P. Paolucci - I.N.F.N. di Napoli 1 30-01-2006 / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
MDT PS DCS for ATLAS Eleni Mountricha
LV and HV status of the RPC system RPC detector and trigger group.
Low Voltage LB status RPC detector and trigger group.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Detector Control System
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
ATLAS MDT HV – LV Detector Control System (DCS)
RPC Barrel HV & LV system Lappeenranta University
Cosmic Ray Tracker and Detector Control System at the GIF++
HV & LV status LV system in W+1 and W+2 is OK
RPC HV&LV systems Introduction Detector description Requirements
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
The IFR Online Detector Control at the BaBar experiment at SLAC
RPC Detector Control System
23 Barrel chambers and 12 Endcap chambers
HV Imon in 1th MTCC period
RPC Detector Control System
RPC Detector Control System
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
The IFR Online Detector Control at the BaBar experiment at SLAC
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Dr. Pierluigi Paolucci - INFN di Napoli
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System: towards the final system
RPC Detector Control System
HV & LV status LV system in W+1 and W+2 is OK
RPC Detector Control System
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
23 Barrel chambers and 12 Endcap chambers
Pierluigi Paolucci & Giovanni Polese
CSC Electronics Installation and Commissioning Oct ‘06
Presentation transcript:

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and P. Paolucci HV & LV:D. Lomidze and P. Paolucci NEWS DCS Endcap Integration DCS Barrel Integration see Giovanni talk 1 PC with barrel project working at PC with endcap project at 904 asap HV-LV test setup is going on at BLG 904

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack# A3486 LV336 (11 watt/ch) < 900*1< 9001ch/rack HV (10 watt/ch) < 600**3< 18002ch/rack A3486 AC/DC has 2 channels of 2 KW each * 3 boards with safety factor 2 ** 6 boards with safety factor 2

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY crate back schema

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY crate connection schema ConnectorCostCablecost 48V powerAPP - 75A red/black + pin (14-8 awg) ( mm2) KW2.5 (black) (red) (2 pins) = V serviceAPP - 30A red/black + pin ( awg) (1.5-4 mm2) KW0.52(black) (red) (2 pins) = 1.58 EASY bus50 pins flat cable8.39Flat 50 wires EarthFork 7mm0.10

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting NEW USC55 barrel HV system General Information max HV EASY board: 7 ch. max EASY crate: 42 ch. HV distributor: 32 input ch (2 sectors) 16 output ch. Rack height tot:56 U turbine4 U air defl.2 U Rack available height 50 U Total: 72/96 ch. We need (per wheel/rack) 72 ch  12 HV boards (reduced*) 96 ch  16 HV boards (final) 3 EASY crate (4-4-4) (6-6-4) 3 FAN crates + heat exchange 6 distributors + 1 RB4-sect4 join * RB3 and RB4 joint together ( ) 8U EASY fan tary heat exchange EASY fan tary heat exchange 8U EASY fan tary heat exchange 8U 44 U 36 input ch. 24 input ch. 48 output ch. 36 ch. 24 ch. 12 ch. 24 ch. HV distributor sect HV distributor sect sect output ch. HV distributor sect HV distributor sect sect HV distributor spare turbine 4U air deflector 2U S1H02-06

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting 34U AC/DC 48V power 3U 2x2 KW S1H07 turbine air deflector 2U 4U NEW USC55 HV barrel racks composition SY1527 HV SY1527 LV 8U AC/DC 48V power 3U 2x2 KW AC/DC 48V service 3U 2x2 KW HW numbers 15 EASY crates HV boards A HV channel 30+4 HV distributors 2 SY1527 mainframes 3 or 4 AC/DC 48 V - A3486 (or A3485) CABLE numbers EASY power (direct)5 EASY power (daisy)10 EASY service (direct)2 EASY service (daisy)14 Branch Contr. (direct)2 Branch Contr. (daisy)14 Fan unit contr.15 EASY Ground -15 SY1527 ground HV input HV out AC/DC 48V power 3U 2x2 KW (spare ?) 136 components 800 cables

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV status Setup at 904 is finished. MTCC setup is almost ready Setup ready for Cosmic Challenge in March 06 Move from 904 to SX5 in April 06

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting LV MTCC setup 2 LV EASY crates OK 2 LV boards A3009 (2 sectors) 1 LV board A3009 (1 sector) Short cables and connections are OK Waiting for lengths for long cables. 2 Control cables

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV MTCC setup 1 HV EASY crates OK 4 HV boards A3512 (3 sectors) Short cables and connections are OK Waiting for lengths for long cables. 3 multi-conductors cables

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting RPC DCS status Barrel and Endcap projects are ready Two PCs running the projects are at 904 Integration with CMS DCS is almost ready, some common problems still to fix RPC DCS will be ready for May 2006

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting Next Steps Define the hardware of the endcap system Install the system at SX5 Build and install long cables Test it in April-May to be ready for CC

HW schema for CC BC LV BC LV BC HV RPC - SY1527 HV – EASY – 24 ch. HV AC/DC HV – MAO – 2 ch. Balcony Barack 48 V – service LV Control LV Detector PWR HV Control HV W+2 W+1 LV – EASY – 12 ch. LV LV – MAO – 1 ch. LV – EASY – 24 ch. LV LV – MAO – 1 ch. PWR HV AC/DC phase HV multicond. 10 ch.

/ Joint RPC- Trigger meetingP. Paolucci - I.N.F.N. di Napoli13 RPC FSM Hierarchy Endcap RPC Endcap Supervisor Disc Ring Chamber Barrel RPC Barrel Supervisor Device level Wheel Sector Chamber Channel HV/LV Sys CMS_RPC Since the last meeting: The endcap is up to date with the barrel and the two systems are proceeding in parallel Tests on CPU and RAM usage have brought us to reduce the number of CUs. Limiting to the top two levels. Possibility of using only wheels or disks in standalone mode as lower nodes. Introduction of a new level in the hierarchy. This will allows a better partitioning of the system. The two systems are under a single top node as required by the CMS DCS Integration guidelines. The two systems can also work standalone. Device level Channel HV/LV Sys NEW LEVEL CU LU

/ Joint RPC- Trigger meetingP. Paolucci - I.N.F.N. di Napoli14 RPC DCS for MTCC Endcap RPC Disc Ring Chamber Barrel RPC Device level Wheel Sector Chamber Channel HV/LV Sys CMS_RPC Since the last meeting: Intensive (2 weeks) test with HW at 904 building induced us to perform Minor changes to the FSM schema Redesign Hierarchy and distribution on more PCs. We are investigating How distribute the HW component on more PCs and the resources needed. Device level Channel HV/LV Sys PC01 Supervisor PC02 PC03.. PC04.. DATABASE We are able to receive and upload the HW setup into the project from Oracle DB We are able to download different configuration setup from DB for ON and StandBy states Conf. DB

/ Joint RPC- Trigger meetingP. Paolucci - I.N.F.N. di Napoli15 RPC DCS Integration Status We were successful in creating a first version of the CMS RPC sub- detector SUPERVISOR component using the tool provided by the JCOP framework. The RPC component contains both Endcap and Barrel trees, but it has been designed has two components that can work on different PCs. We accessed the Configuration DB. We are able to read from and write in it (in a private Oracle DB) using custom scripts with Framework functions. We still need to - know the coordinates of the DB we are going to use for the CC and test the best way to access the DB (different solutions are possible) - finish to prepare the hardware component (march 06) - work on the condition DB - temperature monitoring (waiting for JCOP FW)

16 CMS RPC Gas Monitor Frascati Group A monitoring system of the RPC work point which is able to provide much faster and sensitive response than the CMS RPC system. A monitoring system of the RPC work point which is able to provide much faster and sensitive response than the CMS RPC system. Monitor efficiency and charge continuously Monitor efficiency and charge continuously If work point changes, alarm goes off and DSC systems (GC,probes, etc) verify what the change of work point is due to. If work point changes, alarm goes off and DSC systems (GC,probes, etc) verify what the change of work point is due to.

17 RPC Gas Monitor v.1 C 2 H 2 F 4 /SF 6 /i-C 4 H 10 /H 2 O Slow Ctrl GC, p/T/RH/Ph RPC PAD source MONITOR RPC PAD source CMS RPC PAD source REFERENCE

18 DAQ system for the CMS RPC Gas Monitor The system must be integrated in the Slow Control (SC) of CMS RPC. This implies to follow the CMS standards for DAQ: PVSS or xDAQ The system must be integrated in the Slow Control (SC) of CMS RPC. This implies to follow the CMS standards for DAQ: PVSS or xDAQ We are evaluating different solutions in order to minimize the effort in the integration with CMS Slow Controls We are evaluating different solutions in order to minimize the effort in the integration with CMS Slow Controls Our present option is to use a system fully based on PVSS both for P,T, RH and HV, and both for ADC, (+TDC...+ other VME module) readout based on VME standard Our present option is to use a system fully based on PVSS both for P,T, RH and HV, and both for ADC, (+TDC...+ other VME module) readout based on VME standard Standalone systems (PICO, ACQIRIS, etc) do not seem to offer the same versatility of a VME system and comparable performances Standalone systems (PICO, ACQIRIS, etc) do not seem to offer the same versatility of a VME system and comparable performances VME readout via PVSS ? VME readout via PVSS ?

19 Temptative DAQ architecture for the CMS RPC Gas Monitor Pressure, temperature & humidity sensors VME modules for RPC pads readout ● Controller VME CAEN ● ADC V1724A - 8CH 14BIT 100MHZ ● Scaler V830AC - 32 Channel 32 Bit ● Crate VME8002 MINI VME64 09 SLOT ● TDC V1290A - 32 Ch /25 psec CAEN HV system PVSS CMS SlowControl ?