RIGO Update Xcel Energy Jason Standing Jeffrey Norman October 3, 2007.

Slides:



Advertisements
Similar presentations
Project Update Late 2005 the PSANI Policy Group reviewed mitigation efforts to reduce transmission curtailments in the Puget Sound Region Late 2005 the.
Advertisements

The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Waste Plant Operator Meeting Monday, March 30, 2009.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Wind Energy and Transmission South Dakota Legislative Briefing Pierre, South Dakota January 18, 2006 Beth Soholt Director Wind on the Wires.
Steve Rueckert Director of Standards Standards Update June 5, 2014 Joint Guidance Committee Meeting Salt Lake City, UT.
T ransmission I mprovement For the Red River Valley & West Central Minnesota.
AB 11 22 33 44 55 66 77 88 99 10  20  19  18  17  16  15  14  13  12  11  21  22  23  24  25  26  27  28.
North Mankato Load Serving study Xcel Energy Great River Energy.
 Jeremy Turner, Executive Director Phoenix, Arizona May 21, 2010.
Electricity and Magnetism Mr D. Patterson. Outcomes explain why electrical energy is transmitted as AC at very high voltages, and describe and explain.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
Buffalo Ridge Incremental Generation Outlet (BRIGO) Transmission Study Presentation to National Wind Coordinating Committee June 22, 2005 W Grivna, PE.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
Northwest Wisconsin Wind Energy Forum David Donovan St. Croix Casino Turtle Lake, WI May 25, 2006.
Special Products Section 6.4. Find the product. (x + 2)(x + 2) (x + 3)(x + 3)
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
Potential Transmission Construction Scheduling In Southern Minnesota--- Fall Spring 2006 Xcel Energy has posted Significant Transmission construction.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
ISO Grid Planning Presentation to CREPC October 1, 2002
 UK Power Networks. All rights reserved Demonstrating the benefits of energy storage on an 11 kV Distribution Network Matthieu Michel – Technology.
EASTERN PLAINS TRANSMISSION PROJECT Tri-State Generation & Transmission and Western Area Power Administration.
0 CapX /1/2015 CapX 2020 Transmission Plan: Ensuring Reliable Electricity.
Oct 14, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
Victoria L. Ravenscroft Senior Policy Analyst Reliability Planning and Performance Analysis Information Sharing Policy Update March 25-26, 2014 Standing.
WIEG Board Meeting Alliant Energy New Generation Plan Kim Zuhlke February 8, 2007.
Khoo Yihan | Chua Cong Yang | Park Seong Jin.  Electricity is generated in power stations at 11000V to 33000V and then stepped up to V by transformers.
____________________ Your Name above My favorite subject in school is ________________________. I love ________________ and _____________________. ______________,____________,
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
March 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Reliability Must-Run Analysis 2006 – th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
ITEC 352 Lecture 3 Low level components(2). Low-level components Review Electricity Transistors Gates Really simple circuit.
Distance Vs. Displacement Vs. Position Biniyam Melesse, Ousman Ba & Alba Reyes.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
Matrix Working with Scalars by Jeffrey Bivin Lake Zurich High School Last Updated: October 11, 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Preparing and sending records to ULI. 2 All of the information in this document is the property of Ex Libris Ltd. It may NOT, under any circumstances,
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
Work out the power dissipated by the resistor in the following 2 circuits. All LEDs have a forward voltage of 2v Which circuit is the most efficient and.
Objective The student will be able to: multiply two polynomials using the distributive property.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Multi-State Clean Energy RFP 1 To explore whether a multi-state procurement might attract larger-scale projects and transmission than single state procurements.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
Houston Area Constraint Mitigation Project ERCOT Board of Directors March 15, 2005.
Houston Import Study Update
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
Presenter: Chris Lambrecht
تحليل الحساسية Sensitive Analysis.
Lab Safety Policies Don’t stand on lab chairs
CMPLDWG Composite Model with Distributed Generation Approval
مديريت موثر جلسات Running a Meeting that Works
How on earth do I fill in a Risk Assessment?
By Swati Sircar (longer version)
CMPLDWG Composite Model with Distributed Generation Approval
We are going to be focusing on using on Outlook and getting the advantages of priorities, signatures, using folders, editing outlook and understanding.
By Swati Sircar (longer version)
Presentation transcript:

RIGO Update Xcel Energy Jason Standing Jeffrey Norman October 3, 2007

Updates Since Last Meeting Options 1,2,3, and 4 (western options) have been dismissed as possible options. Focus instead on the southeastern portion of Minnesota. Created a few combination options.

Option 5: Owatonna-Austin Corner 161 kV 53 MW of outlet Option 5b – Second Pleasant Valley 345/161 kV line – 308 MW of outlet

Option 8: Blue Earth-Loon Lake 161 kV 220 MW of outlet

Option 9: Pleasant Valley-Blue Earth 161 kV 43 MW of outlet Option 9b – Second Pleasant Valley 345/161 kV line – 330 MW of outlet

Option 11: Loon Lake-Jackson 161 kV 130 MW of outlet Option 11a – Reconductor of the Lakefield-Triboji 161 kV line – 255 MW of outlet

Option 5b9 Option 5b9: – Owatonna-Austin Corner 161 kV – Pleasant Valley-Blue Earth 161 kV – Pleasant Valley 345/161 kV tx 268 MW of outlet Option 5b9a – Second Maple Leaf-Byron circuit – 412 MW of outlet Option 5b9ab – Option 5b9a with tripping of new generation for loss of Pleasant Valley 345/161 tx – 617 MW of outlet

Option 89: Pleasant Valley- Blue Earth-Loon Lake 161 kV 47 MW of outlet Option 89a – Second Pleasant Valley 345/161 kV tx – 365 MW of outlet Option 89ab – Second Maple Leaf-Byron circuit – 572 MW of outlet

Where to go from here? Run a few more sensitivity cases. Determine which option to go forward with. Write up a draft report and send it out for review. Write the final report.