Quality Systems Burton Brewery. Our QEH&S policy  Q, EH&S Policy is signed by the Head of Technical Compliance for MolsonCoors (Greg Wade) and Leo Kiely.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

Environmental Management System Implementation
[Organisation’s Title] Environmental Management System
FEDIAF Guide to Good Practice for the Manufacture of Safe Pet Food TRAINING PACKAGE Module II Quality Management System.
Environmental Management System (EMS)
ISO 9001 : 2000.
SIEP HSE Management System
Governance and quality Ian Sharp November 2006 Aims of the presentation To highlight the importance of quality management and quality assurance in the.
NCS International The ABC‘s of Safety Management Systems – A Simplified Approach Presenter: Ian Ackland BE MBA FIEAust MEIANZ MSIA.
Risk & Safety Presentation January 8, 2013 Bryan Sabari, CUSP Manager Corporate Safety
BRC Storage & Distribution Safety and Quality Management System Training Guide
Contractor Management and ISO 14001:2004
22000 Food Safety Management Systems
ISO 14001:2004. –Fourth level » ‹date/time›‹footer›‹#› Suresh Surana & Associates And Lemon Consulting Analysis by Mr. QMS TEAM ISO 14001:2004 www. lemonconsulting.net.
Environmental Management Systems Refresher
Quality Management.
OHSAS 18001: Occupational health and safety management systems - Specification Karen Lawrence.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
ASPEC Internal Auditor Training Version
QMS ISO 9001:2008 Introduction to QMS 9001:2008 and system auditing.
THE PRINCIPLES OF QUALITY MANAGEMENT. DEFINING QUALITY Good Appearance? High Price? The Best? Particular Specification? Not necessarily, but always: Fitness.
Quality Representative Training Version
5.2 Personnel Use competent staff Supervise as necessary
Creating Lasting Change for Your Business ISO 9001:2000 Management System Overview.
WHAT IS ISO 9000.
Ship Recycling Facility Management System IMO Guideline A.962
Health, Safety and Environment Policy. We are a SafeProduction organization At Vale, we are committed to sustainable development. Meeting the needs of.
Forensic Audits of Your QEHS Management System. © 2006 ABS Consulting, Inc.
Implementation of ISO 14001/OHSAS TMS Consultancy Ltd.
Basics of OHSAS Occupational Health & Safety Management System
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
ELEMENTS OF EFFECTIVE SAFETY AND HEALTH PROGRAMS IN ACADEMIC AND REGIONAL THEATERS Health & Safety 260 Bill Reynolds Scott Hansen Greg Petruska.
Understanding ISO 22000:2005 TCISys.com.
3rd Party Audits and Regulatory Inspections Food Industry Perspective
Health and Safety Policy
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
ISO GENERAL REQUIREMENTS. ISO Environmental Management Systems 2 Lesson Learning Goals At the end of this lesson you should be able to: 
1 Implementing a Business Management System compliant to ISO 9001:2000.
FEDIAF Code of Practice for the Manufacture of Safe Pet Food TRAINING PACKAGE Module II Quality Management System.
Self Assessment Using EFQM Excellence MODEL Down Lisburn Trust’s Experience of Continuous Improvement John Simpson Down Lisburn Trust.
QUALITY MANAGEMENT STATEMENT
ISO, QMS & CIR Awareness 2013.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
Program Implementation MM.DD.YY. To comply with the OHSA and regulations To demonstrate management's commitment to health and safety To show employees.
Visit us at E mail: Tele:
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
Integrated QHSE Policy Statement Kloeckner metals UK is the largest mill independent multi metal stockholder & distributor in the UK and Ireland, and a.
Employee Orientation to ISO Sygnetics, Inc. is committed to quality. ‘Quality’ is the ability to consistently produce a product or service that.
Energy Energy comes in many forms including electricity, gas, oil and steam and is a resource used by organisations worldwide Energy is becoming increasingly.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
A Quality Management System for a Project Management Office April 26, 2006 Pat Garrett, PMP.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
BRC Packaging ISSUE 5 Global Standard for Packaging and Packaging Materials.
Documentation Requirements for Hospital Accreditation -By Global Manager Group.
Hospital Accreditation Documentation Process & Standard Requirements
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Adding value through health and safety. Introduction to Portakabin Part of the Shepherd Group - a family company with family values Cares for employees;
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
UNDERSTANDING ISO 9001:2008.
GS-R-3 vs. ISO 9001:2008 Requirements - 4
ISO/IEC
ISO 14001: 2004 Environmental Management Review Presentation
Health and Safety Policy
Safety Accountabilities
UNIT V QUALITY SYSTEMS.
BRC Packaging ISSUE 5 Global Standard for Packaging and Packaging Materials.
Lockheed Martin Canada’s SMB Mentoring Program
Our New Integrated Business Management System [“IMS”]
The British Retail Consortium (BRC)
Presentation transcript:

Quality Systems Burton Brewery

Our QEH&S policy  Q, EH&S Policy is signed by the Head of Technical Compliance for MolsonCoors (Greg Wade) and Leo Kiely – the Chief Executive Officer  It is a statement of the company’s commitment to Q, EH&S

Molson Coors Q EH&S policy We will: Molson Coors Quality, Environmental, Health and Safety Policy Our business is the manufacture, wholesaling and international distribution of branded alcoholic beverages We will: Assure the quality and safety of all brands manufactured by Molson Coors Reduce environmental impact and prevent pollution Prevent employee injury and illness Comply with all applicable legislation and other requirements to which we subscribe to satisfy our customers, consumers and stakeholders and enable the company to “win in the beer business”. We will achieve this by implementing an enterprise wide Q E H&S management system that Sets standards for Q, E H & S Sets, gives visibility to and reviews the company’s Q, E H&S objectives, targets and results Identifies accountabilities and responsibilities for Q, E H & S Continually trains and develops our employees in order to instil ownership of Q E H & S at all levels of the organisation Drives continual improvement Is based on internationally recognised standards for Q E H & S management Is regularly reviewed for its effectiveness Ensures that this policy is communicated and understood within the organisation

Quality Objectives These are our quality objectives that have been set by the MolsonCoors Leadership  Deliver process and product consistency  Assure package appearance and integrity  Ensure product safety  Follow Good Manufacturing Practice (hygiene)

Global Technical Compliance Manufacturing Excellence Awards Will measure achievement of the Q, EH&S and business objectives 1.Best Quality Performance 2.Best EH&S Performance 3.Best Productivity Improvement 4.Best Overall Brewery Performance

How quality performance will be measured  We need some common standards: –Global metrics –CBL metrics

Why do we need a Quality Management System ?  We need an effective quality management system to: –achieve the quality objectives –drive continual quality improvement –do things right first time –reduce loss and waste

Quality Management System – so what is it?  Quality Management System (QMS):  The set of procedures for determining and implementing the intentions of an organisation as regards quality.

ISO9001:2000  Is a “best practice” model for a Quality Management System  Its is not a list of rules that say how we have to work.  The Coors Brewers QMS is modelled on ISO9001:2000 An effective QMS is a pre-requisite for BRC and FEMAS certification

What does having a Quality Management System require us to do?  Determine the needs and expectations of customers and other interested parties  Establish a Quality Policy and Quality Objectives based on our customer’s requirements and business needs  Determine the processes and responsibilities (procedures) necessary to achieve the quality objectives  Establish methods to measure how well we are achieving the quality policy and objectives  Provide resources  Establish and apply a process for continual improvement

Coors Brewers QMS  Established for > 20 years  In all 3 breweries, maltings and HQ (Strategic sourcing, Logistics, Technical (NPD, Pack Dev, graphics, Tech Gov)).  Certified to ISO9001:2000 by LRQA  Includes HACCP, BRC and FEMAS requirements and controls  Uses the MolsonCoors QEH&S policy and objectives  Comprises CBL corporate documents and brewery local documents

Structure of the Coors Brewers Q,EH&S system MolsonCoors Q,EH&S Manual QEH&S Policy and objectives Coors Brewers Q EH&S Manual Coors Brewers corporate documents Product recipes and specifications, corporate procedures, Minimum Sampling plan, brewing best practice, hygiene policy etc Burton brewery documents Burton brewery dSOPs, specifications, forms etc

Burton brewery QMS documentation  Local Quality Manual –Describes scope and site responsibilities for quality  dSOPs –Describe the best way to operate the process  Local specs –For product in process to meet group final package specs  Local sampling and test plans –Must meet the minimum corporate requirements  Forms –When filled in become Quality records  HACCP plans –Identify the CCPs for food safety All documents are in the Document store in the “Burton brewery” database

What does having a Quality Management System require us to do?  Determine the needs and expectations of customers and other interested parties  Establish a Quality Policy and Quality Objectives based on our customer’s requirements and business needs –MolsonCoors Quality Policy –MolsonCoors Quality Objectives Deliver process and product consistency Assure package appearance and integrity Ensure product safety Follow Good Manufacturing Practice (hygiene)

What does having a Quality Management System require us to do?  Determine the needs and expectations of customers and other interested parties  Establish a Quality Policy and Quality Objectives based on our customer’s requirements and business needs  Determine the processes and responsibilities (procedures) necessary to achieve the quality objectives –Quality system proceduresQuality system procedures –dSOPs

What does having a Quality Management System require us to do?  Determine the needs and expectations of customers and other interested parties  Establish a Quality Policy and Quality Objectives based on our customer’s requirements and business needs  Determine the processes and responsibilities (procedures) necessary to achieve the quality objectives  Establish methods to measure how well we are achieving the quality policy and objectives –Sampling and test plans –Test methods –Audits –Management review –Customer/consumer complaints

Measuring quality performance  Measurement, analysis and improvement is a key requirement of a QMS  Quality Award is our measure of quality –Set of metrics that measure (ultimately) consumer satisfaction –Driver for continual quality improvement  Do your team know how their quality performance is being measured?  Do you review quality performance with your team?  Do they know how to improve results in their area?

What does having a Quality Management System require us to do?  Determine the needs and expectations of customers and other interested parties  Establish a Quality Policy and Quality Objectives based on our customer’s requirements and business needs  Determine the processes and responsibilities (procedures) necessary to achieve the quality objectives  Establish methods to measure how well we are achieving the quality policy and objectives  Provide resources –People (training and records) –Equipment –IS systems –Working environment –Information

Training  We must –Identify the competencies required for the job –Identify training needs against these competencies –Deliver training –Keep records Records provide the evidence of competency Do you have comprehensive training records for your team to demonstrate their competency in carrying out their duties?

dSOPs  Dynamic Standard Operating Procedures –Describe the optimal way to carry out a critical process/task –Enough information for an untrained person to carry out one cycle of the task with all the correct parts –Operators must be trained and assessed against them –dSOPs must be continually reviewed and updated to capture learnings and improvements –WCM – one point lesson

What does having a Quality Management System require us to do?  Determine the needs and expectations of customers and other interested parties  Establish a Quality Policy and Quality Objectives based on our customer’s requirements and business needs  Determine the processes and responsibilities (procedures) necessary to achieve the quality objectives  Establish methods to measure how well we are achieving the quality policy and objectives  Provide resources  Establish and apply a process for continual improvement –Incident reporting –Corrective and preventive action –Quality review and action planning

Incident reporting  When we have failures in the system we must implement corrective action to : –Deal with non-conforming product –Put the process back in control –Stop it happening again –Records of these actions must be kept to demonstrate due diligence and continual improvement  When to report and incident 1.HACCP CCP exceeded limits 2.Occurrance that results in product being written off 3.Hold order for quality reasons

Thank you for your attention - hopefully!!