Irrigation Service Centre Project Part III: Results [July 2009 to June 2010] Coordination meeting 24 August 2010 A. Deligne, L. Piseth, S. Sophak.

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

Partnerships for Health Reform Public Sector Contracting of NGOs to Deliver HIV/AIDS Services: Case Studies from Brazil and Guatemala XIII International.
Strengthening statistical capacity in support of progress towards the Internationally Agreed Development Goals in countries of South Asia United Nations.
Minimum of 30 font size and maximum of 3 lines title By IWMI Irrigated agriculture value chains interventions.
Farmer Water User Community (FWUC)
THE STRATEGIC APPROACH IN MODERNIZING MUNICIPAL SERVICES Siegfried Brenke, Team Leader GTZ Project: Modernization of Municipal Services Takovska 9/14,
The CTCN Services UNEP – March 5th, 2014, Nairobi, Kenya.
CARICOM. Ninth EDF Project Caribbean Integration Support Programme (CISP ) Statistics Component 34th MEETING OF THE STANDING COMMITTEE OF CARIBBEAN STATISTICIANS.
Page 1 Regional Institutional Capacity Building in the Implementation of Clean Development Mechanism in ASEAN Countries March 2004 Jakarta, Indonesia.
SESSION 1: Sharing of Experience in GAFSP Processes in Cambodia, Nepal, Mongolia and Bangladesh (15 minutes to share, 15 minutes for open forum) Lessons.
Based on a criteria method. The FWUC capacity to undertake their main tasks:  Operation  Maintenance  Communication and relationship with farmers and.
Resource Mobilization In FAO Afghanistan
The SEE-ERA.NET project - a brief overview on the interim project results.
Climate Forum East  Armenia  Georgia  Azerbaijan  Belarus  Moldova  Ukraine.
Latvia–Lithuania Cross Border Cooperation Programme 2007–2013 WORKSHOP “How to prepare good application?” Joint Technical Secretariat 3rd.
Introduction and objectives for the aquaculture session 14/04/2009 Uganda HOMMA Ken (JICA / FAO) W/S: GCP/INT/053/JPN.
Welcome in Kompong Thom!. Irrigation Service Centre Project Coordination meeting 24 August 2010.
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
MINISTRY OF HEALTH OF THE REPUBLIC OF INDONESIA THE 2 ND WORKSHOP OF ASEAN FOCAL POINT ON HIA “CONSTRUCTING A CARING AND SHARING COMMUNITY: ROLES OF HIA”
PARIS21 Secretariat (Partnership in Statistics for Development in the 21 st Century) Millicent Gay Tejada 12 June th SAARCSTAT Meeting, Kathmandu,
Global Action Plan and its implementation in other regions Meeting for Discussion of the draft Plan for the Implementation of the Global Strategy to Improve.
Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop Role and Responsibilities of Field Monitors David Njue, Investment.
CULTURe EXchange Platform (CULTUR-EXP) Project Overview Prof. Ramaz Kvatadze Georgian Research and Educational Networking Association – GRENA
INTOSAI Public Debt Working Group Updating of the Strategic Plan Richard Domingue Office of the Auditor General of Canada June 14, 2010.
December To share best practices from the experience of 100 NSDS implemented over the last years. To take into account international community.
Policy and Regulatory Framework in Power Sector in Cambodia
Baltic Area Committee Meeting Tallinn 14 th -15 th June 2008 Industrial Relations (IR) Fritz Bekkadal Vice Chair & IRO Norway Section.
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
Phnom Penh Hotel 25 March 2010 Organized by the Irrigation Service Centre Workshop: “Support to FWUC: Reviews of Experiences and Strategies” Funded by.
The Slovak NGDO Platform. ● an interest group of legal entities ● 26 members: 19 regular members, 7 observers.
Process and methodology for collecting the Irrigation Service Fee (ISF) Phnom Penh Hotel - 25 March 2010 Presentation by Y Kadum, Community Specialist.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
ICT/ICM Status in Jordan Hesham Athamneh & Jordan Team.
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
Support to Water Users and to Services for Farmer Water Users’ Communities Projet d’Appui aux Irrigants et aux Services aux Irrigants ASIrri MOWRAM/AFD.
Alliance for Healthy Homes & Communities – Strategies and Priorities for 2014 October 1, 2013.
African Centre for Statistics United Nations Economic Commission for Africa Conclusions and Recommendations of the Friends of the Chair of the CSC Secretariat.
Federal Support for World-Class Schools Gwinnett County Public Schools 4/18/13.
National Planning Department. Mobilizing private investment for low carbon development October 14 th, 2015.
African Centre for Statistics United Nations Economic Commission for Africa Proposed Framework for Monitoring, Evaluation and Reporting Negussie Gorfe.
African Centre for Statistics United Nations Economic Commission for Africa Data compilation and management proposal for Africa Statistical Commission.
Transitional Committee for the Design of the Green Climate Fund – Workstream II Mandate – status of work, and work plan ecbi Seminar, Bonn 12th June 2011.
Irrigation Service Centre Project Part II: Intervention methodology Coordination meeting 24 August 2010 A. Deligne, S. Sophak.
CCC’s Bi-Monthly Member Meeting GHP Operational Plan 2016 By: Soeung Saroeun, ED EL Sotheary, HOP 08 December 2015, KSSA, Phnom Penh Vision: Sustainable.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
Water Services Trust Fund A presentation for Water Services Boards and Water Service Providers Eng. John Orwa 1  Support provided by the WSTF  Expectations.
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia Review and Future Plan of.
Kyrgyz Republic. WUA Forming Law of Water Users Unions (Associations) ( ). Standard constituent documents. Process of WUA forming Training of.
Water Resources Management
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
Irrigation Service Centre Project Part IV: Challenges Coordination meeting 24 August 2010 Antoine Deligne GRET ISC Project Coordinator.
Water Services Trust Fund Official Signing of the 2 nd Call for Proposals Contracts Tuesday 30 th March, 2010 WSTF-Funded Projects: WSTF Support, Expectations.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
Client logo appears here © 2010 The Centre The Coalition EEEC and ASE joint meeting, “Finding Synergies to Make the Case for Energy Efficiency in Europe.
Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL.
NGA Policy Academy Improving Oral Health Care for Children National Governors’ Association Center for Best Practices Project Overview.
September, 2005What IHE Delivers 1 A New Governance for IHE-Europe David Monteau, INRIA IHE-International Meeting, Nov
Stakeholders’ relations in irrigation development projects with and without Service Center Antoine Deligne GRET ISC Project Coordinator March 2010.
Annual Review 2011 Julian Abrams PART 2: PROJECT DELIVERY COSOP IFAD Country Strategic Opportunities Programme.
LARNAKA CYPRUS Mediterranean Network for the Promotion of Urban Sustainable Development Strategies Training Workshop Sustainable Development.
Project Debriefing Debriefing meeting on the implementation status of two ADB- JFPR funded projects: (i) Technical Assistance Strengthening Coordination.
Agricultural Cooperative Development in Cambodia
Water Services Trust Fund Field Monitors Training Workshop
Migration Secretariat for Access to Rights and Equity Department of Social Inclusion Continuous Reporting System on International Migration in the.
Working Group on Extractive Industries terms of reference (wgei)
Supporting Data for a KfW Financed Investment Project on the Montenegrin Coast 18 May 2017, Wien ●
Civil Protection Financial Instrument – Prevention Projects
2016 JAG Secretariat: DCA/CA & PIN Paul Conrad, PIN DM PM
Human resource and Work flow of the Research Office, RUPP
Inter-University Council for East Africa (IUCEA)
Presentation transcript:

Irrigation Service Centre Project Part III: Results [July 2009 to June 2010] Coordination meeting 24 August 2010 A. Deligne, L. Piseth, S. Sophak

ASIrri Project Objectives I. Establish one Service Centre in Kompong Thom II. Develop and test services adapted to FWUC III. Build up references and capitalize IV. Provide references to a national platform (advocacy) 2

Results for objective I: Establish one Service Centre in Kompong Thom  MoU signed between GRET and Kg Thom PDoWRaM for ISC project implementation  One office is open.  The team has been recruited.  Management and Coordination Committee set up  Communication tools have been designed.  Tentative budget plan proposed.  Extend financial capacities: EU-Food Facility  One external contract with Mundolkiri Excom - JICA funding 3

Results for objective II: Develop and test services adapted to FWUC Presentation per scheme (see Part III b) Type of services: – Create / reactivate FWUG (membership fee collection, election) – Database creation / maintenance – Small infrastructure rehabilitation – Water management rules participative decision making – Financial budget preparation, resources identification – Financial reporting 4

ISC working area in 2010 Baray Pram Kumpheak Teuk Chha Sdao Kong Prey Nup Machu Nga Stung Chinit East & North

Schemes supported by ISC

Results for objective III: Build up references and capitalize  Documents: Typology and Assessment methodology for irrigation systems in Cambodia  Workshop “Support to Farmer Water User Communities: Review of experiences and strategies” jointly organized by GRET – CEDAC  Internship about water management rules  Internship about financial services (starting)  CEDAC agricultural study for Pram Kumpheak, Teuk Chha and Stung Chinit East 7

Results for objective IV: Provide references to a national platform  One meeting and one exchange visit in Siem Reap organized with 12 FWUC: – South: Prey Nup (Sihanouk), O Veng, O Treng (Kg Speu) – East: Sdao Kong (Prey Veng) – Center: Prek Ta Roat Ta Ong (Kandal) – North: Kok Sandek, Teuk Chha, Pram Kumpheak (Kg Cham), Stung Chinit (Kg Thom) – North-west: Trov Kord, Baray (Siem Reap), Ponley (Banteay Meanchey)  Discussion to establish the Network and create membership  Stakes: - What is a good FWUC? - Which support from government? 8

FWUC network objectives 1. Promote responsibility, transparency and quality in FWUC management 2. Capacity building and exchange of experiences 3. Technical and financial support mobilization for FWUC 4. Information sharing (legal, funding, etc.) 5. Facilitate and improve relations with MoWRaM 6. Advocate for FWUC opinions regarding irrigation and water management issues 7. Represent members interests at national level and in irrigation forum 9