Presentation is loading. Please wait.

Presentation is loading. Please wait.

Institut IGH d.d. 5. Construction. Institut IGH d.d. 5. Construction.

Similar presentations


Presentation on theme: "Institut IGH d.d. 5. Construction. Institut IGH d.d. 5. Construction."— Presentation transcript:

1 Institut IGH d.d. 5. Construction

2 Institut IGH d.d. 5. Construction

3 Institut IGH d.d. 6. Structures Bridges More than 800 different structures

4 Institut IGH d.d. 6. Structures

5 Institut IGH d.d. 6. Structures

6 Institut IGH d.d. Tunnels Total length of tunnels: 85 km The longest tunnel: 5,79 km

7 Institut IGH d.d. 7. Financing fuel tax: EUR 0,082/lit toll collection charges for the use of roadside land loan proceeds Total cost of motorway system 2001 – 2008: EUR 9 billion loans: EUR 5.3 billion average price per km: 8 million Average Anual Daily Traffic 2010: 12.404vehicles

8 Institut IGH d.d. Total toll collection revenue in 2010: €267 Mil Toll collection: I CAT: 0,053 EUR/km II CAT: 0,080 III CAT: 0,120 IV CAT: 0,170 7. Financing

9 Institut IGH d.d. 8. Impacts (sustainability) Economy: transit, tourism, new jobs… Social impact: integration

10 Institut IGH d.d. 8. Impacts (sustainability) Roads open but also create new vistas Each generation of builders has the responsibility to leave the works worthy to be shown in postcard pictures.

11 Institut IGH d.d. 9. Future Pelješac Bridge

12 Institut IGH d.d. 9. Future Railways + ports Connections to towns New concessions?

13 Institut IGH d.d. Thank you for your attention The Developement of Motorway network in Croatia


Download ppt "Institut IGH d.d. 5. Construction. Institut IGH d.d. 5. Construction."

Similar presentations


Ads by Google