Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.

Slides:



Advertisements
Similar presentations
DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
Advertisements

HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
MDT PS DCS for ATLAS Eleni Mountricha
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
Web Based Monitoring DT online shifter tutorial Jesús Puerta-Pelayo CIEMAT Muon_Barrel_Workshop_07/July/10.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
LV and HV status of the RPC system RPC detector and trigger group.
Performance Tests and Control for the TRD-HV A. Markouizos, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE DCS Workshop CERN.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Rack Wizard LECC 2003 Frank Glege. LECC Frank Glege - CERN2/12 Content CMS databases - overview The equipment database The Rack Wizard.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
19/10/11FV 1 Behavior of generic HV channel. Mail’s survey: appeal for general policy VF2 19/10/11 Patrizia: “Based on the running experience of NA48,
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
ATLAS MDT HV – LV Detector Control System (DCS)
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
RPC Detector Control System
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System: towards the final system
RPC Detector Control System
RPC Detector Control System
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007

20/11/2007Il sistema di HV delle camere DT2 DT HV electrodes

20/11/2007Il sistema di HV delle camere DT3 HV layout 1 chamber Inside SY1527 A876 A877

20/11/2007Il sistema di HV delle camere DT4 HV layout 1 macrochannel= 1 layer = 4 HV channels

20/11/2007Il sistema di HV delle camere DT5 HV Hardware setup Global HV+ Global HV- LV A877  powers 1 DTA876 HV THETA HV PHI1 HV PHI2 MacroChannels (Set ON/OFF, RuP,…) HV LAYER1 OutputChannels (Set V0, i0…) Wires1 Wires0 Cathodes Strips >100 m

20/11/2007Il sistema di HV delle camere DT6 HV layout

20/11/2007Il sistema di HV delle camere DT7 HV modules 10 SY1527 (8 used by HV, 1 by LV, 1 spare) 65 A876 (60 used, 5 spares) A877 ( with 3 connectors, 60 with 2) (240 modules used, A877/3 spares) Apart from 5 A876, all modules have been received at CERN All modules have been tested

20/11/2007Il sistema di HV delle camere DT8 HV modules A876  60/60 modules received (77 produced by CAEN) 3 showed problems and have already been repaired (for 2 of those CAEN did not observe anything wrong) A877  With 2 connectors 60/60 received (63 produced by CAEN) Sent back to CAEN 12, on 7 nothing wrong found, on the remaining 5 some electronics faults were found (active components changed, hv cable disconnected, calibration redone, etc.). Repaired.  With 3 connectors 190/190 received 35 (!!) have been sent to CAEN to be repaired. On 15 modules nothing wrong found, on the other 20 found electronics problems (active components changed, hv cable disconnected, calibration redone, etc.). Repaired. Still at CAEN 4 A877

20/11/2007Il sistema di HV delle camere DT9 HV slow controls software Slow controls software is based on the SCADA environment PVSS. We have the largest slow controls system in operation at CERN with more than channels to control and monitor. When all channels will be operated together we will have 6 dedicated PCs to run the software as a distributed environment. Our slow controls system can be operated as stand alone or connected to the central CMS DCS.

20/11/2007Il sistema di HV delle camere DT10 DT HV System HV System HV Wheel-2HV Wheel+2HV Wheel-1 ………. HV MB1HV MB4 …….. HV Chamber 1HV Chamber 14 …….. HV SL 1HV SL 2HV SL 3 HV L1HV L2HV L4HV L3 IBeamsWires 1 Strips Wires 0 DUs CUs

20/11/2007Il sistema di HV delle camere DT11 HV DUs & CUs 3 types of DUs:  FwCaenChannelWires  FwCaenChannelStrips  FwCaenChannelIBeams States based on dpe actual.status & actual.vMon CUs:  HVLayerNode States: ON, OFF, RAMP_UP, RAMP_DOWN, OVERCURRENT, WARNING, TRIPPED, ERROR, ……  HVSLNode (“Translator” node type) States: PHYSICS, READY, NOT_READY, WARNING, ERROR, ……  HVGenericNode (for Chamber, Station and Wheel level?) States: PHYSICS, READY, NOT_READY, WARNING, ERROR, ……

DT Interactive UI (by R. Gomez-Reino Garrido) Java ActiveX based User Interface Reads geometry descriptions from EMDB Completely interactive Good for error tracking and correlation Easy integration into the supervisor FEATURES: FOR DEVELOPERS: Easy to use from PVSS Functions providing full control of the detector 3D panels. Create labels Create behaviors Automatically move the view and rotation points.

20/11/2007Il sistema di HV delle camere DT13 Example

20/11/2007Il sistema di HV delle camere DT14 Included functionalities (I) Monitoring, settings, FsMs trees,… Java Interface (R. Gomez-Reino)

20/11/2007Il sistema di HV delle camere DT15 Included functionalities (II) Connection to Oracle Configuration Db

20/11/2007Il sistema di HV delle camere DT16 Included functionalities (III) Connection to Oracle Condition Db

20/11/2007Il sistema di HV delle camere DT17

20/11/2007Il sistema di HV delle camere DT18

20/11/2007Il sistema di HV delle camere DT19 Procedures implemented Ramp up (single layer) in 4 steps:  3(1) intermediate state for Wires(Strips and I-Beams) Ramp down in 2 steps  1 intermediate state for Wires Recover from Trip:  Switch off the whole layer; after a delay switch on the layer using the ramp up procedure (check trip frequency, currents,…) OvC handling:  If OvC on Strips or I-Beams lower Wires voltage by 200 V  A877 boards not current limited; trip condition handled via software (now hardware trip time available too) Voltage difference check:  Every 20 sec. check of voltage difference btw Strips and Wires; if bigger than 1850 V (i.e. discharge regime), Wires voltage lowered by 200 V Check communication with power supplies

20/11/2007Il sistema di HV delle camere DT20 Conclusions We have all the modules of the HV system in hands at Cern. HV modules test was finished several months ago. All the A877 modules have been installed in the racks on the balconies Slow controls software ready and in operation since a long time. We have observed a relatively high number of faults in the A877 modules. Only a few in the A876 modules.

20/11/2007Il sistema di HV delle camere DT21 HV modules tests 4 different tests:  Test 1: Min. voltage, Max. current Resistive Loads  Test 2: Max. voltage, Max. current RC loads (same of Test 3)  Test 3: Ramping cycles RC loads (same of Test 2)  Test 4: Min. voltage, Null current No loads

20/11/2007Il sistema di HV delle camere DT22 HV modules tests “OvC with oscillating Voltage”  Observed during Test 1 in the majority of the newer A877 MB4 boards (no problems during Tests 2&3, where boards used in working range)  Hardware differences between the older A877 standard boards and the newer A877 MB4 boards? YES Some components of the newer boards have a different tolerance: this was causing a slightly different behavior of the channels in their standard working range → a capacitor was added to each channel CAEN assures that board performances in the standard working range is the same for all boards

20/11/2007Il sistema di HV delle camere DT23 Conclusions For the magnet test we plan to power a total of 14 DTs in sector 10 of wheel YB+1 and sectors 10 and 11 of wheel YB+2. The HV system used will be the final one manufactured by CAEN. Also aim at having also final cables, patch panels, etc. PVSS project with FSM integrated with the central CMS DCS will be available.