Sarasota Memorial Hospital Campus Improvement Plan Neighborhood Advisory Council October 12, 2010 Construction Update.

Slides:



Advertisements
Similar presentations
Some things cant wait for traffic Capital Beltway HOT Lanes Project Update – January 2011 New Travel Choices Ahead.
Advertisements

Hospital of the Future Construction Update as of Dec. 3, 2010.
Physicians Clinic Wellness Center Hospital Main Entrance Replacement Hospital Bond Issue Proposal.
SSM St Anthony Hospital Shawnee West MacArthur Campus Expansion and Renovation Shawnee, Oklahoma Design Development February 7, 2013.
Edna Maguire School Modernization - Phase 1 Summer 2012.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
February 10, 2010 Sarasota Memorial Health Care System Management Council February 10, 2010.
PAC/Garage/SCP South Campus Traffic Flow Logistics 6/28/2011.
Current Project Update October 25th 2012 Good Evening!!!
Campus signage – Internal
PVAMC Leases & Construction: Annual Update Quarterly Congressional Meeting Portland VA Medical Center.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
Rebuild Stafford High School Update- October 2014.
Administration & Finance November 18, 2014 Utility Corridor and Roadway Relocation Project Update (UCRR)
U-M Construction Forecast; April 2013 U-M Construction Forecast Spring – Fall 2013 As of April 25, 2013 Prepared by AEC Preliminary & Advisory.
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
University of Oregon Lewis Integrative Science Building Schematic Design October 21, 2009.
June 24, 2010 Sarasota Memorial Health Care System Projects Update Neighborhood Advisory Council June 24, 2010.
January 18, 2007 Campus Planning1 Update on Campus Planning and Construction Parnassus and Mission Bay Lori Yamauchi Assistant Vice Chancellor Campus Planning.
Phase Difference = Phase Difference = 0.05.
GRANT JOINT UNION HIGH SCHOOL DISTRICT Planning for the future preserving the past M A S T E R P L A N Conceptual Site Illustrative S O F T B A L L & P.
Presented by Bob Ruebusch, Senior Project Manager Office of Design & Construction.
Route 364 (Page Ave. Extension) The Missouri Department of Transportation.
General Faculty Meeting October 9, 2012 By: Dan King By: Dan King Assistant Vice President 1.
Cleveland State University, Division of Capital Planning Connecting Cleveland October 2010.
Capital Improvement Plan “Building a World of Opportunities ” Laredo Independent School District Construction/Facilities Committee Meeting October 9, 2001.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
Building Plans.
ProjectONE Update 56 th Medical Reunion Weekend September 12, 2009.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
LOS ALAMOS COUNTY JUDICIAL / POLICE – JAIL COMPLEX 60% SUBMITTAL August 8, 2008.
Modernization Project Identify Priorities – Patient Safety Quality of Care Efficiency Discover Opportunities - Existing Hospital Garner Regulatory Support.
Shepley Bulfinch / Planning May 20, 2008 Medical College of Georgia Master Plan Update.
A PLAN TO BUILD AN ELEVATOR October 15, Long-Range Plan –Office-size Elevator –New Fireproof Stairs –Handicap-Accessible Restrooms –Large Multi-purpose.
Winchester Medical Center Campus Expansion June 21, 2011.
Treston Hardin. Motherboard A motherboard holds all of the important components to power the computer.
Phase III Design Development Finalization December 23, 2008 apcosigns.com.
City of Appleton Stormwater Management Update Presented to the January 22, 2013 Utilities Committee.
BUILDING UPDATE AUGUST 23,2014. BUILDING “A” NORTHEAST VIEW.
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
North Augusta High School Design Development Presentation.
Higher Apprenticeships Negat Lodhi Apprenticeships Development Manager National Apprenticeship Service London and South East October 2013.
U-M Construction Forecast, March 24, 2011 U-M Construction Forecast Spring – Fall 2011 As of March 24, 2011 Prepared by AEC Preliminary & Advisory.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
SEDONA RED ROCK HIGH SCHOOL October 9, 2008 SCHEMATIC DESIGN – PHASE 2.
Sarasota Memorial Hospital Campus Improvement Plan Neighborhood Advisory Council March 13, 2012.
Course Evaluation Project - Update Presentation to Senate October 19, 2015 Mark Seasons.
Convocation of Governments January 15, Sarabeth Kalajian, Director Libraries and Historical Resources Sarasota County Todd Bowden, Executive Director.
MGH 2.0 Marin General Hospital Finance Committee Meeting November 19, 2015.
Presentation to President’s Cabinet February 16, 2016.
Show Chuan Memorial Hospital Phase I: Personnel movement & contact history (target high risk area – Emergency/fever segregation ward) SARS related medical.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
..... Deep Foundations Institute Project Nominee San Francisco-Oakland Bay Bridge New East Span.
肝臓移植
Signage Upgrade Project 2016
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Penn Medicine Chester County Hospital
Inspire Elementary School
2012 and 2014 Bond Update Citizens’ Bond Oversight Committee
Children’s Hospital Update
projects update ATLANTA district
ELEVATOR CLOSURES: JANUARY-FEBRUARY 2019
Humanities and Social Sciences Upper Level Northeast: Accessible Entrance
Project 2018 October 31, 2018.
North Augusta High School – Phase 2A and 2B
Southwood/Fargo Country Club Flood Risk Management Project
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
Chapter 1 Section 7 How do you read a map?
Presentation transcript:

Sarasota Memorial Hospital Campus Improvement Plan Neighborhood Advisory Council October 12, 2010 Construction Update

Project Phasing 1 & 2: Demolish CEP, Pre-Moves, New Garage Entry/Exit Demolish Old CEP Temporary Entry/Exit at Waldemere Garage Central Receiving Complete – 1-Waldemere New CEP Completed Information Systems Complete – 5-Service Wound Care – 2-Waldemere Observation Complete – 9-East Surgery/CS Vertical Expansion On-Call – 4-Central Interim Moves for Surgery Support & Pathology Temporary ECC Turn-around & Canopy Temporary Main Entrance Canopy 2 Legend: Green box means that portion will be completed in that phase. Beige box is ongoing. 2

Project Phasing 3 & 4: Temporary Drive, Complete Fall 2010 Temporary ECC Turn-around & Canopy Complete Wound Care – 2-Waldemere Surgery/CS Vertical Expansion Moves for Surgery Support & Pathology Complete Sitework & Temporary Drive Demolish Portion of Critical Care Tower 3 Legend: Green box means that portion will be completed in that phase. Beige box is ongoing. 3 Temp Main Entry Turn-around & Canopy On-Call 3-East

Project Phasing 5: Demolish Northeast Wing and Main Entry, Begin Bridge Sitework & Temporary Drive Temp Main Entry Turn-around & Canopy ECC Vestibule, Canopy and Drop-off Complete Demolish Northeast Tower Main Entry Canopy Structure for Bridge, Elevator & Stair Surgery/CS Vertical Expansion 4 Legend: Green box means that portion will be completed in that phase. Beige box is ongoing. 4

Project Phasing 6: Patient Tower Foundations, South Connector Complete Winter Surgery/CS Vertical Expansion & Connector to So. Garage New Patient Tower Foundations Structure for Bridge, Elevator & Stair 5 Legend: Beige box is ongoing. 5

Project Phasing 7: Patient Tower Structure, Surgery / CS, Surgery/CS Vertical Expansion & Connector Complete New Patient Tower Structure 6 Legend: Green box means that portion will be completed in that phase. Beige box is ongoing. 6