Building Plan Presentation The Evangelical Lutheran Church of The Holy Trinity.

Slides:



Advertisements
Similar presentations
Development Strategy nd Consultation. Our Mission To proclaim Gods kingdom and call people to worship God in Streatham To seek to serve our community.
Advertisements

Mission: Helping each other follow Jesus’ way. (John 14:6) Vision: That through Him all might be saved. (John 3:17) MARCH 2014 Miracle Sunday May 18, 2014.
Building the Church of the Future. Established on November 7, 2004, through the process of discernment we, as a Parish, selected the Building Church While.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
Congregation Survey Summary & Program Statement KATY first united methodist church August 30, 2009.
EXPECTED OUTCOMES for our 2-Day Consultation Consensus on the data & assumptions driving the church ministries. Consensus on the data & assumptions driving.
PROPOSED HOUSING DEVELOPMENT—TWEEDBRIDGE COURT—PEEBLES Forfar East & Old Parish Church Brian Smith, Wellwood Leslie; Graham Kerr, John Duguid Partnership-
Building Expansion Project Update ECCC 4.9 Growth Strategy We will continue to grow as a “one site multi congregations & services” church.
NEW MERCY CENTER. Dramatic 35 foot tall Bright Silver Building entrance cross. Recognition by custom engraved plaque. This Cross will be up lit at night.
ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
1 Agenda District Board of Church Location and Building Meeting Objective To bring District up to date with renovation of Annex (complete) To receive constructive.
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
ECCC Growth Strategy. Average Sunday Attendance ,006 1,120.
Four worshipping congregations Three ethnic groups Three sites Two languages One connection One Lord and Savior of us all.
Lutheran Church of the Good Shepherd Building Committee Update May 2014.
Church Renovation/ Expansion Proposals Willowdale.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
Columbia Grove Covenant Church Master Plan Presentation § planning solutions, inc ne 77 th avenue suite 275 vancouver, washington cell.
CALIFORNIA STATE POLYTECHNIC UNIVERSITY, POMONA | MASTER PLAN UPDATE CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
Capital Campaign 2012 John Calvin Presbyterian Church Opening New Doors, Letting Our Light Shine.
1 UAS Campus Masterplan December 2012 Draft. 2 PRIOR WORK - INPUTS –UAS Masterplan 2009 – Accreditation Review 2010 – UAS Strategic & Assessment.
June 29, Discuss preliminary vision for St. Vincent’s Open lines of communication Share information as previously committed Seeking your input in.
St. Theresa All Are Welcome... To our Church, our Home, our School Information Meetings May 2015.
St. Mark’s Evangelical Lutheran Church 2015 Mission Opportunity Plan Special Congregational Meeting Sunday, February 8, 2015 St. Mark’s Evangelical Lutheran.
The Catholic Community of St. Thomas More New Building Committee.
Proposed Facility Master Plan First Baptist Church Mt Washington, Ky.
GROWING THE DREAM. Approximately fifteen years ago, our church leadership had a God-inspired dream to reach thousands of children, teens & families in.
MONTGOMERY HIGH SCHOOL MODERNIZATION & NEW CONSTRUCTION
Living our Legacy “And God is able to make all grace abound toward you, that you, always having all sufficiency in all things, may have an abundance for.
Feb 27, 2007 Informational Meeting 1 St Paul United Methodist Church Faith Works! “Building for Christ’s Ministry” Informational Meeting February 27, 2007.
2013 Bond Task Force Proposal Presentation & Proposal by Cory Baker Director Scottsdale Center for the Performing Arts 3 Vice President Scottsdale Cultural.
St. Peter Lutheran Church East Peoria, Illinois SacredSpace liturgical design consultants What do we want from our building? Architectural Programming.
Proposed Facility Master Plan First Baptist Church Mt Washington, Ky.
Title Slide. Preliminary Conceptual Development Workshop Integrate sustainable design into new buildings and reduce carbon footprint Create more flexible.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
1 Advisory Group Meeting October 4, Topics to Be Discussed Overall Plan Overall Plan Review of Three Site Visits Review of Three Site Visits Congregation.
Burke Community Church August 25, 2013 Town Hall Meeting.
Grace Bible Church Ministry Goals & Master Plan Presentation.
Master Plan Committee Report to Church Council August 26, 2008.
First United Methodist Church Katy, Texas Preliminary Master Plan Presentation September 29, 2009.
©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
January 26, Key Themes from User Groups
This question speaks to primary ownership of the room décor. Will the space be designed for contemporary worship that youth will be allowed to occupy.
PASTOR STACEY NICKERSON Pacific Emergency Give to Pacific Emergency Advance # Lisa Jackson A massive earthquake hit Japan on.
City of Rehoboth Beach Summary of Master Plan Consultations, Recommendations and Progress to date By Stan Mills for July 7 Board of Commissioner's Meeting.
GATEWAYS FACILITIES – THE “JOURNEY” 1. Agenda 1.Facilities Presentation and Purpose – Where we’ve been – Progress this year – A recommendation for your.
Samuel Brighouse Elementary School
CEC Strategic Plan Vision Strategy Working GroupSpring/Summer 2010.
- 1 - Advent Lutheran Church Long Range Planning Task Force August 1998.
Denville Community Church, UM “Here we GROW…again” An Informational Presentation of the Building Committee’s planning & status January 9, 2005 The purpose.
October 15, 2012 Oakwood Presbyterian Church Feasibility Study Design Meeting 2 Copyright Hoffman Architecture /02/20121.
CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
BUILDING COMMITTEE REPORT FELLOWSHIP BIBLE CHURCH “Together, one passionate pursuit: to know Him and make Him known” OSKALOOSA, IOWA.
Building Team Formation: Background Information St. Andrew Presbyterian Church March 27,
IRENE FUNG EDUCATION LIBRARIAN New Premises: A Renewed Collaborative HKU Education Library Experience.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
CONGREGATIONAL MEETING July14th, 2015 ORIGINAL OBJECTIVES OF THE PROJECT JORDAN TEAM 1)Investigate the unused portions of our land – either for ministry.
Aldersgate Visioning Update “Do justice, love kindness, and walk humbly with God” - Micah 6:8.
Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
Building Committee Update 5/21/17
St. Luke Lutheran Church
Campus Construction Projects
21st Century School Buildings Plan
Mary Queen of Apostles Facilities Master Plan Update
PHASE I NEW SANCTUARY BUILDING COMPLETE WORSHIP SPACE FOR 350
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
From the Facilities Task Force 2 (TF2) Presentation to Session
Presentation transcript:

Building Plan Presentation The Evangelical Lutheran Church of The Holy Trinity

 Harrison F. Bink, AIA Principal  Dorothy K. Anderson, Assoc. AIA Project Designer Introduction

 Founded in 1961;  Have served over 220 congregations;  Committed to Principal involvement;  Purposely “right-sized”;  Listen, Lead, Perform™ process;  Congregational ownership of project. Qualifications

This presentation incorporates the concepts of the architectural task force, Bink Architectural Partnership, the survey, and proposals made in In order to respond to ministry needs, the Church has been searching for other ways to utilize its existing properties. Summary

Existing Site Plan Currently there are three dissimilar, unconnected building types.

Considerations:  Create the feeling of a campus, including all of the existing properties  How to use 128 Cocoa Avenue  How to use 20 Granada Avenue  How to use 212 Cocoa Avenue  How to plan for future growth  How to incorporate special requirements of the Church, its educational programs, and outreach projects as expressed by the survey and committees

Other Considerations Holy Trinity has been using these buildings for the overflow of outreach projects, educational programs and administrative functions. The congregation is in need of more functional space and is looking for ways to integrate all buildings into a unified church complex. The Church also desires to bring the quality of finishes in the education wing up to those in the Sanctuary and Chancel.

 Rebuild 128 Cocoa Avenue with a slightly larger foot print.  It will serve the Church’s outreach ministries housing the food bank on the ground floor.  The first floor will have open space for gatherings, meetings, and worship.  The second floor will be dedicated to education and youth activities.  Additionally, the first and second floors could be utilized for temporary housing or other outreach opportunities. Phase I – Community Outreach and Youth Ministries

The key to 128 Cocoa Avenue is flexibility. We have designed the property with as much open space as possible.  Setting outreach as a priority, the Architectural Task Force and Bink Architectural Partnership believe that 128 Cocoa Avenue should be Phase I of the project. Furthermore, it stands alone and construction will not disturb Church services and activities.

  The new building will serve to show the Church’s strong dedication to youth and enhance our identity and vital presence in our community.

 20 Granada Avenue Phase II West Entrance and Administrative Needs  Replace 20 Granada Avenue with new administration offices linked to the church by a bridge spanning the alley. This bridge is the critical link between the Church and administrative offices, a long sought after goal.  The ground floor level below the administration offices will have parking for six (6) to seven (7) vehicles, enclosed storage, and green space on the street side.  Below the bridge at the Church’s West elevation will be an enhanced entrance with a new larger elevator and central stair to connect all levels of the building.

New Site Plan New Administration Offices Bridge

First Floor New Administration Offices Bridge to Church Narthex

New West Entrance & Bridge

 Phase III – Fellowship and Education  Remove existing administration building in order to construct additional education and fellowship space

New entrance on Cocoa Avenue Connecting stairs & corridor from Church to Education Bldg.

Welcoming entrance

Ground Floor Storage New Main Entrance Parking Consolidation of educational programming space

  Increased, integrated classroom space designed to accomplish needs of Rotation Sunday School.  Relocated nursery and kindergarten  New choir rehearsal room and storage for music, robes and hand bells.  New ADA compatible restrooms, storage and facilities manager’s office  Improved circulation connecting all spaces on the ground floor including a second means of egress to Cocoa Avenue Ground Floor also provides:

First Floor Plan Worship and Fellowship Space  New larger fellowship hall, adjacent to the sanctuary, with kitchen and ample storage  ADA compatible restrooms

 The third phase completes the building plan and responds to priorities of the survey and needs expressed by the architectural & congregational committees.  Builds improved curb appeal

Thank you for your time. Bink Architectural Partnership “Architecture in the Greater Community’s Interest”