31/03/11FV 1 CEDAR from flammable gas safety point of view.

Slides:



Advertisements
Similar presentations
The Care and Feeding of Silane Art Garcia FM Global March 23, 2006.
Advertisements

Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Manual Set-Up for Density by Hydrometer Method ASTM D1298, D287, D6822 and IP160 Feb
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
Global Design Effort Compact Water Cooled Dump Resistor IRENG07 Wes Craddock September 19, 2007.
CEDAR MECHANICS Liverpool Conceptual Design (Subject to funding from STFC) 1 CEDAR Mechanics Conceptual Design.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
Unit 206: Domestic hot water systems
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
MICE hydrogen review Summary of system hardware. System function To provide 22 litres of liquid hydrogen for use as a muon absorber within a superconducting.
AccuMax Multi-Point Injection Mechanics
Introduction to Operation of the XL- 30 Scanning Electron Microscope Tutorial # 2 Introduction to Operation and Imaging.
CEDAR MECHANICS Liverpool Conceptual Design (Subject to funding from STFC) 1 CEDAR Mechanics Conceptual Design.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
STEAM HEATING.
MICE hydrogen review System modifications. Relief circuit repair During leak testing of R&D tests, the insulating vacuum would not go lower than
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
Patrick Thornton, SNS/FPE June 9, 2008
Iouri Ivaniouchenkov RAL Safety considerations at RAL July 9, RAL MICE Collaboration Meeting 1.
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
Pro-Science 4 th International Conference of Hydrogen Safety, September 12-14, 2011, SAN FRANCISCO, USA EXPERIMENTAL STUDY OF IGNITED UNSTEADY HYDROGEN.
ACADs (08-006) Covered Keywords Containment Isolation, actuation logic, Description Supporting Material
MICE Hydrogen Safety Functions IEC61508 Compliance & Emergency Procedures MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
1 11/11/2003 NBI Decay Tube and Windows Presentation by Ans Pardons 1 Decay Tube & Windows Introduction (Location, Planning) Decay Tube Entrance.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
High Power Dumps – RDR 10 atm. Cylinder water vessel with copper plate back end, 1.5m diameter x 6.5m long, in a 15 x 3 x 4 m^3 shielded enclosure, with.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
IBL cooling thermal chock incident 15 October The IBL cooling team.
LHCb-VELO Microchannel fracture safety system and evaporator concept 26 June 2015 Bart Verlaat 1.
Manual Density Business Today
Summary of the second Hydrogen CEDAR Safety Meeting 24 November 2008 Present: J.Gulley/ SC-GS, A.Sharma/PH-FGSO, Augusto, Cristina, Lau, Niels.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
SOME CEDAR NEWS Lau Gatignon / EN-MEF TD meeting 12/07/2011  Summary of HAZOP and Zoning meeting  Forthcoming CEDAR related work at CERN.
OILGEAR PVV PUMPS PVV 200 Performance Curves.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Installation of the T600 at Fermilab CSN2, September 22,
CEDAR MECHANICS Liverpool Conceptual Design (Subject to funding from STFC) 1 CEDAR Mechanics Conceptual Design.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
HELIUM LEAK TEST OF INNER BORE WELDS OF TUBE#TUBESHEET JOINT
Air condition installation
The PSI protium gas filling system (status report by Claude Petitjean to the Gatchina collaboration meeting June 14-17) Main components of the PSI gas.
Installation of the T600 at Fermilab Fermilab, February 15,
Replacing hydride bed with bottle Advantages No risk of diminished bed capacity Following jobs no longer necessary – Move pressure gauge – Replace cracked.
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
Chapter 37: Fluid Containment
Installation of the T600 at Fermilab
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
HFM Test Station Main Cryostat
Proximity Cryogenics P&IDs meeting
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
Fuel Supply System Service
Horizontal Installation Overview
Sandia National Laboratories
Hot Water Systems Cylinders and Systems.
GENERALPIPINGREQUIREMENTS:. Designing and erecting an efficient piping system requires certain aspects/ requirements which could be found in our PME handbook…
HAZOP Guidewords Base Set
Risk Management Student Powerpoint
Presentation transcript:

31/03/11FV 1 CEDAR from flammable gas safety point of view

VF2 31/03/11 CEDAR – ČErenkov Differential counter with Achromatic Ring focus Pumping outlet Diaphragm motor and diaphragm opening potentiometer – inside of motor cover Motors and gas control unit – will be replaced 8 quartz windows

VF3 31/03/11 CEDAR inside

VF4 31/03/11 CEDAR – in the TTC8

VF5 31/03/11 CEDAR – Vessel and gas Vessel:  Geometry: Total length - 6.2m Main vessel length - 4.5m Inner diameter cm  Steel pipe  Polyurethane foam thermal insulation – 10cm around the counter Gas:  Volume -1.1m 3  Composition – 100% H 2  Operating pressure – between 2.5 and 3.5 bar absolute, up to 4 bar during a pressure scan

VF6 31/03/11 CEDAR – gas system, nitrogen enclosure H2H2 N2N2

VF7 31/03/11 Pumping outlet Diaphragm motor and diaphragm opening potentiometer – inside of motor cover Safety valve PT100 Big O-ring of the nose Entrance window

VF8 31/03/11 CEDAR – control unit below the nose

VF9 31/03/11 CEDAR – list of possible leaks (Jens Spanggaard) Entrance Window Quartz Windows Big o-ring for the noise Top vacuum valve Top safety valve Diaphragm motor axe feed-trough (on top of H2!) Gas pipe for pressure gauge (Should be Ex proof !) Gas pipe for servo regulator Gas pipe for inlet/outlet Big o-ring for end-cap End window

VF10 31/03/11 Entrance Window Quartz Windows Big o-ring for the noise Top vacuum and safety valves Diaphragm motor axe feed-trough Gas pipe for pressure gaugeBig o-ring of end cup Exit Window

VF11 31/03/11 CEDAR – other features Equipment inside of nitrogen enclosure  240 photomultipliers operating at high voltage  Preamplifiers and signal-shaping electronics  Heat exchangers Electrical equipment of CEDAR (all motors and end-switches are 24V)  Diaphragm end-switches – inside the H2 volume ( !)  Diaphragm motor and Diaphragm opening potentiometer – inside of motor cover, on top of the front flange  Control unit below the nose  Horizontal and Vertical Position motors with end-switches and position potentiometers – downstream support  4 PT100’s: entrance window, front and back flanges, air

VF12 31/03/11 CEDAR – Noise conceptual design

VF13 31/03/11 From the minutes of H2 safety CEDAR meeting (Lau Gatignon) The diaphragm motors, the PMTs and the control unit below the nose must be enclosed in a Nitrogen enclosure at slight overpressure. Inside this enclosure a Hydrogen detector must be placed. No special precaution is required for the X/Y motors for the Cedar alignment. Quartz Windows The Hydrogen bottle will be stored in a gas building outside the cavern. Gas will be brought to the counter via a stainless tube of minimum diameter 6 mm. The gas pressure will be limited by a safety valve to a maximum of about 4 bars. This valve will be inspected regularly like all pressure valves. The return tube must be stainless steel as well and of at least 8 mm diameter, to avoid the build up of local gas concentrations. It should be equipped with no-return valves. It should release the gas outside at a sufficient height (about 3 meters above ground level). The CEDAR pressure pumps must be Hydrogen rated (“EX” norm). Similarly the nearby pumps in the beam vacuum sections just upstream and downstream. Note that the vacuum window may be damaged by the Cedar entrance or exit windows in case they rupture. Two domes shall be installed, one above the nose and control unit and one above the exit window. Both shall be equipped with Hydrogen detectors. In case all purged Nitrogen enclosures are equipped with Hydrogen detectors, the domes are probably not necessary. In case of rupture of one of the windows or Hydrogen detection by one of the detectors, a Level-3 alarm will be sent automatically to the Fire Brigade. And the Cedar pumps, motors and PMTs, as well as nearby beam vacuum pumps will be stopped. Sector valves will be closed in the nearby beam line vacuum sectors. Procedures will be made available that describe all steps in the normal operation of the CEDAR (empty before filling with Hydrogen, how to vent), as well in case of e.g. leak detection or window rupture. This includes the technical intervention, but also whom to inform and what alarms to send where.

VF14 31/03/11 Spares

Beam pipe connection VF15 31/03/11 The CEDAR must be connected to the vacuum beam pipe at both ends in such a way that a hydrogen leak is not accompanied by any admixture of air in order to prevent any risk of explosion. An important secondary consideration is that damage to sensitive detectors must be minimised by mitigating the effects of hydrogen leaks and the shock wave resulting from the potential rupture of the window at either end of the CEDAR

VF16 31/03/11 CEDAR – gas operation Before introducing any H 2 gas, the entire system (including the detector) is filled with clean and dry N 2 The detector is then pumped to vacuum using a dry membrane vacuum pump down to 5 mbar and willed with H 2 gas At the end of a physics run the Hydrogen is pumped out and the detector is refilled with nitrogen.