Power Purchase Agreements Owners Perspective Matt Gudorf – UC Irvine Campus Energy Manager 949-824-9309.

Slides:



Advertisements
Similar presentations
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Advertisements

SERVICE LEVEL AGREEMENTS The Technical Contract Within the Master Agreement.
USDA Child Nutrition Programs.  Procurement (purchasing rules) must apply to all purchases that are supported, in whole or in part, with non-profit food.
Presented by BUSINESS INSURANCE FOR CONTRACTOR CANDIDATES EXPERTS IN FREELANCER & CONTRACTOR INSURANCE Tania Bowers.
RFP vs. IFB A BASIC APPROACH TO THE BID PROCESS – WHEN RFPs or IFBs ARE USED 2010 AASBO Spring Pre-Conference Workshop Rosa Saenz, PGPC, Inc. Bill Munch,
November 19, 2013 Preparing a Successful RFP to get Desired Results.
Surety Bond Claims State of Colorado 05/15/2013. State of Colorado Surety Bond Overview Construction Contract Surety Bonds  Bid – Guarantees bidder will.
Subpart S - SEMS September 11, 2012 Prepared by: BSEE, Office of Safety Management Author: Jason Mathews.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
2012 Solar Bulk Purchase for DC Nonprofits and Small Businesses.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Renewable and Energy Efficiency Projects RFP to Implementation.
Solar System Project Overview Presented by: Brandon Robertson, Town Manager April 29, 2014.
DOL AME Grant RFPs Manufacturing Lab Equipment Pre-Award Webinar July 25, 2013.
Marcy Mealy Procurement Specialist CDBG Program
Contractor Safety Management
Chatsworth Water Works Commission
PROCEDURES FOR SELECTING THE CONTRACTOR
What - How Does Solar System Work? Grid-connected projects can apply for Net Metering (utility meter spins backwards)
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
Farm Leasing Basics ASAP Business of Farming Conference, February 22, 2014 Eric Mine – Land Loss Prevention Project All Rights Reserved Eric Mine,
Practical Ways For Towns to Save Money With Clean Energy Projects Paul Michaud Murtha Cullina LLP April 30, 2014.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
1 State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
BUILD WITH US. ™ Contractors
 Fifth Third Bank | All Rights Reserved Vessel Financing Choices for Ferry Operators.
Practical Ways for Towns to Save Money with Clean Energy Projects Doreen Hamilton April 30, 2014.
Sole Source Training.
Small Farm Profitability: Is Wind Energy the Answer? 1
Genesis Solar Module Brochure ™
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Advice from CPAs Ten Ways To Protect Your Business.
Legal Division Commercial and Property Law Unit Services Presentation by Regina Ewing Senior Lawyer, Commercial and Property Law Unit Legal Division.
Saving With Solar: LESSONS FROM THE MORRIS HYBRID Power Purchase Agreements MODEL April 18, 2013 ASES ANNUAL CONFERENCE BALTIMORE, MARYLAND.
Optimizing Greening Schools for a Carbon Constrained Future Presented to: The Association of California Construction Managers Presented by: Stephanie R.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
Iowa Wind Entrepreneurship Workshop Steps in Organizing, Utility Agreements, and Financing October 21, 2005 Iowa Community Entrepreneurship Academy Manning.
You Don’t Have To Be a Wizard to Understand the Private Financing of Solar Projects APRIL 3-6, 2013, LONG BEACH, CA These materials have been prepared.
Boreal Renewable Energy Development Ferriter Scobbo & Rodophele PC Outback Engineering Richard C. Gross, Inc. March 12, 2009 Notus Clean Energy LLC Wind.
Chapter 16 Capital Goods McGraw-Hill/Irwin Purchasing and Supply Management, 13/e © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Solar Energy Services: Delivering Cost Effective Solar Power March 18, 2004 Claire Broido SunEdison, LLC (443) 226.
Using the Design-Build Approach to Meet Energy Reduction Goals March 2012.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
MARK HARNETT VP Complete Solar. PART ONE: Incentives & Industry Tiers.
Choosing the Right Solicitation Alan A. Phillips, CPPB CTPM Texas Southern University Summer 2012.
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
Cost of Going Solar in DC 4 Ways to Save! 1.DC Rebate $3/watt up to 3KW…. 2.Federal Tax Credit 30% of Total 3.Savings on your energy Bill (Net Metering.
SOLAR vs. PG&E OVERVIEW OF TOPICS Last 15 years of PG&E rates. Solar/PG&E rates. PPA: Pros and Cons. Benefits of going Solar/Rebates Shade structures &
Creating A Cleaner Energy Future For the Commonwealth Renewable Closed Landfills Eileen McHugh Municipal Energy Programs Coordinator July 26,
Wisconsin Department of Health Services Contracting and Wis. Stat Shelley Malofsky DHS Office of Legal Counsel May 7, 2015 Wisconsin Department.
What to know? How much can you spend every month? What are Benefits to new, used & leases? Should I Buy or lease? Do I have a Down payment or Trade-In?
CICV Solar Workshop. TPO* Laid Out… Service Agreement** Tax Exempt Entities TPO TPO* Finances Builds Owns Operates Maintains Sells output and/or services.
Third-Party Solar Financing Options in New Hampshire 1.
Real Estate Principles and Practices Chapter 15 Property Management © 2010 by South-Western, Cengage Learning.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Inspection, Testing, and Maintenance of Fire Protection and Life Safety Systems.
Lee Lenox● 13.9 MW ● Lee & Lenox, MA. GREEN POWER.
Power Purchase Agreements (PPA) Owner’s Perspective What is a Power Purchase Agreement? Agreement to purchase power from a third-party provider Fixed term:
Discussion of the Differences Public Works Law and Bid Law
Solar Initiative – Next Phase Opportunity
9/18/2018 Bids CONTRACTING Khamis…..
What is the UL QFCP? FCIA Webinar Presenters:
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Solar for Hope Hope for Solar
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

Power Purchase Agreements Owners Perspective Matt Gudorf – UC Irvine Campus Energy Manager

Agenda About UC Irvine About UC Irvine Buy / Lease / PPA Buy / Lease / PPA Background Background The PPA Process The PPA Process Questions Questions Please silence your phone unless you have a really funny ringtone!

University of California, Irvine Category One research university $18M annual utilities budget Lab buildings consume 2/3 of campus energy Many energy initiatives to reduce carbon footprint

Solar Project Delivery Methods BuyingLeasing Solar PPA Upfront Capital? Yes Little or None NONE Maintenance Required YesYesNONE Performance Risk YesYesNONE System Expertise Required YesYesNONE Purchase Required Yes Yes / or Re- Lease NONE

What am I buying vs What is being provided You’re buying the power ! Not the System !

What will the Provider do? Provider Constructs/Owns/Maintains solar project for the entire length of the PPA. Provider receives federal tax credit (cash grant), State rebate and depreciates equipment Provider sells electricity at negotiated rate (with or w/o escalator) 10 to 25 year term

Allocating Risk  Before Construction Environmental Compliance (CEQA) Completion Timing Bonds/Letter of Credit Insurance Buyout Clause Underperformance Monetary Penalty Breach / Default  After Construction Maintenance Operation

RFP Decide the parameters of the PPA Establish a MAC (maximum acceptable cost) Gather information for the building possible (plans, existing warranties) Determine how to handle the Renewable Energy Credits Technical Evaluation of Proposals Price Use of space Size of system Experience Warranty (including your roof warranties) Decision Time

Request for Proposals Define the terms that fit your organization and clearly place them into the RFP Define the terms that fit your organization and clearly place them into the RFP UCI defined rooftop only installations would be accepted UCI defined rooftop only installations would be accepted Know your current electric rate structure, including demand charges. Predetermine a price with escalation you will be willing to pay for the duration of the agreement. Know your current electric rate structure, including demand charges. Predetermine a price with escalation you will be willing to pay for the duration of the agreement. You may or may not wish to include this information in your request but you will be asked about it You may or may not wish to include this information in your request but you will be asked about it Plans, Existing Warranty information. The more complete the better response you will receive. Plans, Existing Warranty information. The more complete the better response you will receive. UCI included in the RFP and Contract that all existing warranties must be maintained or acquired by the successful bidder. UCI included in the RFP and Contract that all existing warranties must be maintained or acquired by the successful bidder. The REC’s will make a difference decide if you will retain them. The REC’s will make a difference decide if you will retain them. UCI optioned the REC’s after 5 years. UCI optioned the REC’s after 5 years.

RFP Decide the parameters of the PPA Establish a MAC (maximum acceptable cost) Gather information for the building possible (plans, existing warranties) Determine how to handle the Renewable Energy Credits Technical Evaluation of Proposals Price Use of space Size of system Experience Warranty (including your roof warranties) Decision Time

Technical Evaluation of Proposals Proposal Process. Selection shall be based upon a “best value” approach. Each Proposer will submit their Proposal in two envelopes, the first covering qualifications and technical information and the second providing price information. Each Proposer must submit its proposal in two sealed “envelopes” or boxes, each one clearly labeled on the outside as: Proposal Process. Selection shall be based upon a “best value” approach. Each Proposer will submit their Proposal in two envelopes, the first covering qualifications and technical information and the second providing price information. Each Proposer must submit its proposal in two sealed “envelopes” or boxes, each one clearly labeled on the outside as: Envelope #1: Technical Proposal & Qualifications Envelope #2: Price Proposal In the RFP a scoring system should be established to evaluate submissions. In the RFP a scoring system should be established to evaluate submissions. Experience – Does the company have the capabilities / financing to follow through ? Experience – Does the company have the capabilities / financing to follow through ? Use of space – Did the proposal use only space you can dedicate to solar ? Use of space – Did the proposal use only space you can dedicate to solar ? Size of system – Is the system too big/small Size of system – Is the system too big/small O&M plan, Billing Plan, Monitoring Plan O&M plan, Billing Plan, Monitoring Plan Warranty – Are all of your existing warranties maintained and what are they providing ? Warranty – Are all of your existing warranties maintained and what are they providing ? Price – Did the proposal meet your preset maximum acceptance cost? Price – Did the proposal meet your preset maximum acceptance cost?

RFP Decide the parameters of the PPA Establish a MAC (maximum acceptable cost) Gather information for the building possible (plans, existing warranties) Determine how to handle the Renewable Energy Credits Technical Evaluation of Proposals Price Use of space Size of system Experience Warranty (including your roof warranties) Decision Time

Decision Time Yes – Move forward with a contact Yes – Move forward with a contact No – Determine why the RFP did not generate successful proposals and try again. No – Determine why the RFP did not generate successful proposals and try again. UC Irvine went through 3 rounds of RFP before the system was successfully installed. UC Irvine went through 3 rounds of RFP before the system was successfully installed.

Contract Development General Terms and Conditions Last chance to change any wording you don’t like Design and Construction Protect the campus Not your system Fire marshal Post Construction Site Visits Who’s responsible Responding to Problems Training Billing, REC’s, Audits, The next 20 years

Contract Development General Terms and Conditions Force Majeure Easements Acceptance Testing Health and Safety Host Inspection Rights Grant of License or Lease Early Termination Approvals and Permits System Removal Dispute Resolution Warranties Insurance Severability Indemnity Legal will need to be involved and this may or may not be an upfront cost to your organization.

Contract Development General Terms and Conditions Last chance to change any wording you don’t like Design and Construction Protect the campus Not your system Fire marshal Post Construction Site Visits Who’s responsible Responding to Problems Training Billing, REC’s, Audits, The next 20 years

Design and Construction Plan Review Plan Review Protecting your infrastructure Protecting your infrastructure Make sure all plans are stamped by licensed engineers for both civil, structural, and electrical drawings. Make sure all plans are stamped by licensed engineers for both civil, structural, and electrical drawings. Drawings must be reviewed and stamped by the Fire Marshal. Drawings must be reviewed and stamped by the Fire Marshal. Permitting may be required, the contactor should pull all required permits and submit copies to the owner. Permitting may be required, the contactor should pull all required permits and submit copies to the owner. It is not your system It is not your system It is important to remember in the review process you are protecting your building but not reviewing the system design. It is important to remember in the review process you are protecting your building but not reviewing the system design. Inspection Inspection As part of the contract development you may have chosen to include private inspection during the construction process. As part of the contract development you may have chosen to include private inspection during the construction process.

Contract Development General Terms and Conditions Last chance to change any wording you don’t like Design and Construction Protect the campus Not your system Fire marshal Post Construction Site Visits Who’s responsible Responding to Problems Training Billing, REC’s, Audits, The next 20 years

Post Construction Site visits Site visits Develop a procedure for system access and maintenance. The contractor will most likely need to service and clean the system and a protocol for this should be established prior to completion. Develop a procedure for system access and maintenance. The contractor will most likely need to service and clean the system and a protocol for this should be established prior to completion. Who’s responsible Who’s responsible Do you know who to call if the roof leaks, there is an emergency, or you need to shut the system down? Do you know who to call if the roof leaks, there is an emergency, or you need to shut the system down? Responding to Problems Responding to Problems Have you defined the acceptable time frame for responding to problems? Who will be coming out to take care of these issues and making sure it is corrected to the owners satisfaction. Have you defined the acceptable time frame for responding to problems? Who will be coming out to take care of these issues and making sure it is corrected to the owners satisfaction. Training Training Your building now has 2 electrical feeds. Staff will need to understand that to safely work on the buildings electrical system there are new requirements. Your building now has 2 electrical feeds. Staff will need to understand that to safely work on the buildings electrical system there are new requirements. In the event of a fire / earthquake / gas leak / or other event how to safely de-energize the system. In the event of a fire / earthquake / gas leak / or other event how to safely de-energize the system.

Contract Development General Terms and Conditions Last chance to change any wording you don’t like Design and Construction Protect the campus Not your system Fire marshal Post Construction Site Visits Who’s responsible Responding to Problems Training Billing, REC’s, Audits, The next 20 years

Where are the bills going to be sent? Where are the bills going to be sent? You now have a second electrical bill that will need to be paid and verified. You now have a second electrical bill that will need to be paid and verified. Did you keep the Renewable Energy Credits? Did you keep the Renewable Energy Credits? These can be used for LEED® credits and CO2 offsets but only if you hold them! These can be used for LEED® credits and CO2 offsets but only if you hold them! Verification that the meter readings are correct is important. Verification that the meter readings are correct is important. UC Irvine has written into the contract independent meter verification at our request and how discrepancies are to be dealt with. UC Irvine has written into the contract independent meter verification at our request and how discrepancies are to be dealt with.

QUESTIONS ?

Download Link UC Irvine RFP