©2001 Plan B Systems Inc. PBSi Quantitative Cost/Schedule Risk Analysis.

Slides:



Advertisements
Similar presentations
Estimating, scheduling and budgeting
Advertisements

Project Management Lecture 16 Project management involves estimating the length of time to complete a project Once a project has been undertaken then a.
Intaver Institute Inc. 303, 6707, Elbow Drive S.W., Calgary AB Canada T2V 0E5 Quantitative Risk Analysis for Aerospace Industry.
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
Full Monte Cost and Schedule Risk Analysis
Approaches to Data Acquisition The LCA depends upon data acquisition Qualitative vs. Quantitative –While some quantitative analysis is appropriate, inappropriate.
Defining the Project CHAPTER FOUR Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Week 3 – Assessing Risk. Risk Analysis Process Technical & systematic process Examine events Focus on causes, not symptoms Determine interrelationships.
Project Time Management
Engineering Design Development. Turner College and Career High School.
Project Management Basics
Development plan and quality plan for your Project
Gantt Chart Engineering Design Development. Turner College and Career High School.
Part II Project Planning © 2012 John Wiley & Sons Inc.
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
PMI Knowledge Areas Risk Management.
Project Risk Management Supplement. The Importance of Project Risk Management  Project risk management is the art and science of identifying, assigning,
RISK MANAGEMENT PRESENTATION ASQ- GREATER HOUSTON SECTION 1405 Lila Carden, Ph.D., MBA, PMP University of Houston Instructional Associate Professor
What is Project Management? How does it affect how you do your job?
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 15 Project Management McGraw-Hill/Irwin.
Task: Copyright © 2003 PM tec, Inc; D. Sankey; D. Padelford. All rights reserved. 1 Fast Start For Projects  Electric Dipole Moment Project Facilitator:
Risk Management Project Management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Chapter 8 Managing Project Risk Copyright 2012 John Wiley & Sons, Inc. 8-1.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Risk Simulation Lecture No. 40 Chapter.
Management & Development of Complex Projects Course Code - 706
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
AMERICA’S ARMY: THE STRENGTH OF THE NATION Mort Anvari 1 Cost Risk and Uncertainty Analysis MORS Special Meeting | September.
Project Management Process Groups and Knowledge Areas Source: PMBOK 4 th Edition Prepared
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.4-1.
Peg Johnson, Owner EVMS-Solutions 1 Peg Johnson
Project Schedule PLAN IT!. Project Schedule Project Schedule is based on Work Breakdown Structure (WBS) Define the WBS correctly or the Project Schedule.
TOF Project Construction Project Plan
Calculating Project Schedule Risk Using Monte Carlo Simulation Curt Blair, PMP.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Lecture # 17 PRM 702 Project Risk Management Ghazala Amin
VMcG 2/11/02 Critical Chain as an Extension to CPM Vincent McGevna, PMP February 11, 2002
8-1 Establish Cost/Schedule Performance Impacts Program Requirements Assess Risks Evaluate Risk Handling Options Evaluate Subcontractor Risks Establish.
Agenda Interthink – 2003 Organizational Project Management Baseline Study –Industry Profile –Country Profile –Organization Size –Data On Schedule –Data.
Quantitative Project Risk Analysis 1 Intaver Institute Inc. 303, 6707, Elbow Drive S.W., Calgary AB Canada T2V 0E5
The Project Management Institute Introduction / Chapter 1.
XLIX Engineering Design Firm © 2010 ENGR/ETGR Definition of Project 1 A project is “…a combination of human and non-human resources pulled together.
Earned Value as the Main Driver for Integrating Project Management Michael A. Hatfield PMP, CCC David J. Post PE.
MONTE CARLO ANALYSIS When a system contains elements that exhibit chance in their behavior, the Monte Carlo method of simulation may be applied.
Materials for Lecture 19 Readings Chapter 14
P r o j e c t : from INITIATING to CLOSING ( 1 ).
Felix Sanchez and Don Cole
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Orlando Critical Chain as an Extension to C P M Orlando A. Moreno, PMP February,
Toward A Framework for Implementing Systems Engineering Development for Complex Systems Karl L. Brunson, GWU Thomas A. Mazzuchi, D.Sc., GWU Shahram Sarhani,
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Software cost and effort estimation will never be an exact science. Estimation is very difficult to do, but is often needed Too many variables can affect.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Project Monitoring
Project Management BBA & MBA
Plan Risk Management Outputs T &T Inputs Project Management Plan
Managing Project Risk Chapter 8 Copyright 2012 John Wiley & Sons, Inc.
Homework 8 - Monte Carlo Simulation using Minitab
Project Management Processes
CPM, PERT & Schedule Risk Analysis in Construction
What’s New in SEER-H The Galorath Team.
Part II Project Planning © 2012 John Wiley & Sons Inc.
PMI North Area PMP Exam Study Group
Risk Adjusted Project Schedules
Project Risk Analysis and Management: L3
Agile Project Management and Quantitative Risk Analysis
Presentation transcript:

©2001 Plan B Systems Inc. PBSi Quantitative Cost/Schedule Risk Analysis

©2001 Plan B Systems Inc. PBSi Quantitative Analysis All risks have potential impacts on –cost –schedule Impacts are rated in the RM process –dollars –months All risks are linked to –area (of program –WBS #

©2001 Plan B Systems Inc. PBSi Quantitative Analysis Your plan has –cost –schedule allocated to plan elements –cost accounts –tasks

©2001 Plan B Systems Inc. PBSi Quantitative Analysis Risks WBS # Cost Impacts Budget Time Impacts Schedule Map

©2001 Plan B Systems Inc. PBSi Impact Table

©2001 Plan B Systems Inc. PBSi Quantitative Analysis NOW, interview risk managers Work with the impact table Determine three point estimates. –Best caseno risks impact –expected casesome risks impact –worst caseall risks impact Use lots of common sense

©2001 Plan B Systems Inc. PBSi Quantitative Analysis

©2001 Plan B Systems Inc. PBSi Quantitative Analysis Note that the manager may already have some reserve in his plan. This needs to be taken into account in establishing the impacted estimates

©2001 Plan B Systems Inc. PBSi Quantitative Analysis Run Monte Carlo Simulation Randomly combine the distributions Run many different times (>100) Best Expected Worst Cost or Schedule for WBS # Probability Probability Distribution for cost /schedule of WBS#

©2001 Plan B Systems Inc. PBSi Qualitative Analysis Outputs are –Cost Probability Distributions for project –Schedule Probability Distributions for milestones

©2001 Plan B Systems Inc. PBSi Option1: Quantitative Cost Risk Analysis Prerequisite: Project Cost Breakdown by WBS

©2001 Plan B Systems Inc. PBSi Option 2: Schedule Risk Analysis Cumulative Probability of Meeting Schedule % Set Date Prerequisite: Project Logic Network/PERT 80% 50% 10% Phase 2 Phase 3 Phase 1

©2001 Plan B Systems Inc. PBSi Qualitative Analysis Provides assessment of: Adequacy of management reserves Achievability of critical milestones Integrates risk management into project planning, not just project management