A86 Project 2 33 year-old private motorway concessionaire company (financing, construction, operation) $800 million (U.S.) per year revenue 550 mile network.

Slides:



Advertisements
Similar presentations
Overview of a Timely Publication. Transportations importance has been recognized since colonial times National defense Economic vitality Quality of life.
Advertisements

Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
A framework for organising and financing infrastructure provision Jan-Eric Nilsson, VTI.
Expanding the Potential of Tolling: A 21 st Century Look AASHTO November 18, Brian Peters Florida DOT, Assistant Secretary of Finance and Administration.
Getting Started with Congestion Pricing A Workshop for Local Partners Federal Highway Administration Office of Operations.
THE PRACTICE OF TOLLING Theory in Motion May 7, 2013 Michael Copeland Yagnesh Jarmarwala Justin Winn.
Returning to Our National Waterways Dabney Hegg U.S. Senate Committee on Commerce, Science and Transportation.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
GE541 Economic Geography of Transport October 30th.
INTERNATIONAL TRANSPORT FORUM Transport Russia Moscow, 18th to 20th of Novembre Vincent PIRON VINCI Concessions.
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
Built Infrastructure: Overview and Issues H. Scott Matthews February 10, 2003.
Highways: free or toll?. In the past, roads were considered a public good Now it is possible to make people pay: should roads be produced by the private.
Steve Heminger Executive Director Metropolitan Transportation Commission Transportation Research Board Executive Committee June 17, 2005 TOLL: The Four.
MAINTENANCE & TRAFFIC OPERATION INCIDENT MANAGEMENT.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
91 Express Lanes Overview Value Pricing for Transportation in the Washington Region Conference Greg Hulsizer Cofiroute Global Mobility Washington, DC June.
An Overview of Road User Charging Systems Polish Ministry of Transport and World Bank Workshop on Road User Charging Systems Cesar Queiroz Roads and Transport.
Institut IGH d.d. 5. Construction. Institut IGH d.d. 5. Construction.
The Roads Ahead Leroy D. Alloway, Director Community Development.
SPECULATING ABOUT THE FUTURE OF SURFACE TRANSPORTATION Presentation by C. Kenneth Orski Editor/Publisher of Innovation Briefs New York Metropolitan Transportation.
I-680 Value Pricing: A “Smart Carpool “ Lane Demonstration Project June 2004.
Quantifying Transportation Needs and Assessing Revenue Options: The Texas Experience presented to The Arkansas Blue Ribbon Committee on Highway Finance.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
Transportation Program Status Orange County Transportation OCBC Infrastructure Committee Meeting April 14, 2009 Kia Mortazavi, OCTA, Executive Director,
WSDOT SW Region, Vancouver, WA December 7, 2009 WSDOT SW Region, Vancouver, WA December 7, 2009 Tolling Study Committee.
Finance: The Critical Link The Transportation – Land Use – Environment Connection Brian D. Taylor October 2003 Institute of Transportation Studies.
Construction Conference Construction Conference NDDOT’s: NDDOT’s: Future Federal Funding Future Federal Funding State Legislative & Budget issues.
FOCUS AREAS ON NATIONAL ROADS Congestion. FOCUS AREAS ON NATIONAL ROADS Causes – Traffic Density.
Convergence of Transportation Policy and RFID Enabler of Future Transportation Policy Chris Body Mark IV Vice President, Business Development.
Funding US Infrastructure NW Financial Group, LLC.
Purpose of Work Shop Share Ohio’s experience with a full closure reconstruction: the rationale, challenges, implementation and benefit.
Public Private Partnerships: Their Limits and Potential for the Private Provision of Transportation Infrastructure Adrian Moore, PH.D. Vice President Reason.
1 CTC Discussion P3 Ingenuity Made Congestion Managing Pricing a Success James Martling, April 9, 2008.
AT THE CROSSROADS Building for the Next Generation Council of State Governments May 30, 2008 Lexington, Kentucky.
More on supply and demand relationships. Characteristics of congestion  Unlike the production of other goods, in transportation consumers provide their.
Interstate Tolling: Why and How by Robert W. Poole, Jr. Director of Transportation Policy Reason Foundation
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
C OMMITTEE FOR A DELAIDE R OADS Adelaide’s Missing North-South Link.
I-680 Value Pricing: A HOT Lane Demonstration Project of “Smart Carpool Lanes” Sponsor: Alameda County Congestion Management Agency 2003 Sponsor: Alameda.
Orange County Business Council Infrastructure Committee Overview of RCTC’s Major Projects December 8, 2015.
1 Grant Anticipation Revenue Vehicles (GARVEE) Bond Presented to the California Transportation Commission July 25, 2007.
Regional Transportation Council Mobility Plan Workshop North Central Texas Council of Governments November 12, 2015.
Transportation System Management & Intelligent Transportation Systems May 5, 2009 Steve Heminger Metropolitan Transportation Commission.
Transportation Systems Management and Operations: Why It Matters Presenter Name Date AGENCY LOGO Photo: © Shutterstock.com/iofoto ( )
I-75 South Metro Managed Lanes. Project Description Two reversible toll lanes along I-75 South 12 miles from SR 155 to SR 138 Anticipated opening date.
Henri Stembord Ring Road Management. 2 Defenitions Ring Road or Beltway? Ring Road = series of roads within town for orbital distribution Beltway = Motorway.
Solving the SR-520 Problem © 2005 Chaisy, Hurvitz, Jiang, Jun, ShinnersSlide 1 (of 37) Solving the SR-520 Problem prepared for UTRAN prepared by INSTEP.
Intelligent and Non-Intelligent Transportation Systems 32 Foundations of Technology Standard 18 Students will develop an understanding of and be able to.
Valley Metro Update Open House and Public Hearing March 9, 2007.
Making the Job-Infrastructure Connection CALCOG Region Issues Forum Darin Chidsey.
Simon Amor Asset Development Manager
A 86 Tunnel. 2  Private motorway concessionaire company founded in 1970  Subsidiary of Vinci Group  $1 000 million (U.S.) per year revenue  1,091.
DFW Connector Project Main Street Bridge Starting in March 2010 Subject to Change.
INTELLIGENT TRANSPORTATION SYSTEM DONE S.DHARANI DHARAN S.JEEVAANANTH KONGU POLYTECHNIC COLLEGE.
Solving the SR-520 Problem © 2005 Chaisy, Hurvitz, Jiang, Jun, ShinnersSlide 1 (of 31) Solving the SR-520 Problem prepared for UTRAN prepared by INSTEP.
Review and Comment on Draft 2009 Ten-Year State Highway Operation and Protection Plan Presented to California Transportation Commission February
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Facing Funding and Weather Challenges: Impact of Weather Events on Treatment Selection and Pavement Condition PPRA Fall Meeting 2014 November 17-19, Baltimore,
Stage 2 Light Rail Transit Program “In the ground ready”
21st Century Transportation Committee Finance Subcommittee
Florida Transportation Commission FY 2009
MODULE 2: TSMO Strategies
THE USER PAYS PRINCIPLE
The Business Imperative of Public-Private Partnerships The P3 Conference – Dallas, Texas February 27, 2018 Unrestricted © Siemens AG 2018 siemens.com/
MODULE 2: TSMO Strategies
Presentation transcript:

A86 Project 2 33 year-old private motorway concessionaire company (financing, construction, operation) $800 million (U.S.) per year revenue 550 mile network in France 120 miles under development 2,000 employees Worldwide experience: SR 91 Express Lanes in California Toll Collect in Germany Dartford Crossing and Severn Bridges in the UK Chilean Collipulli motorway in Chile About Cofiroute

A86 Project The Need l No public funding to complete A86 l Commute times increasing l Increasing traffic in area impacting other roads l Sensitive environmental and political area

A86 Project Project Goals l Complete the missing link of the radial freeway l Improve suburb to suburb travel l Reduce surface travel l Contribute to the improvement of the quality of life of the neighborhood l No tax dollars used

A86 Project The Project l Two tunnels: l East – 6.5 miles 3 Two-level 3 Three lanes each direction 3 Uni-directional 3 Light vehicles only l West – 4 miles 3 Single level 3 One lane each direction 3 Light vehicles and trucks

A86 Project East TunnelWest Tunnel

A86 Project Lower Level

A86 Project Value Pricing For Throughput and Revenue Production Means of keeping the tunnels congestion-free Supports financing of construction and operations

A86 Project Focus On Safety l Traffic Management 3 Entrance control 3 One-way traffic 3 Trucks separated from passenger vehicles 3 Automatic Incident Detection 3 Variable message signs  FM radio override 3 Customer Assistance Patrol l Design and Environmental 3 Driver sensitive design (lighting, color) 3 Independent ventilation for each level 3 Emergency access/refuge bay every 200 meters

A86 Project Focus On The Environment l Extensive landscaping l Architecture design and above-ground facility location blends into landscape l Minimized above-ground facilities while maintaining safety Noise reduction

A86 Project Financing and Risk Sharing l Revenue and traffic l Construction cost l Financial risk l Operation cost l Government action Cofiroute Government Cofiroute - Concessionaire/Operator SOCATOP - Design/build contractor $1.5 billion (U.S.) private investment Financed by Cofiroute 70 year concession Financed only with tolls Risk sharing

A86 Project Benefits A new road gets built No tax dollars are used Time savings for customers 15% reduction of surface traffic Relative gain in accessibility Creation of 800 jobs at construction stage Aprox 100 additional jobs during operations

A86 Project Development Timetable l Project first envisioned as surface project by state l President decides to study all alternatives l Underground project proposed by Cofiroute l Concession granted to Cofiroute l Major construction begins l Concession challenged/construction stopped – 1998 l Government rebids project – 1998/1999 l Cofiroute re-awarded concession l Construction begins again l Anticipated opening of first 4 miles – 2005

A86 Project More Information Visit the A86 West Exhibition or our website : Greg Hulsizer Cofiroute Global Mobility (714)