Safety cases need to be: based on a structured analysis of a comprehensive range of possible events and hazards, both frequent and infrequent updated in the light of new information and advances in technology

Final Report Conclusions Six new conclusions UK approach to designing against a wide range of events including natural hazards is sound long-standing concerns over Sellafield Legacy Ponds & Silos means UK must continue to progress remediation & retrievals with vigour Periodic Safety Reviews are essential for ensuring safety standards are improved in line with new technology & understanding

Final Report Conclusions the scope of operators’ Probabilistic Safety Assessments must be extended to cover severe accident conditions, to improve understanding for their management additional information has reinforced Interim Report conclusions & recommendations UK nuclear industry has responded constructively to Interim Report

Final Report Recommendations Twelve new recommendations General: support efforts to improve international peer reviews & further development of standards review methods for estimating source terms, measuring environmental contamination and predicting dispersion & impacts review planning controls for commercial & residential developments near nuclear sites ensuring that ONR is open & transparent about its activities

Final Report Recommendations For regulators: ONR should expand its oversight of nuclear safety-related research, including UK capability, to ensure continuing access to sufficient expertise to perform its duties

Final Report Recommendations For industry: buildings and equipment needed for managing accidents, such as emergency centres, should be protected against hazards that could affect several at same time they should also be capable of operating in the conditions, inc. severe accidents, for which they might be needed continue to promote high levels of safety culture & nuclear professionalism

Final Report Recommendations For industry: give appropriate & consistent priority to completing Periodic Safety Reviews & implementing the identified improvements develop Level 2 PSAs for all facilities that could have accidents with off-site consequences & use to further develop severe accident management measures Report responses to recommendations to ONR by June 2012

To conclude Although some more detailed information may yet emerge, we already know enough to develop reliable conclusions & recommendations Everyone with responsibilities for nuclear safety must strive for continuous improvement

Thank you for your attention … … any Questions?