I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County.
From I-24 (MP 44) to I-64 (MP 92) is 48 miles ADT 2009 ADT = 30,000 vehicles per 2.2% growth rate 2030 ADT = 48,000 vpd 2009 Average Daily Truck.
TEAMING FOR SUCCESS “TXDOT IS HERE TO HELP” Site Selection and Access For Large Distribution Centers 1 Several DCs in industrial park near Alliance Airport.
Measure M Sunset Action Plan. Overview  Promises Made, Promises Kept  Funding Picture  Use of Measure M (M1) Freeway Funds  Next Steps 2.
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Santa Maria River Bridges Widening. Project Location.
Meade County Experience with Alternatives to Paving Ken McGirr Meade County Highway Supt Sturgis, SD.
Module 7 Exercise Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users.
Transportation in Northern Kentucky Rob Hans, P.E. Chief District Engineer, District Six SAME, Cincinnati Post - April 15,
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Signs Keep it Simple. Which are on ramps? Exits?
Interchange Design Nick Hoernke, Bill Roth and Eric Sorensen.
Interchanges, Arterials, And Networks Last Week. Interchanges Freeway – Multilane highway Ramps and weaves are the same Problem comes in when you have.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
SECTION 3. Centerline and Edge Line Final Rule DECEMBER 1999.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
National Road Pricing Conference June 4, 2010 Jennifer Tsien, PBS&J Angela Jacobs, Federal Highway Administration.
The Roads Ahead Leroy D. Alloway, Director Community Development.
Runways – 7 July Paul Harwood
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
The Crescent Corridor Intermodal Freight Project Improving Lives and Livelihoods IN & AROUND DC Washington, DC December 16,
C ONSIDERING L ARGE T RUCKS IN THE D EVELOPMENT OF T RAFFIC M ANAGEMENT P LANS Neil Boudreau, MassDOT State Traffic Engineer April 13, 2015.
CAT Realignment and Reconstruction of Rt. 28A Town of Olive Ulster County, New York January 2009.
Interstate 95 Corridor Improvement Program June 20, 2012.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Southern Bridge Project Brown County Executive
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
Interstate 2.0: a 21 st -Century Network Financed by All- Electronic Tolling by Robert W. Poole, Jr. Director of Transportation Policy Reason Foundation.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
6-Answers-1 LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Exercise – Part A – Session #6.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Metro Highway Program Presentation to CMAA Abdollah Ansari
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Company LOGO Georgia Truck Lane Needs Identification Study Talking Freight Seminar March 19, 2008 Matthew Fowler, P.T.P Assistant State Planning Administrator.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Geometric Design: General Concept CE331 Transportation Engineering.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
Regina Bypass Project Information Session. Saskatchewan.ca Outline Background –The need for a bypass –Selecting the route –P3 delivery and procurement.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Indiana MUTCD: for Operations & Maintenance Issues/Solutions – Part II.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
6-1 LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Exercise IX – Session #6.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
The I-465 West Leg Reconstruction Project
Regional Roads Committee
Interstate 15 North Phase 4
District 3 Complete Streets Projects
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
River to Sea TPO Meeting US 92/International Speedway Boulevard
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Geometric Design: General Concept CE331 Transportation Engineering.
Design Criteria CTC 440.
Walker Street Reconstruction Project 25% Design Public Hearing
Presentation transcript:

I-10 Exercise

Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from the Canal Road interchange to the Lorraine Road interchange. The mainline structure over US 49 will have to be replaced to accommodate the widening.

Gulfport, MS Area Map Project Limits

Freeway add-lane project International Airport Regional Mall Project Limits Project Limits

Major Interchange Reconstruction Widen and replace structure

Add lane project $ 89 Million project estimate Length of project – 4 miles Rebuild mainline structure at middle interchange Existing concrete pavement with proposed concrete additional lane

Existing 4-lane divided highway Interstate Mainline 10 ft. 12 ft. 10 ft.35 ft. Shoulders not structural

NHI A 12-8 Completed section 10 ft.12 ft. 10 ft.12 ft.

Existing Conditions Freeway – major East / West Interstate  2 lanes each direction  Rapidly growing area West of location  Major employer South of East project limit  44,000 ADT (2010) - 65,000 ADT (2030)  Speed limit 70 MPH  24% trucks  Region lacking alternate route network  Possible arterials from middle interchange – South to East

Existing Conditions (cont’d) Crossroad – major interchange  Major US Route in area  3 lanes in each direction  Signalized intersections  32,000 ADT (2010) – 36,000 (2030)  Speed limit 45 MPH  35% trucks (major port south of interchange)  Strip development near regional mall

Part 1: Impacts and Alternatives Assess Impacts (non-quantitative)  Significant project? Why or why not? Identify stakeholders Identify and Evaluate alternative strategies  Contract options  Construction options  Traffic management options

Group Reports Outs on Part 1

Part 2: TMP Development Components of the TMP  What would be included in the TMP for this project?

Traffic Operations What improvements should be included in the traffic operations plan for the TMP?

Public Information and Stakeholders Identify stakeholders  Who needs to be involved and when  How to engage stakeholders Develop Public information program  What is message  Who needs to know  How to effectively get the message out  Measure effectiveness